Roland Lau
- License
- C9211
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- On San Francisco permits
- Oct 2025 to Oct 2026
4 permits since 2000 (architect on 4 permits): 1 completed, 3 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Evra Construction (2), Gci, Inc, Skyline Construction
- Engineers
- Antonio Jacksalem
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 2
- Other or unknown 2
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 20, 2026 | In progress issued Nov 2026 | 333 07th St | Evra Construction | revision to pa# 202510248066: revising dimensional location of adding hoisting beam; revised pit ladder dimension to face of pit wall; misc. door hardware changes to add door lever changes to existing doors to remain.Details
revision to pa# 202510248066: revising dimensional location of adding hoisting beam; revised pit ladder dimension to face of pit wall; misc. door hardware changes to add door lever changes to existing doors to remain. | $10,000 |
| Aug 27, 2026 | In progress issued Oct 2026 | 300 Clay St | Skyline Construction | level 9: interior ti includes limited soft demo, buildi out includng new millwork and mepDetails
level 9: interior ti includes limited soft demo, buildi out includng new millwork and mep | $125,000 |
| Mar 17, 2026 | Completed final sign-off Aug 2026 | 303 02nd St | Gci, Inc | 6/fl-revision 202512121724 to change (e) finishes and remove (e) card readers, revise concrete column mounted tv to be ceiling mounted. update dedicated cooling unit. revise door material and hardwareDetails
6/fl-revision 202512121724 to change (e) finishes and remove (e) card readers, revise concrete column mounted tv to be ceiling mounted. update dedicated cooling unit. revise door material and hardware | |
| Oct 24, 2025 | In progress issued May 2026 | 333 07th St | Evra Construction | renovation of all restrooms and shower rooms. renovation of existing kitchen. skylight replacement. mep equipment and related roof penetrations. add new elevator incl pit and machine room.Details
renovation of all restrooms and shower rooms. renovation of existing kitchen. skylight replacement. mep equipment and related roof penetrations. add new elevator incl pit and machine room. | $2,345,530 |