| Sep 17, 2026 | In progress filed Sep 2026, not yet issued | 1450 Owens St | deferred mech and bulletin 1 wall location and ceiling updates for office ara nd support space at lvl 1,5-7. amend to (e) pa 202512232555 & 202603278446 | ||
| Mar 27, 2026 | In progress issued Apr 2026 | 1450 Owens St | Truebeck Construction | partial interior demolition of existing slab on level 1 ref bpa#2025-1223-2555- interior ti. ref bpa#202204202594 bulleting 8 revision sof 202012281760 core and shell | $24,500 |
| Jan 5, 2026 | In progress issued Jul 2026 | 1450 Owens St | Truebeck Construction | interior ti to build-out offices, r & d laboratories & support spaces at levels 1, 5-7 of an (e) 7 story core & shell building. | $26,400,000 |
| Nov 20, 2024 | Expired or cancelled withdrawn Apr 2025 | 1450 Owens St | Prime Electric | the 40.2 kw system will be comprised of (67) 600w hanwha q.cell modules, (67) solaredge optimizers (1) 30 kw solaredge inverter. revision to pa# 202407166568, design change narrative attached. additional $2000 construction valuation for change, moved location of (6) solar modules. | $2,000 |
| Nov 14, 2024 | Completed final sign-off Feb 2025 | 1450 Owens St | Truebeck Construction | as built drawing to 202309076120 & 202012281760.a(n) notifier nfs2-3030, intelligent, addressable, network, voice fire alarm system is being installed as part of this (n)construction high rise-lab & office project.this project will be the installation of the fire alarm in the core areas of the bldg. | |
| Aug 21, 2024 | Completed final sign-off Feb 2025 | 1450 Owens St | Truebeck Construction | revision to pa#: 202012281760 addendum 3. update smoke control sequence of operation to match smoke control matrix for energizing smoke exhaust fans and stair pressurization fans | |
| Jul 26, 2024 | Completed final sign-off Feb 2025 | 1450 Owens St | Truebeck Construction | the 40.2 kw system will be comprised of (67)600w hanwha q.cell modules,(67)tigo rapid shutdows(1)36kw solectria inverter to meet the better roofs & green building code pv requirements for new building constructed under site pa # 202012281760. | $200,000 |
| Jun 10, 2024 | Completed final sign-off Dec 2024 | 1450 Owens St | Priority Architectural Graphics Dba Prio | sign m.01 92" x 62" | $10,000 |
| May 30, 2024 | Completed final sign-off Jan 2025 | 1450 Owens St | Truebeck Construction | deferred submittal to pa# 202012281760 - new irrigation and foundation for public artwork installation. | $10,000 |
| Mar 15, 2024 | Completed final sign-off May 2024 | 1450 Owens St | Truebeck Construction | revision to pid pa# 202307263056, pa# 202204202594, & pa# 202210043668. to incorporate final scp revisions required by landscape & public art coordination. | |
| Jan 11, 2024 | Completed final sign-off May 2024 | 1450 Owens St | Priority Architectural Graphics Dba Prio | 31 evacuation plan maps floors 1 thru 7 for fire review only | $13,950 |
| Sep 7, 2023 | Completed final sign-off Feb 2025 | 1450 Owens St | Truebeck Construction | revision to fa permit# 202012281760 s7. submittal smoke control panel drawing showing the reconfiguration of the ahus depiction. | |
| Jul 26, 2023 | Completed final sign-off May 2024 | 1450 Owens St | Truebeck Construction | revision to pa# 202204202594 & pa# 202210043668. provide civil stormwater updates due to art sculpture addition and final scp comments. | |
| Jun 1, 2023 | Completed final sign-off Jun 2024 | 1450 Owens St | Priority Architectural Graphics Dba Prio | 31 evacuation plan maps floors 1-7 & penthouse for fire review only. | $13,950 |
| Apr 20, 2023 | Completed final sign-off Apr 2024 | 1450 Owens St | H & M Fire Protection, Inc. | install 39 pendent ceiling sprinklers on flexheads from existing 1" plugged outlets. ref ti permit 202304196000 | $25,000 |
| Apr 19, 2023 | Completed final sign-off May 2025 | 1450 Owens St | Truebeck Construction | main lobby improvements at the main entrance to a 7-story warm shell and core lab/office building | $800,000 |
| Oct 4, 2022 | Completed final sign-off May 2024 | 1450 Owens St | Truebeck Construction | revision to pa#202204202594. update civil sewer and stormwater lateral to avoid existing joint utility trench along nelson rising lane. | |
| Sep 6, 2022 | Completed final sign-off Jan 2024 | 1450 Owens St | H & M Fire Protection, Inc. | new 8in fire sprinkler water service connecting to an (e) 8in main on street. ref pa 202012281760. | $30,000 |
| Apr 20, 2022 | Completed final sign-off May 2024 | 1450 Owens St | Truebeck Construction | civil stormwater design and building plumbing design associated w/ pa #202012281760. | $25,000 |
| Dec 21, 2021 | Completed final sign-off Jul 2023 | 1450 Owens St | Truebeck Construction | pile load test program for augered cast in place piles in support of a planned 7 story shell and core office/lab high-rise. | $10,000 |
| Dec 6, 2021 | Completed final sign-off May 2024 | 1450 Owens St | Truebeck Construction | test section of planned stone column ground improvements reference 202012281760 | $10,000 |
| Jul 19, 2021 | Completed final sign-off Mar 2024 | 1450 Owens St | Truebeck Construction | site grading in support of a planned 7 story shell & core lab/office high rise. | $5,000 |
| Dec 28, 2020 | Completed final sign-off May 2025 | 1450 Owens St | Truebeck Construction | construction of a 7-story, type 1-a, warm shell and core for approximately 192,000 gross square feet of 8709 | $68,000,000 |
| May 29, 2018 | Completed final sign-off Aug 2018 | 1450 Owens St | Truebeck Construction | restripe (e) parking lot to add ada accessibile parking spot | $2,000 |