Block 0833, lot 003
150 Oak St
- City’s use
- Commercial Office
- Built
- 1948
- Stories
- 6
- Lot
- 49,500 sq ft
- Zoning
- P
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
110 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 6, 2026 | In progress issued Aug 2026 | 150 Oak St | Related California Construction Llc | evacuation for signage for phase 2. no associated increase to student population.Details
evacuation for signage for phase 2. no associated increase to student population. | $55,600 |
| Jun 29, 2026 | In progress issued Jul 2026 | 150 Oak St | Related California Construction Llc | evacuation signage for phase 1b.no associated increase to student populationDetails
evacuation signage for phase 1b.no associated increase to student population | $40,573 |
| Apr 15, 2026 | Completed final sign-off Aug 2026 | 150 Oak St | Bobcomm Llc Dba Pacific Das Llc. | install a complete emergency communications enhancement system (erces) in accordance w/ 2025 california fire code 510 & nfpa 1225 - 2022 edition.Details
install a complete emergency communications enhancement system (erces) in accordance w/ 2025 california fire code 510 & nfpa 1225 - 2022 edition. | $16,250 |
| Mar 17, 2026 | Completed final sign-off Jul 2026 | 150 Oak St | Westates Mechanical Corporation Inc | remove fire sprinkler coverage from elevator 4 and 5 - machine room, top of shared elevator hoistway, and elevator pit of each elevatorDetails
remove fire sprinkler coverage from elevator 4 and 5 - machine room, top of shared elevator hoistway, and elevator pit of each elevator | |
| Mar 6, 2026 | Completed final sign-off Nov 2026 | 150 Oak St | Related California Construction Llc | mechanical energy compliance update to issued pa# 2025-09-09-4851. previously, the project pursued the prescriptive approach & has switched gears to performance approach for mechanical title-24 building energy compliance. no associated increase to student population.Details
mechanical energy compliance update to issued pa# 2025-09-09-4851. previously, the project pursued the prescriptive approach & has switched gears to performance approach for mechanical title-24 building energy compliance. no associated increase to student population. | |
| Mar 4, 2026 | Completed final sign-off Aug 2026 | 150 Oak St | Related California Construction Llc | install a complete emergency responder radio coverage system (errcs) in accordance with 2022 calfire code ss510 and nfpa 1225-2022 edition.Details
install a complete emergency responder radio coverage system (errcs) in accordance with 2022 calfire code ss510 and nfpa 1225-2022 edition. | $50,000 |
| Feb 25, 2026 | Completed final sign-off Nov 2026 | 150 Oak St | Related California Construction Llc | ab-004 priority phase 2.1: int ti-construct (n) staff-operated kitchen in basement lvl w/comm cooking eq, food prep area & servery line. students & faculty will have no access to kitchen. install (n) grease interceptor w/in (e) cafeteria & minor arch finish. modification/ext to (e)fa & fs as req.Details
ab-004 priority phase 2.1: int ti-construct (n) staff-operated kitchen in basement lvl w/comm cooking eq, food prep area & servery line. students & faculty will have no access to kitchen. install (n) grease interceptor w/in (e) cafeteria & minor arch finish. modification/ext to (e)fa & fs as req. | $750,000 |
| Feb 20, 2026 | Completed final sign-off Nov 2026 | 150 Oak St | Related California Construction Llc | ab-004 priority phase 2c: voluntary & selective renovation of (e) mep systems serving approx 125,400 gsf of the 177,800 gsf of entire (e) bldg. proposed mep design will supplement current arch & struc ti. non-seismic struc work ltd to addition of penthouse rooftop support & anchorage of mech equip.Details
ab-004 priority phase 2c: voluntary & selective renovation of (e) mep systems serving approx 125,400 gsf of the 177,800 gsf of entire (e) bldg. proposed mep design will supplement current arch & struc ti. non-seismic struc work ltd to addition of penthouse rooftop support & anchorage of mech equip. | $16,200,000 |
| Feb 11, 2026 | Completed final sign-off Sep 2026 | 150 Oak St | Westates Mechanical Corporation Inc | fire sprinkler ti refermce building permit#2025-0314-2389. add: 99, relocate 288, changeout 55, total: 439.Details
fire sprinkler ti refermce building permit#2025-0314-2389. add: 99, relocate 288, changeout 55, total: 439. | $263,000 |
| Feb 2, 2026 | Completed final sign-off Aug 2026 | 150 Oak St | Johnson Controls Fire | installation of a new facu in the basement & to upgrade (e) horn / strobe to voice evacuation. this includes addition of remote annunciator, voice evac control panel, update field devices per th enew architectural layout.Details
installation of a new facu in the basement & to upgrade (e) horn / strobe to voice evacuation. this includes addition of remote annunciator, voice evac control panel, update field devices per th enew architectural layout. | $380,000 |
| Dec 29, 2025 | Completed final sign-off Nov 2026 | 150 Oak St | Related California Construction Llc | ab-004 priority phase 2.2: non-structural int ti-establish staff-operated cafe serving hs students on 6th flr. limited to int arch finishes &typical mep modifications. cafe provide pre-pared, non-cooked food & bev only; no cooking equip, hooods or special ventilation of fp req. student/faculty willDetails
ab-004 priority phase 2.2: non-structural int ti-establish staff-operated cafe serving hs students on 6th flr. limited to int arch finishes &typical mep modifications. cafe provide pre-pared, non-cooked food & bev only; no cooking equip, hooods or special ventilation of fp req. student/faculty will | $180,000 |
| Dec 15, 2025 | Completed final sign-off Apr 2026 | 150 Oak St | Related California Construction Llc | rev to reconcile architectural floor plans re-issue pa#: 202503172389 (1b) and 202509094851 (1c). 6th floor interior non-structural architectural revision to incorporate(e) storage room apprx 300 sqft. into the adjacent assemply place along with minor interior partition plan adjustments. work isDetails
rev to reconcile architectural floor plans re-issue pa#: 202503172389 (1b) and 202509094851 (1c). 6th floor interior non-structural architectural revision to incorporate(e) storage room apprx 300 sqft. into the adjacent assemply place along with minor interior partition plan adjustments. work is | |
| Nov 26, 2025 | Completed final sign-off Nov 2026 | 150 Oak St | Related California Construction Llc | phase 2: new ext canopies,partial roof/skylights & column removal on 6/f,resurface payyard,new entry gates,ext stairs & ter serving new sep entry & reno of (e) main entry w/ new canopy.nonstruct-ti's basement kitchen.Details
phase 2: new ext canopies,partial roof/skylights & column removal on 6/f,resurface payyard,new entry gates,ext stairs & ter serving new sep entry & reno of (e) main entry w/ new canopy.nonstruct-ti's basement kitchen. | $15,000,000 |
| Nov 10, 2025 | Completed final sign-off Mar 2026 | 150 Oak St | Westates Mechanical Corporation Inc | basement -ref ti 202503172389- fire sprinkler add 13, relocate 64; demo 7 -total 84 sprinklersDetails
basement -ref ti 202503172389- fire sprinkler add 13, relocate 64; demo 7 -total 84 sprinklers | $20,000 |
| Oct 20, 2025 | Completed final sign-off Nov 2026 | 150 Oak St | Related California Construction Llc | 300 (e) window replacement - replace (e) steel sash, single-light, non-tempered w/ high performing aluminum windows deisgn w/ tempered, insulated glass & low-e energy efficient coating. same window divisions as (e) but greater energy efficieny & bldg code req.in size opening & safety glazing.Details
300 (e) window replacement - replace (e) steel sash, single-light, non-tempered w/ high performing aluminum windows deisgn w/ tempered, insulated glass & low-e energy efficient coating. same window divisions as (e) but greater energy efficieny & bldg code req.in size opening & safety glazing. | $3,600,000 |
| Sep 24, 2025 | Completed final sign-off Nov 2026 | 150 Oak St | Related California Construction Llc | ab-004 priority: phase 1c - t.i.: mep upgrades to pa 202503172389. no associated increase to student population.Details
ab-004 priority: phase 1c - t.i.: mep upgrades to pa 202503172389. no associated increase to student population. | $13,500,000 |
| Sep 8, 2025 | Completed final sign-off Feb 2026 | 150 Oak St | Johnson Controls Fire | 4th fl & basement: as built permit. to update location of the devices. no new devices were added.Details
4th fl & basement: as built permit. to update location of the devices. no new devices were added. | |
| Jul 16, 2025 | Completed final sign-off Dec 2025 | 150 Oak St | Westates Mechanical Corporation Inc | 4/f and basement - fire sprinklers: demo 3, add 15, relocate 32, and changeout 67 (total 114). upsize backflow from 4" to 6". ref permit 202503132189Details
4/f and basement - fire sprinklers: demo 3, add 15, relocate 32, and changeout 67 (total 114). upsize backflow from 4" to 6". ref permit 202503132189 | $110,000 |
| Jul 11, 2025 | Completed final sign-off Jan 2026 | 150 Oak St | Johnson Controls Fire | provide & install (4) smoke detectors, 4 horn strobes, & 2 strobes, relocate/demo (e) devices & new devices as shown on plans. demo (e) existing horn strobes on 4/f. demo 2 door holders/fsd/dd. ref to 202503132189Details
provide & install (4) smoke detectors, 4 horn strobes, & 2 strobes, relocate/demo (e) devices & new devices as shown on plans. demo (e) existing horn strobes on 4/f. demo 2 door holders/fsd/dd. ref to 202503132189 | $8,000 |
| Jul 9, 2025 | Expired or cancelled withdrawn Dec 2025 | 150 Oak St | Martinelli Environmental Graph | evacuation maps | $1,800 |
| Mar 17, 2025 | Completed final sign-off Nov 2026 | 150 Oak St | Cahill Contractors Llc., Related California Construction Llc | ab-004 priority:phase 1b: renovate restrooms on floors 1-5.replace (e) toilet partitions w/ proviacy partitions where allwed by (e) fixture layouts.additoinal gender neutral restroom added to basement & 6/f.expand (e) egress stairs #05 from 1-2/f to service basements thru 3/f.add stairs #8 fr 3-6/f.Details
ab-004 priority:phase 1b: renovate restrooms on floors 1-5.replace (e) toilet partitions w/ proviacy partitions where allwed by (e) fixture layouts.additoinal gender neutral restroom added to basement & 6/f.expand (e) egress stairs #05 from 1-2/f to service basements thru 3/f.add stairs #8 fr 3-6/f. | $1,200,000 |
| Mar 13, 2025 | Completed final sign-off May 2026 | 150 Oak St | Cahill Contractors Llc. | ab-004 priority: phase 1a:partial interior non-structural t.i. work on the 4/f & basement. provide make-up air using the (e) mehanical system by rerouting ductwork and air diffusers where applicable. no increase to student population.Details
ab-004 priority: phase 1a:partial interior non-structural t.i. work on the 4/f & basement. provide make-up air using the (e) mehanical system by rerouting ductwork and air diffusers where applicable. no increase to student population. | $350,000 |
| Jun 27, 2024 | Completed final sign-off Aug 2024 | 150 Oak St | interior only non structural hallway window to be added to (e) classroom/learning center- no change in area or useDetails
interior only non structural hallway window to be added to (e) classroom/learning center- no change in area or use | $5,000 | |
| Aug 31, 2021 | Completed final sign-off Jul 2024 | 151 Hickory St | to comply w/abe per ordinance 51-16, abe# 202208182782, path of travel (pot): install actuators for sfdbi da-04 and signage for access compliance (abe program). entrance @ 151 hickoryDetails
to comply w/abe per ordinance 51-16, abe# 202208182782, path of travel (pot): install actuators for sfdbi da-04 and signage for access compliance (abe program). entrance @ 151 hickory | $7,500 | |
| Aug 7, 2019 | Completed final sign-off Oct 2019 | 150 Oak St | Johnson Controls Fire | add (1) strobe on the 4th floor; add (2) smokes, (2) strobes and remove & relocate (1) strobe & (1) horn strobe on the 3rd floorDetails
add (1) strobe on the 4th floor; add (2) smokes, (2) strobes and remove & relocate (1) strobe & (1) horn strobe on the 3rd floor | $3,380 |
| Jul 9, 2019 | Completed final sign-off Aug 2019 | 150 Oak St | 3rd and 4th flrs. modifications of (e) fire sprinklers. demo 16 pendent heads on 3rd flr replace w/ 25 (n) pendents. plug 1 head on 4th flr.Details
3rd and 4th flrs. modifications of (e) fire sprinklers. demo 16 pendent heads on 3rd flr replace w/ 25 (n) pendents. plug 1 head on 4th flr. | $10,000 | |
| Jun 7, 2019 | Completed final sign-off Sep 2019 | 150 Oak St | Cahill Const Service Inc | non-structural ti work, no change in use, interior remodel w/new non-structural partition wall & finishes, work shall be limited to the 3rd & 4th fl only. no exterior work.Details
non-structural ti work, no change in use, interior remodel w/new non-structural partition wall & finishes, work shall be limited to the 3rd & 4th fl only. no exterior work. | $230,000 |
| Jun 6, 2019 | Expired or cancelled withdrawn Feb 2025 | 150 Oak St | grind or replace concrete squares to esnure no part of entry ramp exceeds 8.33% slope.Details
grind or replace concrete squares to esnure no part of entry ramp exceeds 8.33% slope. | ||
| Jun 19, 2018 | Completed final sign-off Oct 2018 | 150 Oak St | non-structural, interior t.i. consisting of addition of int. glazing and seat benches.Details
non-structural, interior t.i. consisting of addition of int. glazing and seat benches. | $20,000 | |
| Mar 7, 2018 | Completed final sign-off Apr 2018 | 150 Oak St | administrative revision to appln #201706149316 to clarify description (scope of work) to remove reference to permit appln #201706149319, no additional work.Details
administrative revision to appln #201706149316 to clarify description (scope of work) to remove reference to permit appln #201706149319, no additional work. | ||
| Jan 12, 2018 | Never finaled issued Jan 2018, no final | 150 Oak St | Johnson Controls Fire | update drawing per as built condition on field, fire alarm . ref pa 201711033068, 201708043898Details
update drawing per as built condition on field, fire alarm . ref pa 201711033068, 201708043898 | |
| Nov 3, 2017 | Completed final sign-off Mar 2018 | 150 Oak St | Johnson Controls Fire | as built drawings consist of adding a cellular dialer. pa 2017-0804-3898Details
as built drawings consist of adding a cellular dialer. pa 2017-0804-3898 | |
| Aug 10, 2017 | Completed final sign-off Aug 2017 | 150 Oak St | Rcm Fire Protection Inc. | 1/f: add 4 upright heads to (e) drops due to wood ceiling. ref t.i. pa#201707131851.Details
1/f: add 4 upright heads to (e) drops due to wood ceiling. ref t.i. pa#201707131851. | $1,800 |
| Aug 4, 2017 | Completed final sign-off Mar 2018 | 150 Oak St | Johnson Controls Fire | tenant improvement includes addition of (69) new smoke detectors, (1) relay module & (2) holders (fbo). ti ref 2017-0614-9316Details
tenant improvement includes addition of (69) new smoke detectors, (1) relay module & (2) holders (fbo). ti ref 2017-0614-9316 | $40,000 |
| Jul 13, 2017 | Completed final sign-off Apr 2018 | 150 Oak St | non-structural ti. no change of use/occ. addition of seat, benches & glazing in wallDetails
non-structural ti. no change of use/occ. addition of seat, benches & glazing in wall | $28,000 | |
| Jun 14, 2017 | Completed final sign-off Apr 2018 | 150 Oak St | perform egress revisions to allow forcompliance to cbc 452.1.4 exception for pre-app meeting letter dated 5/31/2016. (fire alarm separate permit) see pa# 2017-0614-9319.Details
perform egress revisions to allow forcompliance to cbc 452.1.4 exception for pre-app meeting letter dated 5/31/2016. (fire alarm separate permit) see pa# 2017-0614-9319. | $75,000 | |
| Jul 15, 2015 | Completed final sign-off Oct 2015 | 150 Oak St | addition of exit only doors & new office on 4th floor.Details
addition of exit only doors & new office on 4th floor. | $21,000 | |
| Jun 19, 2015 | Completed final sign-off Jan 2016 | 150 Oak St | Centimark Corporation | re-roofingDetails
re-roofing | $305,000 |
| Jul 25, 2014 | Completed final sign-off Aug 2014 | 150 Oak St | Johnson Controls Fire | 1st floor to add 2 door holders, 2 smoke detectors and relocate (e) 2 strobes to new locations. ref. t.i. appl. 201406138382.Details
1st floor to add 2 door holders, 2 smoke detectors and relocate (e) 2 strobes to new locations. ref. t.i. appl. 201406138382. | $6,000 |
| Jun 13, 2014 | Completed final sign-off Aug 2014 | 150 Oak St | interior t.i. work, no structural work, limited to 1, 2, 4, & 5 floors. fire alarm / sprinkler protection shall be deferred, see plans.Details
interior t.i. work, no structural work, limited to 1, 2, 4, & 5 floors. fire alarm / sprinkler protection shall be deferred, see plans. | $116,000 | |
| Jun 27, 2013 | Completed final sign-off Jul 2013 | 150 Oak St | 2nd & 5th floors-addition of new rated windows/frame to (e) interior corridor. 2 new windows on 2nd floor & 3 new windows on 5th floorDetails
2nd & 5th floors-addition of new rated windows/frame to (e) interior corridor. 2 new windows on 2nd floor & 3 new windows on 5th floor | $4,000 | |
| Jun 27, 2012 | Completed final sign-off Jul 2012 | 150 Oak St | room #276- limited tenant improvement - addition of interior wall/door. no increase in area or change in occupancy, no structural work. on the 2nd floor.Details
room #276- limited tenant improvement - addition of interior wall/door. no increase in area or change in occupancy, no structural work. on the 2nd floor. | $4,000 | |
| Apr 9, 2012 | Never finaled issued Apr 2012, no final | 150 Oak St | street space with 200sf sidewalk repair.Details
street space with 200sf sidewalk repair. | ||
| Aug 9, 2011 | Never finaled issued Aug 2011, no final | 150 Oak St | street space & sidewalk | ||
| Jul 12, 2011 | Completed final sign-off Aug 2011 | 150 Oak St | Simplex Grinnell | basement to 4th floor-fire alarm improvement to basement and 4th floor includes:3 new smoke detectors, 6 new horn/strobes, 3 new strobes,2 new duct detectors and 4 nw door holders.Details
basement to 4th floor-fire alarm improvement to basement and 4th floor includes:3 new smoke detectors, 6 new horn/strobes, 3 new strobes,2 new duct detectors and 4 nw door holders. | $9,000 |
| Jul 8, 2011 | Completed final sign-off Aug 2011 | 150 Oak St | Westates Mechanical Corporation Inc | add 1 pendent at the basement level.add 2 pendent and relocate 14 pendents at level 4.Details
add 1 pendent at the basement level.add 2 pendent and relocate 14 pendents at level 4. | $9,350 |
| Jun 8, 2011 | Completed final sign-off Sep 2011 | 150 Oak St | Cahill Contractors Inc | tenant improvement (interior only) & voluntary accessible upgrades/improvements for complianceDetails
tenant improvement (interior only) & voluntary accessible upgrades/improvements for compliance | $180,000 |
| Jul 26, 2010 | Completed final sign-off Aug 2010 | 150 Oak St | Anderson, Rowe & Buckley, Inc. | 4th floor tenant improvements to the fire sprinkler system, 1 relocated sprinklerDetails
4th floor tenant improvements to the fire sprinkler system, 1 relocated sprinkler | $250 |
| Jun 24, 2010 | Completed final sign-off Aug 2010 | 150 Oak St | revision to pa. #201005132363 to delete all work at room 186 from scope.Details
revision to pa. #201005132363 to delete all work at room 186 from scope. | ||
| May 25, 2010 | Completed final sign-off Jun 2010 | 150 Oak St | Rcm Fire Protection Inc. | add one sprinkler head from existing main in rm 123 at 1st floorDetails
add one sprinkler head from existing main in rm 123 at 1st floor | $600 |
| May 13, 2010 | Completed final sign-off Aug 2010 | 150 Oak St | interior tenant improvements on 1st. & 4th. flr. no-structural work as shown on plans. sprinklers and fire alarm on separate permit.Details
interior tenant improvements on 1st. & 4th. flr. no-structural work as shown on plans. sprinklers and fire alarm on separate permit. | $20,000 | |
| Mar 30, 2010 | Completed final sign-off Jun 2010 | 150 Oak St | add (n) bathroom in (e) storage space.Details
add (n) bathroom in (e) storage space. | $10,000 | |
| Sep 16, 2009 | Completed final sign-off Sep 2009 | 150 Oak St | remove and replace water damaged sheetrock from finished floor to 2 feet aff at affected area on the 4th floor to room 469, consisting of 6 classrooms and 1 office. some ceiling tiles to be replaced at 3rd fl below, all tiles in room 469. floor to ceiling sheetrock replacement in room 469 all rockDetails
remove and replace water damaged sheetrock from finished floor to 2 feet aff at affected area on the 4th floor to room 469, consisting of 6 classrooms and 1 office. some ceiling tiles to be replaced at 3rd fl below, all tiles in room 469. floor to ceiling sheetrock replacement in room 469 all rock | $15,000 | |
| Jul 27, 2009 | Completed final sign-off Aug 2009 | 150 Oak St | Simplex Grinnell | install 2 new door holders on the 4th fl for (e) fire alarm systemDetails
install 2 new door holders on the 4th fl for (e) fire alarm system | $1,500 |
| Jul 2, 2009 | Completed final sign-off Aug 2009 | 150 Oak St | modification to (e) bathroom - replacing sink with toilet/sink @ 1st floor & addition of door to (e) classroom @ 4th floor.Details
modification to (e) bathroom - replacing sink with toilet/sink @ 1st floor & addition of door to (e) classroom @ 4th floor. | $9,500 | |
| Apr 10, 2009 | Never finaled issued Apr 2009, no final | 150 Oak St | sidewalk repair. | ||
| Sep 17, 2008 | Completed final sign-off Oct 2008 | 150 Oak St | Simplex Grinnell | 5th and 6th floor: issued to show changes to matrix to match with (e) conditions at job site per pa# 2008-0731-8158Details
5th and 6th floor: issued to show changes to matrix to match with (e) conditions at job site per pa# 2008-0731-8158 | |
| Aug 28, 2008 | Completed final sign-off Mar 2009 | 150 Oak St | Simplex Grinnell | replace 4 nac panels & 222 notification appliances. modify fire alarm system.Details
replace 4 nac panels & 222 notification appliances. modify fire alarm system. | $50,000 |
| Jul 31, 2008 | Never finaled issued Aug 2008, no final | 150 Oak St | Simplex Grinnell | install 1 nac panel, 9 smoke detectors, 6 duct detectors, 20 notification appliances & 2 control modulesDetails
install 1 nac panel, 9 smoke detectors, 6 duct detectors, 20 notification appliances & 2 control modules | $20,000 |
| Jul 24, 2008 | Expired or cancelled withdrawn Nov 2008 | 150 Oak St | fire alarm t.i. to the 5th and 6th floors. includes addition of 1 nal panel, 9 smoke detectors, 6 duct detectors, 19 strobes, 2 horn strobes and 2 control modulesDetails
fire alarm t.i. to the 5th and 6th floors. includes addition of 1 nal panel, 9 smoke detectors, 6 duct detectors, 19 strobes, 2 horn strobes and 2 control modules | $10,200 | |
| Jul 23, 2008 | Completed final sign-off Aug 2008 | 150 Oak St | modify scope of work for appl#200807166862 at (e) telephone room, change to ductwork.Details
modify scope of work for appl#200807166862 at (e) telephone room, change to ductwork. | ||
| Jul 16, 2008 | Completed final sign-off Aug 2008 | 150 Oak St | install air conditioning equipment at exterior and interior for cooling of telephone/server roomDetails
install air conditioning equipment at exterior and interior for cooling of telephone/server room | $12,000 | |
| Jun 24, 2008 | Completed final sign-off Mar 2009 | 150 Oak St | Westates Mechanical Corporation Inc | modify fire sprinkler system to new tenant improvements. add 49 pendants & relocate 15.Details
modify fire sprinkler system to new tenant improvements. add 49 pendants & relocate 15. | $15,000 |
| Jun 4, 2008 | Completed final sign-off Mar 2009 | 150 Oak St | 4th floor: removal of walls to increase size of a classroom and decrease size of an office, relocate walls and doorways.Details
4th floor: removal of walls to increase size of a classroom and decrease size of an office, relocate walls and doorways. | $18,000 | |
| May 2, 2008 | Completed final sign-off Mar 2009 | 150 Oak St | t.i. on 5th & 6th floors. conversion of (e) assembly into classrooms & library on 6th fl. various t.i. in classrooms & locations. (n) pre-approved seat benches in hallways. (n) m.e.p., fire protection under separate permit. no exterior work.Details
t.i. on 5th & 6th floors. conversion of (e) assembly into classrooms & library on 6th fl. various t.i. in classrooms & locations. (n) pre-approved seat benches in hallways. (n) m.e.p., fire protection under separate permit. no exterior work. | $275,000 | |
| Nov 16, 2007 | Completed final sign-off Mar 2008 | 150 Oak St | Lynn Safety Inc. | installation of roof anchors and railings, opos document frfor window washing equipment/ new guardrail at roofarea 4.Details
installation of roof anchors and railings, opos document frfor window washing equipment/ new guardrail at roofarea 4. | $75,550 |
| Aug 20, 2007 | Completed final sign-off Aug 2007 | 150 Oak St | Allied Heating & Air Conditioning | fabricate and install new supply and return ductwork. provide and install 8 dual duct mixing boxes. provide and install 1 heating coil.this is a revision to permit # 2007/06/14/3979Details
fabricate and install new supply and return ductwork. provide and install 8 dual duct mixing boxes. provide and install 1 heating coil.this is a revision to permit # 2007/06/14/3979 | $150,000 |
| Jul 6, 2007 | Completed final sign-off Jan 2008 | 150 Oak St | voluntary upgrade, upgrade of interior fenestration only - all levelsDetails
voluntary upgrade, upgrade of interior fenestration only - all levels | $16,500 | |
| Jul 6, 2007 | Completed final sign-off Aug 2007 | 150 Oak St | Simplex Grinnell | fire alarm t.i. to basement addition of 8 strobes and 1 booster panel.Details
fire alarm t.i. to basement addition of 8 strobes and 1 booster panel. | $7,000 |
| Jun 28, 2007 | Never finaled issued Jun 2007, no final | 150 Oak St | street space & sidewalk | ||
| Jun 20, 2007 | Completed final sign-off Aug 2007 | 150 Oak St | Rcm Fire Protection Inc. | to relocate 19 upright to relocate 17 pendent from (e) locating & pipingDetails
to relocate 19 upright to relocate 17 pendent from (e) locating & piping | $12,000 |
| Jun 14, 2007 | Completed final sign-off Aug 2007 | 150 Oak St | revision to appl#200705080737 to add demolition at abandoned stairway, remove standpipe. mechanical & electrical under seperate permit.Details
revision to appl#200705080737 to add demolition at abandoned stairway, remove standpipe. mechanical & electrical under seperate permit. | $5,000 | |
| May 8, 2007 | Completed final sign-off Aug 2007 | 150 Oak St | interior remodel of existing storage rooms to offices & workrooms. machinal & electrial under seperate permit.Details
interior remodel of existing storage rooms to offices & workrooms. machinal & electrial under seperate permit. | $190,000 | |
| Oct 24, 2006 | Never finaled issued Oct 2006, no final | 150 Oak St | streetspace and sidewalk | ||
| Jun 16, 2006 | Completed final sign-off Sep 2006 | 150 Oak St | install folding partition in (e) room @ basement floor only.Details
install folding partition in (e) room @ basement floor only. | $32,000 | |
| Aug 16, 2005 | Completed final sign-off Aug 2005 | 150 Oak St | Cahill Contractors Inc | clarification of (e) corridor rating (extract from pa#2005/06/03/4158)Details
clarification of (e) corridor rating (extract from pa#2005/06/03/4158) | |
| Aug 12, 2005 | Completed final sign-off Aug 2005 | 150 Oak St | Simplex Grinnell | revised as builts. corrected seq of ops. to reflect alarm condition for duct detectors. all changesDetails
revised as builts. corrected seq of ops. to reflect alarm condition for duct detectors. all changes | |
| Aug 10, 2005 | Completed final sign-off Aug 2005 | 150 Oak St | Simplex Grinnell | a builts for permit no.#1062994. as builts for app#200507218238. added (2) more a/v's to room 57Details
a builts for permit no.#1062994. as builts for app#200507218238. added (2) more a/v's to room 57 | $6,800 |
| Jul 21, 2005 | Completed final sign-off Aug 2005 | 150 Oak St | addition of two smoke detectors, two control modules for two new fsd/s and three audio visualDetails
addition of two smoke detectors, two control modules for two new fsd/s and three audio visual | $6,800 | |
| Jul 21, 2005 | Completed final sign-off Aug 2005 | 150 Oak St | Allied Heating & Air Conditioning | hvac tenant improvement in basement. install 3 new vav zones and ductwork. install 2 new smoke/fireDetails
hvac tenant improvement in basement. install 3 new vav zones and ductwork. install 2 new smoke/fire | $38,000 |
| Jul 7, 2005 | Completed final sign-off Aug 2005 | 150 Oak St | Cosco Fire Protection Inc. | relocate 17 sprinkler heads 5 -basement; 3- 2nd floor; 9- 4th floorDetails
relocate 17 sprinkler heads 5 -basement; 3- 2nd floor; 9- 4th floor | $4,000 |
| Jun 3, 2005 | Completed final sign-off Aug 2005 | 150 Oak St | modify (e)room to a computer lab @basement,modify unimproved space into conf.room(s)@basement,modifyDetails
modify (e)room to a computer lab @basement,modify unimproved space into conf.room(s)@basement,modify | $475,000 | |
| Aug 23, 2004 | Completed final sign-off Sep 2004 | 150 Oak St | Centimark Corporation | reroofingDetails
reroofing | $26,715 |
| Jul 21, 2004 | Completed final sign-off Aug 2004 | 150 Oak St | Cupertino Electric Inc. | oti-2 basement elDetails
oti-2 basement el | $32,000 |
| Jul 21, 2004 | Completed final sign-off Aug 2004 | 150 Oak St | Cupertino Electric Inc. | oti-3 , basement, ls, fire alarmDetails
oti-3 , basement, ls, fire alarm | $6,500 |
| Jul 12, 2004 | Completed final sign-off Jul 2004 | 150 Oak St | Cosco Fire Protection Inc. | central omega sprk head change out. 1490 sprinkler heads will be replaced with same k factorDetails
central omega sprk head change out. 1490 sprinkler heads will be replaced with same k factor | $18,000 |
| Jul 1, 2004 | Completed final sign-off Aug 2004 | 150 Oak St | Allied Heating & Air Conditioning | install one new vav box and distribution ductwork modifiy, ductowork serving (e) storage room in *Details
install one new vav box and distribution ductwork modifiy, ductowork serving (e) storage room in * | $8,000 |
| Jun 23, 2004 | Completed final sign-off Aug 2004 | 150 Oak St | interior t.i to unoccupied space in basement.addition of communication door between class romms atDetails
interior t.i to unoccupied space in basement.addition of communication door between class romms at | $81,700 | |
| Jul 18, 2003 | Completed final sign-off Aug 2003 | 150 Oak St | modify existing rooms,2 require removal of a non rated wall between rooms, 3rd requiresDetails
modify existing rooms,2 require removal of a non rated wall between rooms, 3rd requires | $26,000 | |
| Jun 30, 2003 | Completed final sign-off Aug 2003 | 150 Oak St | Cosco Fire Protection Inc. | fire sprinkler modifications for tenant improvements in basement multi-purpose room 009 & rm 398. reDetails
fire sprinkler modifications for tenant improvements in basement multi-purpose room 009 & rm 398. re | $3,950 |
| Jun 2, 2003 | Never finaled issued Jun 2003, no final | 150 Oak St | Allied Heating & Air Conditioning | install distribution duct work to existing hvac system, and re balance the zone-mech work only inDetails
install distribution duct work to existing hvac system, and re balance the zone-mech work only in | $10,000 |
| May 28, 2003 | Completed final sign-off Sep 2003 | 150 Oak St | interior remodel of existing basement storage spc to create a student multi-purpose rm, work will inDetails
interior remodel of existing basement storage spc to create a student multi-purpose rm, work will in | $162,000 | |
| Apr 3, 2003 | Completed final sign-off Apr 2003 | 150 Oak St | Cahill Const Service Inc | renew 200204305342/200108065343Details
renew 200204305342/200108065343 | |
| Jan 23, 2003 | Completed final sign-off Mar 2003 | 150 Oak St | revision to app #200204164095Details
revision to app #200204164095 | $50 | |
| Jan 14, 2003 | Completed final sign-off Mar 2003 | 150 Oak St | Cupertino Electric Inc. | as built to original fire alarm drawing under 200207080856 work in bsement only under this permitDetails
as built to original fire alarm drawing under 200207080856 work in bsement only under this permit | |
| Jul 8, 2002 | Completed final sign-off Mar 2003 | 150 Oak St | Cupertino Electric Inc. | add fire alarm equipment & devices on basement level & tie into (e) fire alarm systemDetails
add fire alarm equipment & devices on basement level & tie into (e) fire alarm system | $35,000 |
| May 20, 2002 | Completed final sign-off Mar 2003 | 150 Oak St | revise to app #200204164095 provide mech electrical & fire alarm per plans provide kitchen equipmentDetails
revise to app #200204164095 provide mech electrical & fire alarm per plans provide kitchen equipment | ||
| Apr 30, 2002 | Expired or cancelled expired Apr 2003 | 150 Oak St | Cahill Const Service Inc | convert 2 offices into classroom by removing partition wall, installing fire alarm strobe lightDetails
convert 2 offices into classroom by removing partition wall, installing fire alarm strobe light | $5,000 |
| Apr 23, 2002 | Completed final sign-off Mar 2003 | 150 Oak St | Cosco Fire Protection Inc. | fire sprinkler modifications for t.i. on bsmt level, ref, to appl#200204164095Details
fire sprinkler modifications for t.i. on bsmt level, ref, to appl#200204164095 | $49,794 |
| Apr 16, 2002 | Completed final sign-off Mar 2003 | 150 Oak St | interior remodel in the basement area of the ncis campus facility computer lab multi purpose roomDetails
interior remodel in the basement area of the ncis campus facility computer lab multi purpose room | $1,500,000 | |
| Apr 16, 2002 | Completed final sign-off Mar 2003 | 150 Oak St | Cahill Contractors Inc | shoring against city sidewalk for future ada rampDetails
shoring against city sidewalk for future ada ramp | $40,000 |
| Aug 6, 2001 | Expired or cancelled expired Apr 2003 | 150 Oak St | Cahill Contractors Inc | soft demolition and removal of all extg partition walls at bsmntDetails
soft demolition and removal of all extg partition walls at bsmnt | $75,000 |
| Jul 10, 2001 | Completed final sign-off Feb 2002 | 150 Oak St | Cosco Fire Protection Inc. | fire sprinkler modifications for tenant improvement on 4th floor, rsm 441,446, 448-ref cahi contrs pDetails
fire sprinkler modifications for tenant improvement on 4th floor, rsm 441,446, 448-ref cahi contrs p | $1,500 |
| May 22, 2001 | Completed final sign-off Feb 2002 | 150 Oak St | renovation/alteration/to extg class rooms 4th and 5th flrDetails
renovation/alteration/to extg class rooms 4th and 5th flr | $90,000 | |
| Apr 25, 2001 | Expired or cancelled expired Sep 2001 | 150 Oak St | Cupertino Electric Inc. | additional fire alarm devices added to extg addressable system floors 2,3,6Details
additional fire alarm devices added to extg addressable system floors 2,3,6 | $5,000 |
| Aug 14, 2000 | Expired or cancelled expired Feb 2001 | 150 Oak St | Allied Heating & Air Conditioning | outside air supply to n classrooms on 6th floorDetails
outside air supply to n classrooms on 6th floor | $5,490 |
| Jul 26, 2000 | Expired or cancelled expired Jan 2001 | 150 Oak St | Cahill Const Service Inc | addistion of outlets and addition of new partitions & finishes mech & elec under separate permitDetails
addistion of outlets and addition of new partitions & finishes mech & elec under separate permit | $20,000 |
| Jul 12, 2000 | Expired or cancelled expired Nov 2000 | 150 Oak St | Cupertino Electric Inc. | add:smoke detectors, horns and strobes to (e) fire alarm systemDetails
add:smoke detectors, horns and strobes to (e) fire alarm system | $2,325 |
| Jun 1, 2000 | Expired or cancelled expired Oct 2000 | 150 Oak St | Cosco Fire Protection Inc. | fire sprinkler modifications for tenant improvements on 6th fl-ref permit 909342Details
fire sprinkler modifications for tenant improvements on 6th fl-ref permit 909342 | $4,015 |
| May 4, 2000 | Expired or cancelled expired May 2001 | 150 Oak St | Cahill Const Service Inc | removal of mechanical ducts, addition of outlets & sink, addition of new partitions & finishesDetails
removal of mechanical ducts, addition of outlets & sink, addition of new partitions & finishes | $145,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Related California Construction Llc (12), Johnson Controls Fire (8), Simplex Grinnell (8), Cosco Fire Protection Inc. (6), Cupertino Electric Inc. (6), Westates Mechanical Corporation Inc (6), Allied Heating & Air Conditioning (5), Cahill Const Service Inc (5), Cahill Contractors Inc (4), Rcm Fire Protection Inc. (3), Cahill Contractors Llc. (2), Centimark Corporation (2), Anderson, Rowe & Buckley, Inc., Bobcomm Llc Dba Pacific Das Llc., Lynn Safety Inc., Martinelli Environmental Graph
- Architects
- Joshua Cohn (22), Calvin Lee
- Engineers
- Chris Warner (3), Dennis Cheung (2), Mechanical Engineer Brian H Coday (2), Mike Narouzi (2), Dean Macy, Mechanical Engineer Meng-Hsiu Chen, Richard Lam, Steve Xu, Theodore G. Garcia, Yue Xu
- Authorized agents
- Arash Baradaran, Kobi Yamasaka
- Designers
- Ronald Gilbert Mayle, Westates Mechanical Cor
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.