Meng-Hsiu Chen
- License
- 19582
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- engineer
- Firm
- Mhc Engineers
- Based in
- San Francisco
- On San Francisco permits
- Apr 2024 to Mar 2026
3 permits since 2000 (engineer on 3 permits): 3 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- 4-Mac Construction, Matafied Mechanical, Related California Construction Llc
- Architects
- David Hecht, Joshua Cohn
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 5, 2026 | Completed final sign-off Jun 2026 | 311 Divisadero St | Matafied Mechanical | upgrading type 1 hood system, ductwork and fan for safety and efficiency and replace with new.Details
upgrading type 1 hood system, ductwork and fan for safety and efficiency and replace with new. | $75,000 |
| Feb 20, 2026 | Completed final sign-off Nov 2026 | 150 Oak St | Related California Construction Llc | ab-004 priority phase 2c: voluntary & selective renovation of (e) mep systems serving approx 125,400 gsf of the 177,800 gsf of entire (e) bldg. proposed mep design will supplement current arch & struc ti. non-seismic struc work ltd to addition of penthouse rooftop support & anchorage of mech equip.Details
ab-004 priority phase 2c: voluntary & selective renovation of (e) mep systems serving approx 125,400 gsf of the 177,800 gsf of entire (e) bldg. proposed mep design will supplement current arch & struc ti. non-seismic struc work ltd to addition of penthouse rooftop support & anchorage of mech equip. | $16,200,000 |
| Apr 8, 2024 | Completed final sign-off Apr 2025 | 835 Larkin St | 4-Mac Construction | prop h: non-structural alterations to (e) retail space for new immersive theater space. open kitchen w/ventless hood, powder rm, mech system, lighting and primary entry modifications.Details
prop h: non-structural alterations to (e) retail space for new immersive theater space. open kitchen w/ventless hood, powder rm, mech system, lighting and primary entry modifications. | $55,000 |