Block 5847, lot 032
300 Gaven St
31 permits filed for this property since 2000.
CompletedIn progressNever finaledExpired or cancelled
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 26, 2025 | Completed final sign-off Aug 2025 | 300 Gaven St | Pro Superior Construction Inc | remove old wood siding and install 4200 sqft of new james hardie siding on entire building except right side play area wall. street visible | $99,000 |
| May 5, 2022 | Completed final sign-off Sep 2022 | 300 Gaven St | Truebeck Construction | mechanical upgrades for the existing classroom building (edeli building) at the sf school. | $50,000 |
| May 5, 2022 | Completed final sign-off Sep 2022 | 300 Gaven St | Truebeck Construction | new finishes, casework, and lighting on an existing music room at the sf school. | $50,000 |
| Dec 16, 2021 | Expired or cancelled withdrawn Sep 2022 | 300 Gaven St | Truebeck Construction | revision to permit 202011128771 to remove (e) wall heater from scope of improvements. no other changes proposed. | |
| Jul 13, 2021 | Completed final sign-off Aug 2021 | 300 Gaven St | H & M Fire Protection, Inc. | relocate (7) fire sprinklers for t.i. in pre-k classrooms. | $2,100 |
| Jul 13, 2021 | Completed final sign-off Aug 2021 | 300 Gaven St | H & M Fire Protection, Inc. | fire sprinkler t.i. for middle school classrooms. ref app#202011128771. | $1,800 |
| Jul 7, 2021 | Completed final sign-off Aug 2021 | 300 Gaven St | Siemens Industry, Inc. | fire only work for the middle school remodels on floor 1; additions are 6 smoke detectors, 1 module, 1 horn/strobe power supply, 14 horn/strobes, and 3 strobes. ref pa# 202011128790 & 202011128771. | $16,430 |
| Nov 12, 2020 | Completed final sign-off Oct 2022 | 300 Gaven St | Truebeck Construction | minor alteration. replacement of (e) glazing with accordian door at middle school building. (n) door & sidelights at middle school admin office entrance. ** maher: n/a ** | $100,000 |
| Nov 12, 2020 | Completed final sign-off Oct 2022 | 300 Gaven St | Truebeck Construction | minor alteration. modernization and structural upgrades to preschool building. new preschool and kindergarden bathrooms. new door in (e) window opening. ** maher: n/a ** | $235,000 |
| Nov 3, 2020 | Completed final sign-off Feb 2021 | 300 Gaven St | Bay Alarm Company | per 2019 cfc section 907.2.3 for group e buildings installaing a manual and automatic fire alarm system in a temporary portable modular classroom modular a and b east | $13,470 |
| Jul 16, 2020 | Completed final sign-off Nov 2020 | 300 Gaven St | Ftan General Construction | installation of 2 temporary modular classrooms. installation matches previosly approved installation under app#201203266887 | $20,000 |
| May 31, 2018 | Completed final sign-off Aug 2019 | 300 Gaven St | Nabi Construction & Engineering Inc | voluntary seismic upgrade - sheathing added to (e) wall, infill (e) opening, add new collector straps. **maher n/a** | $62,800 |
| May 20, 2013 | Never finaled issued May 2013, no final | 300 Gaven St | Bay Build Design Inc | to obtain final inspection for work approved under app #201005112124 all work is complete | |
| May 20, 2013 | Never finaled issued May 2013, no final | 300 Gaven St | Bay Build Design Inc | to obtain final inspection, for work approved under ap #201106168227 all work is complete | |
| May 8, 2013 | Completed final sign-off May 2013 | 300 Gaven St | Plant Construction Company Lp | install elevator lobby evacuation signs on levels 1, 2, 3 at each elevator lobby. (main pa #2011.11.22.9458). | $1,000 |
| Nov 2, 2012 | Never finaled issued Nov 2012, no final | 300 Gaven St | revision to pa# 2011-1122-9458-change rated openings at 2 hour stair #2 to non rated openings | $5,000 | |
| Aug 8, 2012 | Completed final sign-off May 2013 | 300 Gaven St | Siemens Industry, Inc. | installation of a new fire alarm system to replace (e) system at the "s.f. school community center". this work will be done in 2 phases as noted on the scope of work in drawing "fa01". (1) facp, (1) ann, 6 relay, 3 smk dct, 18 horn/8 trobes, 15 strobes, 3 (wp0 horn/strobes, 2 batt. | $31,000 |
| Jul 19, 2012 | Never finaled issued Jul 2012, no final | 300 Gaven St | Northwest Security Inc. | install a locatl fire alarm system i each of the 2 temporary portable buildings | $2,400 |
| Jul 2, 2012 | Never finaled issued Jul 2012, no final | 300 Gaven St | street space | ||
| Jun 25, 2012 | Completed final sign-off May 2013 | 300 Gaven St | R C Underground Inc | install 6" underground fire service for pa#201205231072. 6 inches bfp wih meter- | $10,000 |
| May 23, 2012 | Completed final sign-off May 2013 | 300 Gaven St | Allied Fire Protection | new fire sprinkler system in (305 sprinklers)(n) 2-story bldg per nfpa 13. underground under separate permit. | $93,791 |
| Mar 30, 2012 | Completed final sign-off Sep 2012 | 300 Gaven St | renovation of existing 2 story classroom building. new exterior wal and interior finishes | $75,000 | |
| Mar 26, 2012 | Expired or cancelled expired Nov 2020 | 300 Gaven St | Plant Construction Company Lp | 2 new disabled access ramps for portable classrooms to be used during construction. | $20,000 |
| Nov 22, 2011 | Completed final sign-off May 2013 | 300 Gaven St | Plant Construction Co, Lp | demolish (e) 1 story, wood framed structure & replace with 2 story horizontal addition plus mezzanine type 5b fully sprinklered. fire sprinkler & alarm under separate permit. | $3,250,000 |
| Jun 24, 2011 | Completed final sign-off Jul 2011 | 300 Gaven St | Sun Roofing & Constr. Company, Inc. | reroofing | $40,000 |
| Jun 16, 2011 | Never finaled issued Jun 2011, no final | 300 Gaven St | Peter Nestler Builder | renovation and access upgrades to an extg 1964 classroom serving a pre-school and kindergarten. improvements include:new ceiling, lighting, accessible doors, restroom access upgrades, and a new classroom kitchen. no structural or mechanical work. no new area added. same student count- no change- | $90,000 |
| May 11, 2010 | Never finaled issued May 2010, no final | 300 Gaven St | Bay Build Design Inc | interior renovation of an existing pre-school classroom including a new bathroom, lighting, ceiling grid & a new accessible door | $75,000 |
| Feb 22, 2005 | Completed final sign-off Sep 2005 | 300 Gaven St | Oxypower Inc Dba Occidental Power | solar electric system consisting of 164 sharp 175 w pv modules & 5 sma 6000v inverters. | $122,000 |
| Jun 4, 2004 | Completed final sign-off Sep 2005 | 300 Gaven St | Red Top Electric Co Emeryville Inc | fire alarm system upgrade to herbst bldg | $10,000 |
| Jun 4, 2004 | Completed final sign-off May 2013 | 300 Gaven St | Red Top Electric Co Emeryville Inc | fire alarm system upgrade to extg main bldg | $10,000 |
| Jan 22, 2000 | Completed final sign-off Jul 2000 | 300 Gaven St | new fire sprinkler system | $18,000 |