Block 0084, lot 008
1265 Battery St
- City’s use
- Commercial Office
- Built
- 1982
- Stories
- 5
- Units
- 1
- Building
- 88,225 sq ft
- Lot
- 24,344 sq ft
- Zoning
- C2
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
101 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 31, 2026 | In progress issued Sep 2026 | 1265 Battery St | Suffolk Constr Co. Inc. Dba Suffolk-Roel | 2/f: deferred mep for bpa#202607064593Details
2/f: deferred mep for bpa#202607064593 | $1,146,000 |
| Aug 19, 2026 | In progress issued Aug 2026 | 1265 Battery St | Suffolk Constr Co. Inc. Dba Suffolk-Roel | 2/f: tenant improvement soft demo of non bearing partition and addition of new partitions, doors/frames, cabinetry, lighting and finishes. mep deferred.Details
2/f: tenant improvement soft demo of non bearing partition and addition of new partitions, doors/frames, cabinetry, lighting and finishes. mep deferred. | $2,300,000 |
| Aug 12, 2026 | In progress issued Aug 2026 | 1265 Battery St | Rod Heisler Construction | ste: 500 - tenant improvements to (e) unoccupied office space: no struc. work, infill (e) wall openings selective demoliton of (e) improvements, new casework, replacement of (e) sinks and new lighting.Details
ste: 500 - tenant improvements to (e) unoccupied office space: no struc. work, infill (e) wall openings selective demoliton of (e) improvements, new casework, replacement of (e) sinks and new lighting. | $450,000 |
| Feb 12, 2026 | Completed final sign-off Apr 2026 | 117 Greenwich St | Hp Build | ground fl- meps for pa # 2025-1021-7827Details
ground fl- meps for pa # 2025-1021-7827 | $300,000 |
| Jan 8, 2026 | Completed final sign-off Jan 2026 | 117 Greenwich St | Pioneer Fire Inc. | 1st fl ref pa #2025-1021-7827: relocate 20 pendents, 2 concealed pendents, add 4 pendent, remove 4 pendents, 4 sideway heads.Details
1st fl ref pa #2025-1021-7827: relocate 20 pendents, 2 concealed pendents, add 4 pendent, remove 4 pendents, 4 sideway heads. | $8,500 |
| Dec 11, 2025 | Completed final sign-off Apr 2026 | 117 Greenwich St | Hp Build | 1st and 2nd fl: revision to 20251017827. infill on 2nd floor. part of stair removal on 1st fl structural.Details
1st and 2nd fl: revision to 20251017827. infill on 2nd floor. part of stair removal on 1st fl structural. | $65,000 |
| Oct 21, 2025 | Completed final sign-off Apr 2026 | 117 Greenwich St | Hp Build | 1st/f t.i. demo non-structural partitions & build new non-structural partitions, all new or revised mep & life safety work will be design vuild & submitted separatelyDetails
1st/f t.i. demo non-structural partitions & build new non-structural partitions, all new or revised mep & life safety work will be design vuild & submitted separately | $750,000 |
| Mar 19, 2024 | Completed final sign-off Apr 2024 | 1265 Battery St | Honeywell International, Inc | ref 202210244969- as built to replace (e) fa panel to honeywell panel. (e) devices to remain on 1,2, 5th, & roof. notification devices on 3 and 44 floor will be removed and replaced. all (e) addressable devices to be replaced. install wireless communicatorDetails
ref 202210244969- as built to replace (e) fa panel to honeywell panel. (e) devices to remain on 1,2, 5th, & roof. notification devices on 3 and 44 floor will be removed and replaced. all (e) addressable devices to be replaced. install wireless communicator | |
| Mar 7, 2024 | In progress filed Mar 2024, not yet issued | 1265 Battery St | umbrella building permit bulletin 2.08, retroactive sprinkler installation for high rise building submittals & umbrella permit (2022). high rise srpinkler ord #377.93Details
umbrella building permit bulletin 2.08, retroactive sprinkler installation for high rise building submittals & umbrella permit (2022). high rise srpinkler ord #377.93 | ||
| Jan 22, 2024 | Completed final sign-off Feb 2024 | 1265 Battery St | Liberty Fire Systems Inc | as build for 202308104171. (e) fire sprinkler system. finish sprinklering the facility to allow a confirmation letter verifying the facility is fully sprinklered.Details
as build for 202308104171. (e) fire sprinkler system. finish sprinklering the facility to allow a confirmation letter verifying the facility is fully sprinklered. | |
| Aug 10, 2023 | Never finaled issued Aug 2023, no final | 1265 Battery St | Liberty Fire Systems Inc | t.i., (e) f/s system, add (5) sprinklerDetails
t.i., (e) f/s system, add (5) sprinkler | $3,500 |
| Dec 15, 2022 | Completed final sign-off Dec 2022 | 1265 Battery St | Aaa Restaurant Fire Control/Dba Aaa Fire | ground flr: furnish and install 2 ansul r-102 fire systems (6 tanks) in the main kitchen area ref pa# 2022-0728-9491.Details
ground flr: furnish and install 2 ansul r-102 fire systems (6 tanks) in the main kitchen area ref pa# 2022-0728-9491. | $25,000 |
| Oct 24, 2022 | Never finaled issued Oct 2022, no final | 1265 Battery St | Honeywell International, Inc | replacement of old simplex 4100 fa panel to honeywell xls3000 panel. (e) notification devices to remain on 1st 2nd 5th & roof. notification devices on 3rd & 4th to be r/r. all (e) addressable devices to be replaced w/ honeywell devices. install wireless communicator. includes t.i. on 1st fl restauraDetails
replacement of old simplex 4100 fa panel to honeywell xls3000 panel. (e) notification devices to remain on 1st 2nd 5th & roof. notification devices on 3rd & 4th to be r/r. all (e) addressable devices to be replaced w/ honeywell devices. install wireless communicator. includes t.i. on 1st fl restaura | $65,000 |
| Aug 10, 2022 | Never finaled issued Aug 2022, no final | 1265 Battery St | Westates Mechanical Corporation Inc | install 1 n pendent sprinkler, relocate and change out e head (5), change out replace e head (60). ref pa# 202207289491Details
install 1 n pendent sprinkler, relocate and change out e head (5), change out replace e head (60). ref pa# 202207289491 | $13,941 |
| Jul 28, 2022 | Completed final sign-off Mar 2023 | 1265 Battery St | Swinerton Builders | 1st floor: update fixtures and finishes throughout the front of house space. replace/repair kitchen equipment and finishes needed thorughout the back of house space.Details
1st floor: update fixtures and finishes throughout the front of house space. replace/repair kitchen equipment and finishes needed thorughout the back of house space. | $425,000 |
| Feb 13, 2020 | Never finaled issued Feb 2020, no final | 1265 Battery St | Johnson Controls Fire | 4th fl fire alarm as-built drawings. ref pa #201907186192. change 2 ceiling mount horns/strobes to wall mount, add 5 duct smoke sensors, show 3 smoke sensors as existing to remain.Details
4th fl fire alarm as-built drawings. ref pa #201907186192. change 2 ceiling mount horns/strobes to wall mount, add 5 duct smoke sensors, show 3 smoke sensors as existing to remain. | |
| Aug 7, 2019 | Completed final sign-off Feb 2020 | 1265 Battery St | Hp Build | 4th fl mech and elec for 201902143000. revision to arch for background correctionsDetails
4th fl mech and elec for 201902143000. revision to arch for background corrections | $400,000 |
| Jul 18, 2019 | Never finaled issued Jul 2019, no final | 1265 Battery St | Johnson Controls Fire | ref pa# 201902143000; installation of 1 nac power supply, 3 smoke detectors, 1 weather proof strobe and 30 horn strobes on 4th fl. in fire alarm systemDetails
ref pa# 201902143000; installation of 1 nac power supply, 3 smoke detectors, 1 weather proof strobe and 30 horn strobes on 4th fl. in fire alarm system | $24,608 |
| Jun 18, 2019 | Completed final sign-off Sep 2019 | 1265 Battery St | R L H Fire Protection Inc | fire sprinkler relocate 172 add 7 and delete 15 pendent sprinklers on the 4th fl ti 201902143000Details
fire sprinkler relocate 172 add 7 and delete 15 pendent sprinklers on the 4th fl ti 201902143000 | $40,000 |
| Feb 14, 2019 | Completed final sign-off Feb 2020 | 1265 Battery St | Hp Build | 4th flr. tenant improvement. demo (e) non-structural walls / ceiling and construct (n) non-structural walls, doors, frames, millwork, partial ceiling hardlid, soffits, floor finishes and mep incl 1 (n) shower room, 2 (n) mother's roomsDetails
4th flr. tenant improvement. demo (e) non-structural walls / ceiling and construct (n) non-structural walls, doors, frames, millwork, partial ceiling hardlid, soffits, floor finishes and mep incl 1 (n) shower room, 2 (n) mother's rooms | $1,760,000 |
| Dec 7, 2016 | Completed final sign-off Jan 2017 | 1265 Battery St | Skyline Construction | tenant improvement consisting of new electrical work only. maher not reqDetails
tenant improvement consisting of new electrical work only. maher not req | $10,000 |
| Oct 13, 2016 | Completed final sign-off Jan 2017 | 1265 Battery St | Sun Graphics | 5th floor: fabricate & install 4 emergency evac plan signsDetails
5th floor: fabricate & install 4 emergency evac plan signs | $375 |
| Sep 28, 2016 | Completed final sign-off Oct 2016 | 1265 Battery St | Johnson Controls Fire | 5th flr, fire alarm ti -6 strobes & 9 horns/strobes ref 201607253182Details
5th flr, fire alarm ti -6 strobes & 9 horns/strobes ref 201607253182 | $12,000 |
| Sep 2, 2016 | Never finaled issued Sep 2016, no final | 1265 Battery St | Golden Gate Fire Protection Inc | 5th flr: relocate 23 pendents add 2 pendent plug off 1 head for ref pa 201607253182 maher naDetails
5th flr: relocate 23 pendents add 2 pendent plug off 1 head for ref pa 201607253182 maher na | $13,125 |
| Aug 30, 2016 | Expired or cancelled cancelled Jan 2026 | 1265 Battery St | Skyline Construction | mechanical & plumbing work for ti on the 5th floor. ref pa 2016-0725-3182Details
mechanical & plumbing work for ti on the 5th floor. ref pa 2016-0725-3182 | $56,000 |
| Jul 25, 2016 | Completed final sign-off Jan 2017 | 1265 Battery St | Skyline Construction | 5th floor, suite 500: ti - full floor. scope includes but not limited to: (n) non structural partitions, doors, frame/hardware, lighting, electrical, plumbing, mechanical life safety to tie into (e) utilities, new millwork & finishes. maher naDetails
5th floor, suite 500: ti - full floor. scope includes but not limited to: (n) non structural partitions, doors, frame/hardware, lighting, electrical, plumbing, mechanical life safety to tie into (e) utilities, new millwork & finishes. maher na | $634,095 |
| Jul 13, 2016 | Completed final sign-off Jan 2017 | 1265 Battery St | Skyline Construction | demolition of non structural interior partitions, ceilings, lighting and millworkDetails
demolition of non structural interior partitions, ceilings, lighting and millwork | $5,000 |
| Jun 15, 2015 | Completed final sign-off Oct 2016 | 1265 Battery St | Johnson Controls Fire | fire alarm t.i. based on elevator modernization for passanger elevators. 2 smoke, 7 heats, 1 monitor module, 4 relays, 2 isolation relays.Details
fire alarm t.i. based on elevator modernization for passanger elevators. 2 smoke, 7 heats, 1 monitor module, 4 relays, 2 isolation relays. | $6,000 |
| Feb 10, 2015 | Completed final sign-off Apr 2015 | 1265 Battery St | Johnson Controls Fire | ground & roof: fire system alarm t.i. based on elevator modernization for service elevator. 3 new smoke detectors, 2 heat detectors, 1 monitor module, 4 relays and 2 isolation relays. n/a maher ord # 155-13Details
ground & roof: fire system alarm t.i. based on elevator modernization for service elevator. 3 new smoke detectors, 2 heat detectors, 1 monitor module, 4 relays and 2 isolation relays. n/a maher ord # 155-13 | $7,500 |
| Nov 12, 2014 | Never finaled issued Nov 2014, no final | 1265 Battery St | Transbay Fire Protection | relocate 54 existing fire sprinkler heads to accomodate revised ceiling and floor plan in several areas of existing 3rd floor only. turn 37 rcc pendents to pendents total of 91 heads. referece pa#2014-0909-5800Details
relocate 54 existing fire sprinkler heads to accomodate revised ceiling and floor plan in several areas of existing 3rd floor only. turn 37 rcc pendents to pendents total of 91 heads. referece pa#2014-0909-5800 | $10,000 |
| Oct 7, 2014 | Completed final sign-off Dec 2014 | 1265 Battery St | Johnson Controls Fire | 3rd floor: fire alarm t.i. 5 wall srobes, 8 cieling strobes, 7 wall horn/strobes 15 ceiling horn/strobes. ref app#201409095800. n/a for maherDetails
3rd floor: fire alarm t.i. 5 wall srobes, 8 cieling strobes, 7 wall horn/strobes 15 ceiling horn/strobes. ref app#201409095800. n/a for maher | $20,000 |
| Sep 29, 2014 | Completed final sign-off Nov 2014 | 1265 Battery St | Critchfield Mechanical Inc | 3rd flr: 21 new reheat & cooling only vav zones, 1 fan powered box zone, 1 sink and 1 dishwasher (t.i. 201409095800); maher n/aDetails
3rd flr: 21 new reheat & cooling only vav zones, 1 fan powered box zone, 1 sink and 1 dishwasher (t.i. 201409095800); maher n/a | $300,000 |
| Sep 9, 2014 | Completed final sign-off Nov 2014 | 1265 Battery St | Mc Carthy Building Companies Inc | 3rd flr: demo minor (e) non-structural int. partitions, doors/frames/hardware,millwork, ceiling, finishes,mechanical elec & plumbing. construction of structural partitions, doors/frames/hardware,millwork, drywall & acoustic ceiling grid/tile & finishe. fire sprinkers,mep under separate permit.Details
3rd flr: demo minor (e) non-structural int. partitions, doors/frames/hardware,millwork, ceiling, finishes,mechanical elec & plumbing. construction of structural partitions, doors/frames/hardware,millwork, drywall & acoustic ceiling grid/tile & finishe. fire sprinkers,mep under separate permit. | $1,048,905 |
| Nov 18, 2013 | Completed final sign-off Jan 2014 | 1265 Battery St | create and produce 3 evacuation plan signs on the 4th floorDetails
create and produce 3 evacuation plan signs on the 4th floor | $1,500 | |
| Jun 11, 2013 | Never finaled issued Jun 2013, no final | 1265 Battery St | Starlite Electric Inc. | 4th floor as-built to appl #2013.04.22.5097 - fire alarm devices: relocate (7) horn/strobes, from walls to ceiling. ref pa #2013.04.26.5572Details
4th floor as-built to appl #2013.04.22.5097 - fire alarm devices: relocate (7) horn/strobes, from walls to ceiling. ref pa #2013.04.26.5572 | $10,000 |
| May 20, 2013 | Completed final sign-off Jun 2013 | 1265 Battery St | Swinerton Builders | revision to pa 201304265572reduce millwork scope with stock cabinets, change partitions / door system.Details
revision to pa 201304265572reduce millwork scope with stock cabinets, change partitions / door system. | $100 |
| May 9, 2013 | Never finaled issued May 2013, no final | 1265 Battery St | Pribuss Engineering Inc | 4th floor fire sprinkler t.i. - add 135 fire sprinklers. ref pa #2013.04.26.5572Details
4th floor fire sprinkler t.i. - add 135 fire sprinklers. ref pa #2013.04.26.5572 | $69,474 |
| Apr 26, 2013 | Completed final sign-off Jun 2013 | 1265 Battery St | Swinerton Builders | construction of new non-structural partitions, doors & frames, millwork, plumbing, ceiling grid & tile, soffits, lighting, power & floor finishes. (fs permit will be separate permit.)Details
construction of new non-structural partitions, doors & frames, millwork, plumbing, ceiling grid & tile, soffits, lighting, power & floor finishes. (fs permit will be separate permit.) | $800,000 |
| Apr 22, 2013 | Never finaled issued Apr 2013, no final | 1265 Battery St | Starlite Electric Inc. | 4th flr fire alarm t.i.:installing new fire alaarm devices: addition of 24 horn strobes, 3 strobes, 2 smoke and 1 control module, relocate 1 manual pull station. ref arch. app# 2013 0327 3101Details
4th flr fire alarm t.i.:installing new fire alaarm devices: addition of 24 horn strobes, 3 strobes, 2 smoke and 1 control module, relocate 1 manual pull station. ref arch. app# 2013 0327 3101 | $12,000 |
| Feb 8, 2013 | Never finaled issued Feb 2013, no final | 1265 Battery St | street space and mta parkingDetails
street space and mta parking | ||
| Jan 30, 2013 | Completed final sign-off May 2013 | 1265 Battery St | Swinerton Builders | selective demo of some partitions and rcp and connect to building in 1255 battery with 2 openingsDetails
selective demo of some partitions and rcp and connect to building in 1255 battery with 2 openings | $5,000 |
| Oct 11, 2012 | Never finaled issued Oct 2012, no final | 101 Greenwich St | Golden Gate Fire Protection Inc | 2nd & 4th fl. fire sprinkler system upgrade, relocate 23 pendent heads each floor. t.i.pa#201209250618Details
2nd & 4th fl. fire sprinkler system upgrade, relocate 23 pendent heads each floor. t.i.pa#201209250618 | $11,845 |
| Sep 17, 2012 | Completed final sign-off Oct 2012 | 101 Greenwich St | Golden Gate Fire Protection Inc | 2nd floor-fire sprinkler system upgrade, relocate 44 pendent sprinkler heads, delete 17 sprinkler heads & add 7 pendent sprinkler headsDetails
2nd floor-fire sprinkler system upgrade, relocate 44 pendent sprinkler heads, delete 17 sprinkler heads & add 7 pendent sprinkler heads | $26,265 |
| Jun 20, 2012 | Completed final sign-off Oct 2012 | 101 Greenwich St | Skyline Construction | 2nd floor tenant improvement to include non-structural demolition, new partitions to create conference rooms, lunch room open office. mep under separate permit.Details
2nd floor tenant improvement to include non-structural demolition, new partitions to create conference rooms, lunch room open office. mep under separate permit. | $400,000 |
| Mar 3, 2008 | Completed final sign-off Apr 2008 | 1265 Battery St | Skyline Construction | electrical/lighting work on the 5th floor. ref. arch plans# 2008.02.11.4451Details
electrical/lighting work on the 5th floor. ref. arch plans# 2008.02.11.4451 | $15,000 |
| Feb 13, 2008 | Completed final sign-off Apr 2008 | 1265 Battery St | Starlite Electric Inc. | 5th floor - t.i. to upgrade fire alarm on 5th floor. to install 1 horn strobe. complaint #200683354.Details
5th floor - t.i. to upgrade fire alarm on 5th floor. to install 1 horn strobe. complaint #200683354. | $1,000 |
| Feb 11, 2008 | Completed final sign-off Apr 2008 | 1265 Battery St | revision to appl. 200712110153, add power & data outlets at the new partition and revise door in conference room.Details
revision to appl. 200712110153, add power & data outlets at the new partition and revise door in conference room. | $2,000 | |
| Dec 11, 2007 | Completed final sign-off Apr 2008 | 1265 Battery St | 5th floor: tenant improvement, minor demo & construction, mech, elec, life safety on separate permit.Details
5th floor: tenant improvement, minor demo & construction, mech, elec, life safety on separate permit. | $50,211 | |
| Oct 11, 2007 | Expired or cancelled cancelled Jan 2026 | 1265 Battery St | install one new illuminated wall signDetails
install one new illuminated wall sign | $2,000 | |
| Jul 6, 2007 | Completed final sign-off Oct 2007 | 1265 Battery St | revision to appl#200703166491 relocate proposed stairway due to interference with existing piping & ducts. work @ g/f & 2/f only. correct story count from 6 to 5 on existing permitDetails
revision to appl#200703166491 relocate proposed stairway due to interference with existing piping & ducts. work @ g/f & 2/f only. correct story count from 6 to 5 on existing permit | ||
| Jul 5, 2007 | Completed final sign-off Mar 2008 | 1265 Battery St | Skyline Construction | 2nd floor-electrical workDetails
2nd floor-electrical work | $21,000 |
| Jul 3, 2007 | Completed final sign-off Oct 2007 | 1265 Battery St | Skyline Construction | 42 fire sprinkler head rel. on 2nr flr.Details
42 fire sprinkler head rel. on 2nr flr. | $27,000 |
| Jun 19, 2007 | Completed final sign-off Oct 2007 | 1265 Battery St | Starlite Electric Inc. | install 16 wall mount horn/strobe and strobe. install 5 addressable smoke detectors, install one addressable pull station.Details
install 16 wall mount horn/strobe and strobe. install 5 addressable smoke detectors, install one addressable pull station. | $10,000 |
| Jun 14, 2007 | Completed final sign-off Oct 2007 | 117 Greenwich St | Skyline Construction | oti-2, 2nd floor, meDetails
oti-2, 2nd floor, me | $30,000 |
| May 31, 2007 | Completed final sign-off Aug 2007 | 1265 Battery St | Potter Fire Protection | 2nd floor-relocate 36 and plug 19 fire sprinklers on the 2nd floor only.Details
2nd floor-relocate 36 and plug 19 fire sprinklers on the 2nd floor only. | $8,820 |
| May 25, 2007 | Completed final sign-off Aug 2007 | 1265 Battery St | Starlite Electric Inc. | install 1 booster panel, 1 signal module, 9 horn/strobe, 2 wall mount strobes, 3 smoke detectors, 1 pull station.Details
install 1 booster panel, 1 signal module, 9 horn/strobe, 2 wall mount strobes, 3 smoke detectors, 1 pull station. | $15,000 |
| May 2, 2007 | Expired or cancelled expired Feb 2009 | 1265 Battery St | San Francisco Commercial Builders Inc | select demo of existing partitions. tenant improvement is currently unoccupied. 2nd floor. no structural demoDetails
select demo of existing partitions. tenant improvement is currently unoccupied. 2nd floor. no structural demo | $40,000 |
| Apr 18, 2007 | Completed final sign-off Aug 2007 | 1265 Battery St | San Francisco Commercial Builders Inc | oti-1, salt branding, 2nd floor, el, me, ls, sp. complaint #200794300 & #200683354.Details
oti-1, salt branding, 2nd floor, el, me, ls, sp. complaint #200794300 & #200683354. | $420,000 |
| Mar 26, 2007 | Completed final sign-off Oct 2007 | 1265 Battery St | oti-1, 2nd floor, el, ls, spDetails
oti-1, 2nd floor, el, ls, sp | $250,000 | |
| Mar 20, 2007 | Completed final sign-off Jun 2007 | 1265 Battery St | interior soft demo (e) walls and non structural sub floor (plywood) future structural work on separate permit#200703146205.Details
interior soft demo (e) walls and non structural sub floor (plywood) future structural work on separate permit#200703146205. | $2,000 | |
| Mar 16, 2007 | Completed final sign-off Oct 2007 | 1265 Battery St | 2nd floor - demo portion of existing floor opening, new mill work. new stair, railing enclosure between fround and 2nd floors. sturctural reinforcement of floor opening.complaint #200683354 @11/27/2006 & #200794300 @ 2/28/2007.Details
2nd floor - demo portion of existing floor opening, new mill work. new stair, railing enclosure between fround and 2nd floors. sturctural reinforcement of floor opening.complaint #200683354 @11/27/2006 & #200794300 @ 2/28/2007. | $80,000 | |
| Mar 14, 2007 | Completed final sign-off Aug 2007 | 1265 Battery St | strengthen 2nd floor extg wood ledgers where they span across wndw openings and ledger to wall connections along grid line one and 8 in order for the floor to support the required 50 psf floor live load and the associated 20 psf partition loadDetails
strengthen 2nd floor extg wood ledgers where they span across wndw openings and ledger to wall connections along grid line one and 8 in order for the floor to support the required 50 psf floor live load and the associated 20 psf partition load | $45,000 | |
| Feb 27, 2007 | Completed final sign-off May 2007 | 1265 Battery St | oti-1, levi strauss, 2nd floor, ls, sp, el.Details
oti-1, levi strauss, 2nd floor, ls, sp, el. | $30,000 | |
| Feb 22, 2007 | Completed final sign-off Apr 2007 | 1265 Battery St | Richlen Construction | oti-2 revision 4th floor el, meDetails
oti-2 revision 4th floor el, me | $100,000 |
| Feb 8, 2007 | Completed final sign-off Apr 2007 | 1265 Battery St | Richlen Construction | f s revision to pa#200610114655. expansion of 4th fl scope.Details
f s revision to pa#200610114655. expansion of 4th fl scope. | $5,000 |
| Jan 30, 2007 | Completed final sign-off May 2007 | 1265 Battery St | Starlite Electric Inc. | install 5 horn/strobes and 1 smoke detector on 4th floorDetails
install 5 horn/strobes and 1 smoke detector on 4th floor | $5,000 |
| Nov 21, 2006 | Completed final sign-off Nov 2006 | 1265 Battery St | Starlite Electric Inc. | delete 3 addressable duct detectors, maintain 7 existing hardwire duct detectors, relocate 2 horn/strobe. orig permit 200609121992.Details
delete 3 addressable duct detectors, maintain 7 existing hardwire duct detectors, relocate 2 horn/strobe. orig permit 200609121992. | |
| Oct 20, 2006 | Completed final sign-off Oct 2007 | 1265 Battery St | Richlen Construction | oti-1 rev, 4th floor, el, me, ls, sp. revision to 200608189841.Details
oti-1 rev, 4th floor, el, me, ls, sp. revision to 200608189841. | $30,000 |
| Oct 11, 2006 | Completed final sign-off Nov 2006 | 1265 Battery St | Skyline Construction | oti-2 5th floor el, me.Details
oti-2 5th floor el, me. | $94,000 |
| Oct 11, 2006 | Completed final sign-off Apr 2007 | 1265 Battery St | Ayoob & Peery Plumbing Co Inc | relocate fire sprinklers for tenant improvement (41)Details
relocate fire sprinklers for tenant improvement (41) | $6,300 |
| Oct 11, 2006 | Completed final sign-off Jun 2007 | 1265 Battery St | Richlen Construction | oti-2 4th floor el, meDetails
oti-2 4th floor el, me | $50,000 |
| Sep 28, 2006 | Completed final sign-off Nov 2006 | 1265 Battery St | R L H Fire Protection Inc | upgrade t/i fire sprinkler system; for suzman and cole 5th floor. 23 head total 22 relocate. 1 add 2 deletedDetails
upgrade t/i fire sprinkler system; for suzman and cole 5th floor. 23 head total 22 relocate. 1 add 2 deleted | $1,450 |
| Sep 26, 2006 | Completed final sign-off Apr 2007 | 1265 Battery St | Starlite Electric Inc. | install booster panel, horn / strobes, smoke detectors, signal module, strobes, pull station, duct detector. program new device to (e) panel.Details
install booster panel, horn / strobes, smoke detectors, signal module, strobes, pull station, duct detector. program new device to (e) panel. | $10,000 |
| Sep 12, 2006 | Completed final sign-off Nov 2006 | 1265 Battery St | Starlite Electric Inc. | install 1 booster panel, 8 smoke detectors, 3 duct detectors, 2 pull stations, 16 horn/strobes. 5th floorDetails
install 1 booster panel, 8 smoke detectors, 3 duct detectors, 2 pull stations, 16 horn/strobes. 5th floor | $15,000 |
| Aug 18, 2006 | Completed final sign-off Apr 2007 | 1265 Battery St | Richlen Construction | oti-1, 4th floor, el, ls, spDetails
oti-1, 4th floor, el, ls, sp | $480,233 |
| Jul 21, 2006 | Completed final sign-off Nov 2006 | 1265 Battery St | Skyline Construction | oti-1, 5th floor, el, me, ls, sp.Details
oti-1, 5th floor, el, me, ls, sp. | $250,000 |
| Jan 19, 2006 | Expired or cancelled expired Feb 2009 | 1265 Battery St | Anderson, Rowe & Buckley, Inc. | 0ti-3 3 fl spDetails
0ti-3 3 fl sp | $7,000 |
| Jan 17, 2006 | Completed final sign-off Nov 2006 | 1265 Battery St | Starlite Electric Inc. | install 4 strobes, 25 horn/strobes, 1 booster, 10 smoke detectors, 1 control modules, 4 relays & 2 duct detector.Details
install 4 strobes, 25 horn/strobes, 1 booster, 10 smoke detectors, 1 control modules, 4 relays & 2 duct detector. | $20,000 |
| Jan 5, 2006 | Completed final sign-off Nov 2006 | 1265 Battery St | Richlen Construction | oti-2 3/f el & me.Details
oti-2 3/f el & me. | $107,000 |
| Nov 1, 2005 | Completed final sign-off Nov 2006 | 1265 Battery St | Richlen Construction | oti-1 3rd floor el ls me spDetails
oti-1 3rd floor el ls me sp | $50,000 |
| Dec 14, 2004 | Expired or cancelled expired Nov 2006 | 1265 Battery St | 1 hour partition to cover roll-up door, demo stairs to area of work.Details
1 hour partition to cover roll-up door, demo stairs to area of work. | $9,000 | |
| Sep 15, 2004 | Expired or cancelled expired Nov 2006 | 1265 Battery St | Aaa Restaurant Fire Control/Dba Aaa Fire | installation of 1 automatic hood & duct fire suppression system "as built"for appl#200311210796Details
installation of 1 automatic hood & duct fire suppression system "as built"for appl#200311210796 | |
| Nov 21, 2003 | Never finaled issued Nov 2003, no final | 1265 Battery St | Aaa Restaurant Fire Control/Dba Aaa Fire | #a14- install andul fire system for hood & ductDetails
#a14- install andul fire system for hood & duct | $6,500 |
| Oct 16, 2003 | Completed final sign-off Feb 2004 | 1265 Battery St | Zebra Awning Co Inc | erect a single faced , non-electric wall signDetails
erect a single faced , non-electric wall sign | |
| Apr 28, 2003 | Completed final sign-off Aug 2003 | 1265 Battery St | oti-1 1st fl-no additional otiDetails
oti-1 1st fl-no additional oti | $10,000 | |
| Mar 18, 2003 | Completed final sign-off Aug 2003 | 117 Greenwich St | Skyline Construction | oti-3 1st elDetails
oti-3 1st el | $50,000 |
| Mar 13, 2003 | Completed final sign-off Aug 2003 | 117 Greenwich St | C B F Inc | life safety modifications 1st fl/gr flr 1 power supply, 3 smoke detectors, 9 horn strobes,5 strobe lDetails
life safety modifications 1st fl/gr flr 1 power supply, 3 smoke detectors, 9 horn strobes,5 strobe l | $5,000 |
| Mar 5, 2003 | Completed final sign-off Aug 2003 | 117 Greenwich St | Skyline Construction | oti-2 1st floor me spDetails
oti-2 1st floor me sp | $11,000 |
| Jan 23, 2003 | Completed final sign-off Aug 2003 | 117 Greenwich St | oti-1 1st floor el me ls spDetails
oti-1 1st floor el me ls sp | $275,000 | |
| Dec 3, 2002 | Completed final sign-off Dec 2002 | 1265 Battery St | Zebra Awning Co Inc | fabricate & install 1 canopyDetails
fabricate & install 1 canopy | $1,000 |
| Oct 23, 2002 | Expired or cancelled expired Oct 2006 | 1265 Battery St | Metropolitan Electrical Construction | install 1 strobe light in the men's and women's restroom on floors 2, 3 & 4 total of 6 strobesDetails
install 1 strobe light in the men's and women's restroom on floors 2, 3 & 4 total of 6 strobes | $5,000 |
| Feb 19, 2002 | Expired or cancelled expired Jun 2002 | 1265 Battery St | revise 200111163417 in order to file an unreasonable hardship requestDetails
revise 200111163417 in order to file an unreasonable hardship request | ||
| Dec 19, 2001 | Expired or cancelled expired Mar 2003 | 1265 Battery St | upgrade (e) toilet rooms on 2-4th floors, remove & replace sinks/waterclosets/toilet partitionsDetails
upgrade (e) toilet rooms on 2-4th floors, remove & replace sinks/waterclosets/toilet partitions | $95,000 | |
| Nov 16, 2001 | Expired or cancelled expired Mar 2002 | 1265 Battery St | remove table for clearance & change toilets for proper accessDetails
remove table for clearance & change toilets for proper access | $300 | |
| Jun 12, 2001 | Expired or cancelled expired Feb 2002 | 1265 Battery St | City Building Inc. | renew for final instpection only 9926572 5th flr tiDetails
renew for final instpection only 9926572 5th flr ti | |
| Jun 12, 2001 | Expired or cancelled expired Aug 2002 | 1265 Battery St | City Building Inc. | Details
| $60,000 |
| Mar 20, 2001 | Completed final sign-off May 2001 | 117 Greenwich St | Arrow Sign Company | erect a non-electric, single faced, wall signDetails
erect a non-electric, single faced, wall sign | |
| Mar 9, 2001 | Expired or cancelled expired Feb 2002 | 1265 Battery St | City Building Inc. | revision to app200008238652/add 4 duct to detectorsDetails
revision to app200008238652/add 4 duct to detectors | $15,000 |
| Sep 13, 2000 | Expired or cancelled expired Feb 2002 | 117 Greenwich St | mechanical distripution to the 1st floor & lightingDetails
mechanical distripution to the 1st floor & lighting | ||
| Aug 23, 2000 | Expired or cancelled expired Nov 2001 | 1265 Battery St | fire alarm plan life safety 5th floorDetails
fire alarm plan life safety 5th floor | $15,000 | |
| Feb 22, 2000 | Expired or cancelled expired Sep 2000 | 1265 Battery St | fire sprinkler piping plansDetails
fire sprinkler piping plans | $10,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.