Brian H Coday
- License
- 31745
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- engineer
- Firm
- Cmt
- Based in
- San Jose
- On San Francisco permits
- Dec 2020 to Feb 2026
6 permits since 2000 (engineer on 6 permits): 6 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Hathaway Dinwiddie Co. (3), Related California Construction Llc (2), Truebeck Construction
- Architects
- Sam Nunes (3), Joshua Cohn (2), Dga
- Engineers
- Sandra Biddulph (3), Elisabeth M Allen
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 25, 2026 | Completed final sign-off Nov 2026 | 150 Oak St | Related California Construction Llc | ab-004 priority phase 2.1: int ti-construct (n) staff-operated kitchen in basement lvl w/comm cooking eq, food prep area & servery line. students & faculty will have no access to kitchen. install (n) grease interceptor w/in (e) cafeteria & minor arch finish. modification/ext to (e)fa & fs as req.Details
ab-004 priority phase 2.1: int ti-construct (n) staff-operated kitchen in basement lvl w/comm cooking eq, food prep area & servery line. students & faculty will have no access to kitchen. install (n) grease interceptor w/in (e) cafeteria & minor arch finish. modification/ext to (e)fa & fs as req. | $750,000 |
| Dec 29, 2025 | Completed final sign-off Nov 2026 | 150 Oak St | Related California Construction Llc | ab-004 priority phase 2.2: non-structural int ti-establish staff-operated cafe serving hs students on 6th flr. limited to int arch finishes &typical mep modifications. cafe provide pre-pared, non-cooked food & bev only; no cooking equip, hooods or special ventilation of fp req. student/faculty willDetails
ab-004 priority phase 2.2: non-structural int ti-establish staff-operated cafe serving hs students on 6th flr. limited to int arch finishes &typical mep modifications. cafe provide pre-pared, non-cooked food & bev only; no cooking equip, hooods or special ventilation of fp req. student/faculty will | $180,000 |
| Apr 19, 2023 | Completed final sign-off May 2025 | 1450 Owens St | Truebeck Construction | main lobby improvements at the main entrance to a 7-story warm shell and core lab/office buildingDetails
main lobby improvements at the main entrance to a 7-story warm shell and core lab/office building | $800,000 |
| Dec 23, 2020 | Completed final sign-off Jan 2023 | 1 De Haro St | Hathaway Dinwiddie Co. | level 1: first time t.i.. non-structural demo, new servery, dining hall, pdr and storage spaces. new restrooms on mezzanine. office use approved pursuant to planning commission motion no.20206. case no.2015-015010 ofa.Details
level 1: first time t.i.. non-structural demo, new servery, dining hall, pdr and storage spaces. new restrooms on mezzanine. office use approved pursuant to planning commission motion no.20206. case no.2015-015010 ofa. | $2,000,000 |
| Dec 22, 2020 | Completed final sign-off Jan 2023 | 1 De Haro St | Hathaway Dinwiddie Co. | level 2: first time t.i.. non-structural demo. new pdr labs & workspaces. new storage spaces. office space approved pursuant to planning commission 20206 (2015-015010 ofa). no a-3 occupancy on this floor. life safety deferred.Details
level 2: first time t.i.. non-structural demo. new pdr labs & workspaces. new storage spaces. office space approved pursuant to planning commission 20206 (2015-015010 ofa). no a-3 occupancy on this floor. life safety deferred. | $2,000,000 |
| Dec 22, 2020 | Completed final sign-off Jan 2023 | 1 De Haro St | Hathaway Dinwiddie Co. | level 3: first time t.i.. new open office seating, meeting rooms & restrooms, office use approved pursuant to planning commission motion no.20206 (2015-015010 ofa). no a-3 occupancy on this floor.Details
level 3: first time t.i.. new open office seating, meeting rooms & restrooms, office use approved pursuant to planning commission motion no.20206 (2015-015010 ofa). no a-3 occupancy on this floor. | $2,000,000 |