Block 3721, lot 004
116 01st St
- City’s use
- Commercial Office
- Built
- 1988
- Stories
- 27
- Lot
- 1,575 sq ft
- Zoning
- C3O
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
88 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 14, 2022 | Completed final sign-off Feb 2023 | 100 01st St | Sabah International Incorporated | 26/f: tenant improvement fire alarm system modification to existing elevator landing two-way emergency comm system.Details
26/f: tenant improvement fire alarm system modification to existing elevator landing two-way emergency comm system. | $48,101 |
| Aug 25, 2022 | Completed final sign-off Nov 2023 | 100 01st St | Sabah International Incorporated | 13/f-phase 1&2: f/a t.i. phase 1: add 7 speaker strobes, 2 strobes, 6 smk det, 2 pull station/2contrlrelay; phase 2: add 1 booster power supply, 1 synch output mod, 24 speaker/strobes, 1 strobe, 1 smk det, 14 duck smk det, 14 control relay. ref bpa#202205124064Details
13/f-phase 1&2: f/a t.i. phase 1: add 7 speaker strobes, 2 strobes, 6 smk det, 2 pull station/2contrlrelay; phase 2: add 1 booster power supply, 1 synch output mod, 24 speaker/strobes, 1 strobe, 1 smk det, 14 duck smk det, 14 control relay. ref bpa#202205124064 | $19,062 |
| Sep 25, 2018 | Completed final sign-off Aug 2019 | 100 01st St | Novo Construction Inc | 4/f: mechanical, electrical & plumbing for tenant improvemnt 4th fl ref pa#201808076647 & 201812057473Details
4/f: mechanical, electrical & plumbing for tenant improvemnt 4th fl ref pa#201808076647 & 201812057473 | |
| Aug 17, 2018 | Completed final sign-off Oct 2018 | 100 01st St | Sabah International Incorporated | ti# 201806071283. modify (e) fire alarm system. relocate 1 wall speaker/strobe add 1 wall strobeDetails
ti# 201806071283. modify (e) fire alarm system. relocate 1 wall speaker/strobe add 1 wall strobe | $6,500 |
| Jun 4, 2018 | Completed final sign-off Aug 2018 | 100 01st St | Sabah International Incorporated | 14th floor: provide modification of the extg system. t.i. app#201803123385Details
14th floor: provide modification of the extg system. t.i. app#201803123385 | $29,236 |
| Jan 22, 2018 | Completed final sign-off Apr 2018 | 100 01st St | Field Construction Inc. | new chese shop in existing commercial space. new counters, refrigerators, stainless sinks, new lighting and water heater. ste 165Details
new chese shop in existing commercial space. new counters, refrigerators, stainless sinks, new lighting and water heater. ste 165 | $30,000 |
| Jan 8, 2018 | Completed final sign-off Mar 2018 | 100 01st St | Sabah International Incorporated | as built fire alarm 201711214523, add 6 new ceiling speaker strobesDetails
as built fire alarm 201711214523, add 6 new ceiling speaker strobes | |
| Nov 21, 2017 | Completed final sign-off May 2024 | 100 01st St | Sabah International Incorporated | 25th fl - provide a modification of existing fire alarm system relocate (4) existing ceiling speaker/strobe. add 3 new ceiling speaker/strobe, 4 duct smoke detector & 4 control relay ref pa 2017-1013-1195Details
25th fl - provide a modification of existing fire alarm system relocate (4) existing ceiling speaker/strobe. add 3 new ceiling speaker/strobe, 4 duct smoke detector & 4 control relay ref pa 2017-1013-1195 | $10,782 |
| Oct 20, 2017 | Never finaled issued Oct 2017, no final | 100 01st St | Sabah International Incorporated | f/a: provide modification of the (e) fa system on 25th fl. ref ti #2017-0630-0796. 1 new smoke, 1 ceiling spkr/str, 1 control relay for door holdersDetails
f/a: provide modification of the (e) fa system on 25th fl. ref ti #2017-0630-0796. 1 new smoke, 1 ceiling spkr/str, 1 control relay for door holders | $8,143 |
| Aug 17, 2017 | Completed final sign-off Aug 2017 | 100 01st St | Sabah International Incorporated | suite #355: add 4 new ceiling speaker/strobe. ref app#201609218339Details
suite #355: add 4 new ceiling speaker/strobe. ref app#201609218339 | $9,194 |
| Jan 13, 2017 | Never finaled issued Jan 2017, no final | 100 01st St | Sabah International Incorporated | 22nd floor: as built drawings for fire alarm showing smoke detector was not installed at elevator lobby 22nd floor. per app#201603020940. t.i. ref app#201512114852Details
22nd floor: as built drawings for fire alarm showing smoke detector was not installed at elevator lobby 22nd floor. per app#201603020940. t.i. ref app#201512114852 | |
| Nov 30, 2016 | Completed final sign-off Jan 2017 | 100 01st St | Sabah International Incorporated | 25th fl. provide modification of (e) fire alarm. remove 10 (e) ceiling speakers. remove 12 smoke detectors. add 14 new ceiling speaker/strobes. add 1 duct detector. relocate 1 smoke detector. reference ti 2016.08.31.3421Details
25th fl. provide modification of (e) fire alarm. remove 10 (e) ceiling speakers. remove 12 smoke detectors. add 14 new ceiling speaker/strobes. add 1 duct detector. relocate 1 smoke detector. reference ti 2016.08.31.3421 | $14,626 |
| Oct 21, 2016 | Completed final sign-off Oct 2016 | 100 01st St | Sabah International Incorporated | 3/f- add 10 new ceiling speaker/strobes. t.i. pa#201609218339 & 201610120016Details
3/f- add 10 new ceiling speaker/strobes. t.i. pa#201609218339 & 201610120016 | $14,617 |
| Jun 30, 2016 | Completed final sign-off Aug 2016 | 100 01st St | Sabah International Incorporated | 12th flr, ste.1250: add 3 smoke detectors, relocate 3 existing smoke detectors, add 16 ceiling speakers/strobes and 1 duct smoke detector. remove 6 (e) ceiling speakersDetails
12th flr, ste.1250: add 3 smoke detectors, relocate 3 existing smoke detectors, add 16 ceiling speakers/strobes and 1 duct smoke detector. remove 6 (e) ceiling speakers | $8,658 |
| Mar 14, 2016 | Expired or cancelled withdrawn Jun 2016 | 100 01st St | Commercial Interior Builders Inc | revision to pa 2015-1211-4852 verify exit signage in the elevator lobby and compliance with section 1008.1.9-12 for acrd reader in elevator lobby.Details
revision to pa 2015-1211-4852 verify exit signage in the elevator lobby and compliance with section 1008.1.9-12 for acrd reader in elevator lobby. | |
| Mar 2, 2016 | Completed final sign-off Jan 2017 | 100 01st St | Sabah International Incorporated | 3rd flr: r&r 6 smk det. remove (e) wall mount strobes and ceiling mount speakers. install 11 new speakers/strobes in hallwayDetails
3rd flr: r&r 6 smk det. remove (e) wall mount strobes and ceiling mount speakers. install 11 new speakers/strobes in hallway | $7,315 |
| Mar 2, 2016 | Never finaled issued Mar 2016, no final | 100 01st St | Sabah International Incorporated | 22nd flr: modification of (e) fire alarm system. ref pa 2015 1211 4852. add 1 new smoke detector, 1 central relay, 8 new ceiling speakers/strobes. relocate 1 wall mounted strobe & 1 ceiling speaker.Details
22nd flr: modification of (e) fire alarm system. ref pa 2015 1211 4852. add 1 new smoke detector, 1 central relay, 8 new ceiling speakers/strobes. relocate 1 wall mounted strobe & 1 ceiling speaker. | $10,357 |
| Jul 10, 2015 | Completed final sign-off Oct 2015 | 100 01st St | Commercial Interior Builders Inc | selective demo of designated partitions, flooring, plumbing fixtures, ceilings, lights as indicated on plans per ab-017. tenant improvement under separate permit.Details
selective demo of designated partitions, flooring, plumbing fixtures, ceilings, lights as indicated on plans per ab-017. tenant improvement under separate permit. | $15,134 |
| Feb 24, 2015 | Completed final sign-off May 2015 | 100 01st St | Sabah International Incorporated | fire alarm ti 12th floor- provide modification of the (e) system relocate 2 (e) smoke detectors, demo (1) smoke detector, add (1) new speaker/strobe, change candela (2) s/strobe. no mechanical changes ti permit: 2014-1223-4367Details
fire alarm ti 12th floor- provide modification of the (e) system relocate 2 (e) smoke detectors, demo (1) smoke detector, add (1) new speaker/strobe, change candela (2) s/strobe. no mechanical changes ti permit: 2014-1223-4367 | $6,841 |
| Feb 24, 2015 | Never finaled issued Feb 2015, no final | 100 01st St | Sabah International Incorporated | provide a modification of the (e) fire alarm system for ada strobe coverage. install (9) new ceiling speaker/strobes, remove and replace (11) existing speaker/strobes, relocate (5) (e) smoke detectors. 12th floor ti permit 2014-1223-4367Details
provide a modification of the (e) fire alarm system for ada strobe coverage. install (9) new ceiling speaker/strobes, remove and replace (11) existing speaker/strobes, relocate (5) (e) smoke detectors. 12th floor ti permit 2014-1223-4367 | $14,850 |
| Feb 24, 2015 | Completed final sign-off Mar 2015 | 100 01st St | Sabah International Incorporated | 13th floor: add (2) smk det & (1) control relay to (e) system. no mechplans - detectors are for elevator lobby door. ti permit 2014-0825-4609Details
13th floor: add (2) smk det & (1) control relay to (e) system. no mechplans - detectors are for elevator lobby door. ti permit 2014-0825-4609 | $5,483 |
| Feb 12, 2015 | Completed final sign-off Jun 2015 | 100 01st St | Commercial Interior Builders Inc | 12th floor - revision to pa #2014.1126.2611: relocation of tenant suite entry door.Details
12th floor - revision to pa #2014.1126.2611: relocation of tenant suite entry door. | |
| Feb 5, 2015 | Completed final sign-off Jul 2015 | 100 01st St | Commercial Interior Builders Inc | 12th floor: lighting and mechanical work per title 24, work includes new lights and installing new grilles, relocate existing grilles and duct work. ref. to pa#201411262611 for architectural work. revision to arch is 2015-02128131.Details
12th floor: lighting and mechanical work per title 24, work includes new lights and installing new grilles, relocate existing grilles and duct work. ref. to pa#201411262611 for architectural work. revision to arch is 2015-02128131. | $42,000 |
| Jan 16, 2015 | Completed final sign-off Feb 2015 | 100 01st St | Commercial Interior Builders Inc | ste 1250: demolition of some existing ceiling height partitions, demolition of some existing suspended acoustic ceiling and associated lighting and hvac. per ab-017. tenant improvement under separate permit.Details
ste 1250: demolition of some existing ceiling height partitions, demolition of some existing suspended acoustic ceiling and associated lighting and hvac. per ab-017. tenant improvement under separate permit. | $25,000 |
| Jan 2, 2015 | Completed final sign-off Jan 2015 | 100 01st St | Anderson, Rowe & Buckley, Inc. | 12th flr: arch permit 201411262611; fire sprk t.i., relocate 15 hds, add 1 head,total 16 headsDetails
12th flr: arch permit 201411262611; fire sprk t.i., relocate 15 hds, add 1 head,total 16 heads | $8,000 |
| Nov 26, 2014 | Completed final sign-off Jul 2015 | 100 01st St | Commercial Interior Builders Inc | 12th floor: new corridor being created on a multi tenant floor. 2 new demising walls. elevator lobby work. etc, mep, sprinkler or life safety work if needed will be under 201501054876 separate permit.Details
12th floor: new corridor being created on a multi tenant floor. 2 new demising walls. elevator lobby work. etc, mep, sprinkler or life safety work if needed will be under 201501054876 separate permit. | $328,000 |
| Nov 12, 2014 | Completed final sign-off Jan 2015 | 100 01st St | Sabah International Incorporated | 5th & 7th floor: modification to existing system. add 4 new strobe. relocate 3 existing strobe and provide 2 existing strobe. ref. appl. 201407141208.Details
5th & 7th floor: modification to existing system. add 4 new strobe. relocate 3 existing strobe and provide 2 existing strobe. ref. appl. 201407141208. | $8,096 |
| Aug 21, 2014 | Completed final sign-off Nov 2014 | 100 01st St | Sabah International Incorporated | 11th floor - modify (e) fire alarm system. demo 3 strobes, 3 speakers and 3 smoke detectors. add 7 ceiling speakers, relocate 4 existing strobes and 12 existing smoke dectors. ref. appl. 2014.0603.7389.Details
11th floor - modify (e) fire alarm system. demo 3 strobes, 3 speakers and 3 smoke detectors. add 7 ceiling speakers, relocate 4 existing strobes and 12 existing smoke dectors. ref. appl. 2014.0603.7389. | $7,526 |
| Aug 14, 2014 | Never finaled issued Sep 2014, no final | 100 01st St | Sabah International Incorporated | provide a modification of the existing fire alarm system to ground floor common area. add 2 wall mount strobes, 3 in duct smoke detectors for fsds, 3 control relays for fsds, 2 wall mount speaker strobes. mech pa# 201407242062. arch pa# 201312174414.Details
provide a modification of the existing fire alarm system to ground floor common area. add 2 wall mount strobes, 3 in duct smoke detectors for fsds, 3 control relays for fsds, 2 wall mount speaker strobes. mech pa# 201407242062. arch pa# 201312174414. | $6,868 |
| Jul 24, 2014 | Completed final sign-off Nov 2014 | 100 01st St | Commercial Interior Builders Inc | on 1st floor - install two new supply grilles, two new exhaust grilles, three new fire/smoke dampers and duct work. reference permit application #201312174414 for architectural permitDetails
on 1st floor - install two new supply grilles, two new exhaust grilles, three new fire/smoke dampers and duct work. reference permit application #201312174414 for architectural permit | $10,650 |
| Jul 9, 2014 | Completed final sign-off Jan 2015 | 100 01st St | Commercial Interior Builders Inc | revision to 201312174414; structural details/drawings for existing project.Details
revision to 201312174414; structural details/drawings for existing project. | |
| Jun 27, 2014 | Completed final sign-off Nov 2014 | 100 01st St | Commercial Interior Builders Inc | ground floor suite 279: title 24 el4ectricla lighting & power work for (e) panel. ref pa #2013.1217.4414 fro architectural permit.Details
ground floor suite 279: title 24 el4ectricla lighting & power work for (e) panel. ref pa #2013.1217.4414 fro architectural permit. | $30,000 |
| Jun 23, 2014 | Completed final sign-off Mar 2015 | 100 01st St | Novo Construction Inc | construction of full height partitions, doors, millwork on the 26th fl ls, sprinklers sep permitDetails
construction of full height partitions, doors, millwork on the 26th fl ls, sprinklers sep permit | $700,000 |
| Jun 4, 2014 | Completed final sign-off Feb 2015 | 100 01st St | Novo Construction Inc | 26/f: interior non structural demolition of partiton and ceilingDetails
26/f: interior non structural demolition of partiton and ceiling | $6,000 |
| May 27, 2014 | Completed final sign-off Jun 2014 | 100 01st St | Field Construction Inc. | electrical/lighting permit refer to t.i. #2013.1024.0112Details
electrical/lighting permit refer to t.i. #2013.1024.0112 | $500 |
| May 21, 2014 | Completed final sign-off Nov 2014 | 100 01st St | Commercial Interior Builders Inc | addition of 1 ea 1 ton heat pump.Details
addition of 1 ea 1 ton heat pump. | $15,000 |
| May 13, 2014 | Never finaled issued Jun 2014, no final | 100 01st St | Sabah International Incorporated | 1st floor - provide a modification of the (e) fire alarm system on 1st fl. remove (3) ceiling speaker/strobes, relocate (1) existing control relay, add new (1) duct detector, add new (1) monitor module for hood suppression system, add new (5) ceiling speaker/strpbes.Details
1st floor - provide a modification of the (e) fire alarm system on 1st fl. remove (3) ceiling speaker/strobes, relocate (1) existing control relay, add new (1) duct detector, add new (1) monitor module for hood suppression system, add new (5) ceiling speaker/strpbes. | $8,244 |
| May 13, 2014 | Completed final sign-off Aug 2014 | 100 01st St | Sabah International Incorporated | provide a modification of the existing fire alarm system on 10th floor. remove 10 existing strobes, remove 16 existing speakers, install 1 control relay fore elevator lobby door unlock, install 1 smoke detector, install 25 new speaker/strobes. maher n/a.Details
provide a modification of the existing fire alarm system on 10th floor. remove 10 existing strobes, remove 16 existing speakers, install 1 control relay fore elevator lobby door unlock, install 1 smoke detector, install 25 new speaker/strobes. maher n/a. | $12,034 |
| Apr 9, 2014 | Never finaled issued Apr 2014, no final | 100 01st St | Pioneer Fire Inc. | replace 8 pendent sprinklers with 8 upright sprinklers and add one pendent. gc to #201403059900Details
replace 8 pendent sprinklers with 8 upright sprinklers and add one pendent. gc to #201403059900 | $4,000 |
| Apr 2, 2014 | Completed final sign-off Apr 2014 | 100 01st St | Commercial Interior Builders Inc | new outside air fan and associated ductwork on the second floor.Details
new outside air fan and associated ductwork on the second floor. | $35,000 |
| Apr 1, 2014 | Never finaled issued Apr 2014, no final | 100 01st St | Sabah International Incorporated | on 2nd floor - provide a modification of the existing fire alarm system. the addition shall consist of providing the following: adding 2 new duct smoke detectors. adding 2 new control relays.Details
on 2nd floor - provide a modification of the existing fire alarm system. the addition shall consist of providing the following: adding 2 new duct smoke detectors. adding 2 new control relays. | $7,153 |
| Mar 10, 2014 | Completed final sign-off May 2014 | 100 01st St | Pioneer Fire Inc. | 1st floor: sprinkler ti consisting of 5 pendent sprinklers being replaced with 5 upright sprinklers and 3 relocated sprinklers. ti #201310240112.Details
1st floor: sprinkler ti consisting of 5 pendent sprinklers being replaced with 5 upright sprinklers and 3 relocated sprinklers. ti #201310240112. | $3,968 |
| Mar 5, 2014 | Completed final sign-off May 2014 | 100 01st St | Alsterlind Construction Inc. | tenant improvement from existing food retail to new food retail, including new service area, partition walls, casework, interior lighting, plumbing and electrical work.Details
tenant improvement from existing food retail to new food retail, including new service area, partition walls, casework, interior lighting, plumbing and electrical work. | $67,900 |
| Dec 24, 2013 | Never finaled issued Jan 2014, no final | 100 01st St | 1st floor. installation of giles fsh-6 ventless hood.Details
1st floor. installation of giles fsh-6 ventless hood. | $16,000 | |
| Dec 17, 2013 | Completed final sign-off Jan 2015 | 100 01st St | Commercial Interior Builders Inc | ground fl. (2) two new unisex restrooms & aesthetic. upgrades to the ground common area. mep. under seperate permit.Details
ground fl. (2) two new unisex restrooms & aesthetic. upgrades to the ground common area. mep. under seperate permit. | $300,000 |
| Nov 20, 2013 | Never finaled issued Nov 2013, no final | 100 01st St | Sabah International Incorporated | adding one new control relay for activation of fire hat light due to elevator modernization.Details
adding one new control relay for activation of fire hat light due to elevator modernization. | $4,788 |
| Oct 24, 2013 | Completed final sign-off Jun 2014 | 100 01st St | Field Construction Inc. | gb01 (1st floor)-upgrade (e) shell retail to new bakery. new electrical, plumbing, mechanical under seperate permit. sprinklers and fire alarm separate permit.Details
gb01 (1st floor)-upgrade (e) shell retail to new bakery. new electrical, plumbing, mechanical under seperate permit. sprinklers and fire alarm separate permit. | $15,000 |
| Aug 15, 2013 | Completed final sign-off Aug 2013 | 100 01st St | Commercial Interior Builders Inc | 26th floor-alteration of partitions in a vacant floor per ab-017Details
26th floor-alteration of partitions in a vacant floor per ab-017 | $25,250 |
| Jul 16, 2013 | Completed final sign-off Aug 2013 | 100 01st St | Sabah International Incorporated | 1st floor:provide modification of the extg fire alarm system for partial tenant build out on the 1st floor. the addition shall consist of providing the following: add one new booster power supply, one duct detector, 1 control relay and 8 speaker strobes. remove 5 old devices to be replacedDetails
1st floor:provide modification of the extg fire alarm system for partial tenant build out on the 1st floor. the addition shall consist of providing the following: add one new booster power supply, one duct detector, 1 control relay and 8 speaker strobes. remove 5 old devices to be replaced | $8,000 |
| Jul 12, 2013 | Completed final sign-off Nov 2013 | 100 01st St | Principal Builders Inc. | 3rd floor-suite #350-ti includes demo of non structural partitions & building new non structural partitions. all new or revised hvac, electrical, plumbing & life safety are design build & submitted for permit separtely. building fully sprinklered building is "fully sprinklered".Details
3rd floor-suite #350-ti includes demo of non structural partitions & building new non structural partitions. all new or revised hvac, electrical, plumbing & life safety are design build & submitted for permit separtely. building fully sprinklered building is "fully sprinklered". | $90,000 |
| Apr 23, 2013 | Completed final sign-off Jun 2013 | 100 01st St | 2nd floor-modification of (e) fire alarm system for partial tenant build out on 2nd fl. add 10 new detectors, 3 new strobes, 10 new speaker/strobes, remove 4 (e) speakers & 11 (e) strobes.Details
2nd floor-modification of (e) fire alarm system for partial tenant build out on 2nd fl. add 10 new detectors, 3 new strobes, 10 new speaker/strobes, remove 4 (e) speakers & 11 (e) strobes. | $8,000 | |
| Nov 19, 2012 | Never finaled issued Nov 2012, no final | 100 01st St | Sabah International Incorporated | modify (e) f.a. system for partial 1/f & 2/f, addition consists 2 new duct detectors, 2 new control relays, 7 new strobes, 2 of those strobes are weather proof, 2 new ct2's, 2 new control relays and 5 new speakers. relocate 3 (e) strobes, t.i.pa# 201201202607Details
modify (e) f.a. system for partial 1/f & 2/f, addition consists 2 new duct detectors, 2 new control relays, 7 new strobes, 2 of those strobes are weather proof, 2 new ct2's, 2 new control relays and 5 new speakers. relocate 3 (e) strobes, t.i.pa# 201201202607 | |
| Nov 19, 2012 | Completed final sign-off Apr 2013 | 100 01st St | Sabah International Incorporated | 13th floor-modify (e) f.a. system-addition includes 4 new duct detectors, 4 new control relays, 5 new strobes, 19 new speaker/strobes. relocate 2 9e) smoke detectors, 2 (e) pull stations & 2 (e) strobes. ti pa#201208238099Details
13th floor-modify (e) f.a. system-addition includes 4 new duct detectors, 4 new control relays, 5 new strobes, 19 new speaker/strobes. relocate 2 9e) smoke detectors, 2 (e) pull stations & 2 (e) strobes. ti pa#201208238099 | $12,900 |
| Aug 15, 2012 | Completed final sign-off Jan 2013 | 100 01st St | Sabah International Incorporated | ground floor-provide a modification of (e) f.a system for partial tenant build out-addition shall consist of providing the following: add 1 new strobe, 2 ceiling speakers, relocate 2 (e) strobes, & 1 (e) speakerDetails
ground floor-provide a modification of (e) f.a system for partial tenant build out-addition shall consist of providing the following: add 1 new strobe, 2 ceiling speakers, relocate 2 (e) strobes, & 1 (e) speaker | $8,477 |
| Jun 12, 2012 | Never finaled issued Jun 2012, no final | 100 01st St | Sabah International Incorporated | 1st & 2nd floor provide a modification of the exisitng fire alarm system for partial tenant build out on partial 1st & 2nds floor. add 2 duct det, 2 control relays, 5 new strobes, 2 ct2, & 1 speaker, relocate existing strobe.Details
1st & 2nd floor provide a modification of the exisitng fire alarm system for partial tenant build out on partial 1st & 2nds floor. add 2 duct det, 2 control relays, 5 new strobes, 2 ct2, & 1 speaker, relocate existing strobe. | $10,426 |
| Jan 20, 2012 | Expired or cancelled expired Sep 2013 | 100 01st St | Skyline Construction | 2nd floor-demolition of non structural partitions, new non structural partitions. m.e.p, fire sprinklers & life safety under seperate permitDetails
2nd floor-demolition of non structural partitions, new non structural partitions. m.e.p, fire sprinklers & life safety under seperate permit | $45,000 |
| Dec 13, 2011 | Completed final sign-off Jan 2012 | 100 01st St | Commercial Interior Builders Inc | electric work related to 201110267619. work to include lighting, power for spec suites. includes elec title 24 calcsDetails
electric work related to 201110267619. work to include lighting, power for spec suites. includes elec title 24 calcs | $20,897 |
| Nov 23, 2011 | Completed final sign-off Feb 2012 | 100 01st St | Sabah International Incorporated | 22nd floor-tenant improvement/relocate & add notification onlyDetails
22nd floor-tenant improvement/relocate & add notification only | $5,460 |
| Oct 26, 2011 | Completed final sign-off Jan 2012 | 100 01st St | Commercial Interior Builders Inc | demolition of non structural partitions and building new non structural partitions. all new or revised hvac, electrical and life safety work will be design build and submitted separatelyDetails
demolition of non structural partitions and building new non structural partitions. all new or revised hvac, electrical and life safety work will be design build and submitted separately | $39,456 |
| Oct 26, 2011 | Completed final sign-off Feb 2012 | 100 01st St | Commercial Interior Builders Inc | demolition of non structural acoustic ceilig and installation of new non structural acoustic ceiling. all new mechanical and electrical will be design build & submitted separately.Details
demolition of non structural acoustic ceilig and installation of new non structural acoustic ceiling. all new mechanical and electrical will be design build & submitted separately. | $39,331 |
| Aug 19, 2011 | Completed final sign-off Sep 2011 | 100 01st St | Sabah International Incorporated | 3rd floor modify the fire alarm system for tenant build out. the upgrade system shall include the following: add (2) ceiling strobes, (2) ceiling speaker/strobes.Details
3rd floor modify the fire alarm system for tenant build out. the upgrade system shall include the following: add (2) ceiling strobes, (2) ceiling speaker/strobes. | $8,662 |
| Apr 11, 2011 | Completed final sign-off Jan 2012 | 100 01st St | Sabah International Incorporated | modify fa system for t. i.build out on flrs 18, 19, 20, 21, 22, 23 & 24. adding 22 smoke detectors, 27 duct det. w/ 27 controlrelays, 143 speaker strobes, 32 strobes and 2 input modules.Details
modify fa system for t. i.build out on flrs 18, 19, 20, 21, 22, 23 & 24. adding 22 smoke detectors, 27 duct det. w/ 27 controlrelays, 143 speaker strobes, 32 strobes and 2 input modules. | $81,000 |
| Apr 11, 2011 | Completed final sign-off Jul 2011 | 100 01st St | Sabah International Incorporated | unit #2350-modify fire alarm system for tenant build out, adding 4 speaker strobes & 2 strobesDetails
unit #2350-modify fire alarm system for tenant build out, adding 4 speaker strobes & 2 strobes | $6,250 |
| Dec 1, 2010 | Completed final sign-off Jan 2011 | 100 01st St | Field Construction Inc. | 11th floor-construct one (n) private office in (e) office space. reconfigure (e) lighting & power outlets. mechanical/life safety to be design build under seperate permit.Details
11th floor-construct one (n) private office in (e) office space. reconfigure (e) lighting & power outlets. mechanical/life safety to be design build under seperate permit. | $12,000 |
| Apr 3, 2009 | Completed final sign-off Apr 2009 | 100 01st St | Dome Construction Corp | to complete work and obtain final inspection for work approved under pa # 200602033718. ref app # 200601061633Details
to complete work and obtain final inspection for work approved under pa # 200602033718. ref app # 200601061633 | $2,500 |
| Dec 22, 2008 | Expired or cancelled expired Dec 2008 | 100 01st St | Skyline Construction | demolition of existing suspended accoustic ceiling, installation of new gypsum board ceiling.Details
demolition of existing suspended accoustic ceiling, installation of new gypsum board ceiling. | $9,100 |
| Nov 20, 2008 | Completed final sign-off Dec 2008 | 100 01st St | Skyline Construction | 17th floor: to complete work and obtain final inspection for work approved under pa #200802285813Details
17th floor: to complete work and obtain final inspection for work approved under pa #200802285813 | |
| Jun 16, 2008 | Never finaled issued Dec 2008, no final | 100 01st St | Skyline Construction | 17th floor: demolition of (e) suspended accoustic ceiling, installation of new gypsum board ceiling.Details
17th floor: demolition of (e) suspended accoustic ceiling, installation of new gypsum board ceiling. | $9,100 |
| Mar 25, 2008 | Completed final sign-off Dec 2008 | 100 01st St | Skyline Construction | hvac work on the 17th floor. ref. pa# 2007/12/31/1643 fire alarm seperate permit.Details
hvac work on the 17th floor. ref. pa# 2007/12/31/1643 fire alarm seperate permit. | $75,000 |
| Mar 24, 2008 | Completed final sign-off Sep 2008 | 100 01st St | Sabah International Incorporated | ti for fire alarm on the 14th floor. adding or replacing 23 strobes,7 speakers, 2 smoke detectors and 16 duct detectors for new fan units located on this floor. floor is fully sprinklered.Details
ti for fire alarm on the 14th floor. adding or replacing 23 strobes,7 speakers, 2 smoke detectors and 16 duct detectors for new fan units located on this floor. floor is fully sprinklered. | $18,984 |
| Feb 28, 2008 | Expired or cancelled expired Dec 2008 | 100 01st St | Sabah International Incorporated | 17th floor-add 12 new strobes to complete coverage of new tenant space. final & test 12 strobesDetails
17th floor-add 12 new strobes to complete coverage of new tenant space. final & test 12 strobes | $14,437 |
| Jan 24, 2008 | Expired or cancelled expired Dec 2008 | 100 01st St | Ayoob & Peery Plumbing Co Inc | relocate fire sprinklers per 17th floor - relocate fire sprinklers per tenant improvement,, 143 total heads, 143 relocated, 10 plugged heads.Details
relocate fire sprinklers per 17th floor - relocate fire sprinklers per tenant improvement,, 143 total heads, 143 relocated, 10 plugged heads. | $21,000 |
| Jan 17, 2008 | Expired or cancelled expired Dec 2008 | 100 01st St | Sabah International Incorporated | final & test. add (1) new smk detector to idf room for coverage for 2 new fsd's. (1) new duct det. to cover new fsd. ( 17) new strobes to complete coverage of new tenant space, relocate (7) speakers & (2) existing strobes.Details
final & test. add (1) new smk detector to idf room for coverage for 2 new fsd's. (1) new duct det. to cover new fsd. ( 17) new strobes to complete coverage of new tenant space, relocate (7) speakers & (2) existing strobes. | $15,250 |
| Oct 1, 2007 | Never finaled issued Oct 2007, no final | 100 01st St | Sabah International Incorporated | install 3 strobes on the 4th and 10th floorDetails
install 3 strobes on the 4th and 10th floor | $5,663 |
| Oct 1, 2007 | Never finaled issued Oct 2007, no final | 100 01st St | Sabah International Incorporated | install 2 strobes on the 6th and 7th floorDetails
install 2 strobes on the 6th and 7th floor | $4,388 |
| May 23, 2007 | Completed final sign-off Oct 2007 | 100 01st St | Potter Fire Protection | relocate 4 fire sprinklers on 7th floor only.Details
relocate 4 fire sprinklers on 7th floor only. | $1,250 |
| Jan 5, 2007 | Completed final sign-off Jan 2007 | 100 01st St | renew pa# 2006/06/29/5325 & pa# 2006/06/20/4471 for final inspection only.Details
renew pa# 2006/06/29/5325 & pa# 2006/06/20/4471 for final inspection only. | ||
| Dec 28, 2006 | Completed final sign-off Mar 2007 | 100 01st St | Skyline Construction | oti-1 2nd fl, elDetails
oti-1 2nd fl, el | $70,000 |
| Jun 29, 2006 | Expired or cancelled expired Jan 2007 | 100 01st St | R.M.R. Construction Company | revision to appl#200606204471 delete mechanical & lighting, life safety on oti-1Details
revision to appl#200606204471 delete mechanical & lighting, life safety on oti-1 | |
| Jun 20, 2006 | Expired or cancelled expired Jan 2007 | 100 01st St | R.M.R. Construction Company | oti-1 8f el,me,ls,spDetails
oti-1 8f el,me,ls,sp | $9,956 |
| Feb 7, 2006 | Never finaled issued Feb 2006, no final | 100 01st St | Dome Construction Corp | oti-3 3rd floor, meDetails
oti-3 3rd floor, me | $6,000 |
| Feb 7, 2006 | Never finaled issued Feb 2006, no final | 100 01st St | Dome Construction Corp | oti-3 8th fl meDetails
oti-3 8th fl me | $4,000 |
| Feb 3, 2006 | Expired or cancelled expired Feb 2009 | 100 01st St | Dome Construction Corp | oti-2, 3rd floor, sprinkler only. ref oti-1, pa# 2006/01/06/1633.Details
oti-2, 3rd floor, sprinkler only. ref oti-1, pa# 2006/01/06/1633. | $2,500 |
| Jan 6, 2006 | Expired or cancelled expired Nov 2008 | 100 01st St | Dome Construction Corp | oti-1, 3rd floor, el, me, ls, sp.Details
oti-1, 3rd floor, el, me, ls, sp. | $33,279 |
| Oct 20, 2005 | Completed final sign-off Oct 2005 | 100 01st St | Sabah International Incorporated | oti-4, 26th floor, ls.Details
oti-4, 26th floor, ls. | $22,000 |
| Sep 27, 2005 | Completed final sign-off Oct 2005 | 100 01st St | Dome Construction Corp | oti-2 26th fl el meDetails
oti-2 26th fl el me | $47,000 |
| Jun 10, 2005 | Completed final sign-off Jul 2005 | 100 01st St | Dome Construction Corp | demolition only interior partitions.Details
demolition only interior partitions. | $20,000 |
| May 10, 2005 | Expired or cancelled expired Oct 2006 | 100 01st St | Dome Construction Corp | oti-1, 10th floor, el, me, ls, sp.Details
oti-1, 10th floor, el, me, ls, sp. | $20,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Sabah International Incorporated (39), Commercial Interior Builders Inc (16), Dome Construction Corp (8), Skyline Construction (6), Field Construction Inc. (4), Novo Construction Inc (3), Pioneer Fire Inc. (2), R.M.R. Construction Company (2), Alsterlind Construction Inc., Anderson, Rowe & Buckley, Inc., Ayoob & Peery Plumbing Co Inc, Potter Fire Protection, Principal Builders Inc.
- Architects
- Steven Lawler (2), Gary Nichols, Greg A. Sheppard, Joseph A. Remling, Rebecca Amato, Rebecca Amato, Teresa Emery, Thomas Thompson
- Engineers
- Alexander Joseph Pacheco, Levi Malabuyo
- Authorized agent-otherss
- Thomas Brady
- Designers
- Asd, Thomas Thompson
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.