Block 3502, lot 013
170 Valencia St
- City’s use
- Commercial Misc
- Built
- 1931
- Stories
- 4
- Rooms
- 7 bathrooms
- Building
- 31,392 sq ft
- Lot
- 8,245 sq ft
- Zoning
- RM1CM
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
18 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 27, 2024 | In progress issued Feb 2024 | 170 Valencia St | Thomas Swan Sign Co Inc | revision to pa# 202312041890. to show updated attachement method behind wall.Details
revision to pa# 202312041890. to show updated attachement method behind wall. | |
| Dec 28, 2023 | Completed final sign-off Mar 2024 | 170 Valencia St | Skyline Construction | change of use from church/office to general entertainment/office. no scope change propsed. occupancy type will remain the same. ref pa# 202210265195 & 202301190393Details
change of use from church/office to general entertainment/office. no scope change propsed. occupancy type will remain the same. ref pa# 202210265195 & 202301190393 | |
| Dec 4, 2023 | In progress issued Feb 2024 | 170 Valencia St | Thomas Swan Sign Co Inc | install 1 non-illuminated single face door sign " chan national queer arts center"Details
install 1 non-illuminated single face door sign " chan national queer arts center" | $2,000 |
| Aug 23, 2023 | Completed final sign-off Aug 2023 | 170 Valencia St | Westates Mechanical Corporation Inc | change 21 pendents to be concealed. add 1 head. change bathroom pipe due to arch change. fire sprinkler.Details
change 21 pendents to be concealed. add 1 head. change bathroom pipe due to arch change. fire sprinkler. | |
| Jun 30, 2023 | Completed final sign-off Mar 2024 | 170 Valencia St | Skyline Construction | removal/replacement of exterior entry gate, replacement of exterior window security grills & light fixtures on valencia st, addition of a new exterior door on the elgin park elevation, the demo of an interior restroom & doorDetails
removal/replacement of exterior entry gate, replacement of exterior window security grills & light fixtures on valencia st, addition of a new exterior door on the elgin park elevation, the demo of an interior restroom & door | $105,000 |
| Jun 28, 2023 | Completed final sign-off Sep 2023 | 170 Valencia St | Skyline Capital Builders Llc | level 1 + lower level: evacuation signsDetails
level 1 + lower level: evacuation signs | $2,000 |
| Apr 6, 2023 | Completed final sign-off Oct 2023 | 170 Valencia St | Skyline Capital Builders Llc | modify plumbing as required for ti project. modify 1st fl restroom exhaust. all central hvac cooling/heating and outside air equipment in existing to remain. replaces misc grills at 1st fl with new of same dimensions. ref pa 2022-1026-5195Details
modify plumbing as required for ti project. modify 1st fl restroom exhaust. all central hvac cooling/heating and outside air equipment in existing to remain. replaces misc grills at 1st fl with new of same dimensions. ref pa 2022-1026-5195 | $18,000 |
| Mar 14, 2023 | Completed final sign-off Aug 2023 | 170 Valencia St | Sabah International Incorporated | install dedicated sprinkler & waterflow fire alarm system new f.a. control unit, n annunciator, n cellular communicator w/ antenna n pull station n monitor modules for fire sprinkler system, smoke detectorsDetails
install dedicated sprinkler & waterflow fire alarm system new f.a. control unit, n annunciator, n cellular communicator w/ antenna n pull station n monitor modules for fire sprinkler system, smoke detectors | $20,000 |
| Feb 22, 2023 | Completed final sign-off Oct 2023 | 170 Valencia St | Skyline Capital Builders Llc | revision to 202210265195, 202301190393 for req adjustment to restroomsgiven e file conditions and conflicts. structural scope: modifications to restroom subfloor assembly framing and coorination of misc detail. no changes to restroom area plumbing fixture countsDetails
revision to 202210265195, 202301190393 for req adjustment to restroomsgiven e file conditions and conflicts. structural scope: modifications to restroom subfloor assembly framing and coorination of misc detail. no changes to restroom area plumbing fixture counts | |
| Feb 10, 2023 | Completed final sign-off Oct 2023 | 170 Valencia St | Skyline Capital Builders Llc | deferred mep for the chan national queer arts center. reference pa # 202210265195 & 202301190393.Details
deferred mep for the chan national queer arts center. reference pa # 202210265195 & 202301190393. | |
| Feb 7, 2023 | Completed final sign-off Aug 2023 | 170 Valencia St | Westates Mechanical Corporation Inc | install (n) ec heads in great hall. demo (e) lobby sprinklers at 1/f. install (n) lobby, bathroom, gallery and pre function space sprinklers. total 48 heads. ref ti permit 202301190393Details
install (n) ec heads in great hall. demo (e) lobby sprinklers at 1/f. install (n) lobby, bathroom, gallery and pre function space sprinklers. total 48 heads. ref ti permit 202301190393 | $17,000 |
| Jan 19, 2023 | Completed final sign-off Oct 2023 | 170 Valencia St | Skyline Capital Builders Llc | revision to 202210265195: install non structural acoustic panel in great hall, new double ddors in pre-function space. new acoustic and gyp ceiling in grand hall. add new millwork folding doors at pantryDetails
revision to 202210265195: install non structural acoustic panel in great hall, new double ddors in pre-function space. new acoustic and gyp ceiling in grand hall. add new millwork folding doors at pantry | $20,000 |
| Oct 26, 2022 | Completed final sign-off Oct 2023 | 170 Valencia St | Skyline Construction | new accessible restrooms, new accesible path of travel ramps; new lift to access performance stage and new acceisble pantry @ prefunction room. deferred mepDetails
new accessible restrooms, new accesible path of travel ramps; new lift to access performance stage and new acceisble pantry @ prefunction room. deferred mep | $250,000 |
| Oct 25, 2022 | Completed final sign-off Oct 2023 | 170 Valencia St | Skyline Capital Builders Llc | demolition of interior non-structural walls, finishes, plubming fixtures, and stairs per ab-17.Details
demolition of interior non-structural walls, finishes, plubming fixtures, and stairs per ab-17. | $10,000 |
| Nov 29, 2021 | Completed final sign-off Mar 2022 | 170 Valencia St | Skyline Capital Builders Llc | replace one supply fan and 2 duct heaters with new duct work serving project area. includes associated electrical work. no structural work required.Details
replace one supply fan and 2 duct heaters with new duct work serving project area. includes associated electrical work. no structural work required. | $100,000 |
| Apr 23, 2019 | Never finaled issued Jun 2019, no final | 170 Valencia St | admin permit for record only. no work. no change in occupancy or use. show egress & occupancy, establish new occupant load.Details
admin permit for record only. no work. no change in occupancy or use. show egress & occupancy, establish new occupant load. | ||
| Aug 28, 2015 | Never finaled issued Oct 2015, no final | 170 Valencia St | replace clear flat window glass (9 panes) existing sashes to remain replace 3 rectangular panes on floor 1, 4 on floor 2, and 2 on floor 3. all at sides of front facade no changes to entryway glassDetails
replace clear flat window glass (9 panes) existing sashes to remain replace 3 rectangular panes on floor 1, 4 on floor 2, and 2 on floor 3. all at sides of front facade no changes to entryway glass | $4,300 | |
| Jul 28, 2006 | Never finaled issued Jul 2006, no final | 170 Valencia St | Acker & Guerrero Roof Co | reroofing.Details
reroofing. | $79,825 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Skyline Capital Builders Llc (7), Skyline Construction (3), Thomas Swan Sign Co Inc (2), Westates Mechanical Corporation Inc (2), Acker & Guerrero Roof Co, Sabah International Incorporated
- Architects
- Douglas Zucker (4), Donald Ruthroff, Douglas Zocker
- Engineers
- Jia Hui Pan, Jimmy Lau, Pablo Orozco
- Designers
- Michael Hallatt