Permit GraphSan Francisco building permits since 2000

Block 8709, lot 017

1450 Owens St

24 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Sep 17, 2026In progress
filed Sep 2026, not yet issued
1450 Owens Stdeferred mech and bulletin 1 wall location and ceiling updates for office ara nd support space at lvl 1,5-7. amend to (e) pa 202512232555 & 202603278446
Mar 27, 2026In progress
issued Apr 2026
1450 Owens StTruebeck Constructionpartial interior demolition of existing slab on level 1 ref bpa#2025-1223-2555- interior ti. ref bpa#202204202594 bulleting 8 revision sof 202012281760 core and shell$24,500
Jan 5, 2026In progress
issued Jul 2026
1450 Owens StTruebeck Constructioninterior ti to build-out offices, r & d laboratories & support spaces at levels 1, 5-7 of an (e) 7 story core & shell building.$26,400,000
Nov 20, 2024Expired or cancelled
withdrawn Apr 2025
1450 Owens StPrime Electricthe 40.2 kw system will be comprised of (67) 600w hanwha q.cell modules, (67) solaredge optimizers (1) 30 kw solaredge inverter. revision to pa# 202407166568, design change narrative attached. additional $2000 construction valuation for change, moved location of (6) solar modules.$2,000
Nov 14, 2024Completed
final sign-off Feb 2025
1450 Owens StTruebeck Constructionas built drawing to 202309076120 & 202012281760.a(n) notifier nfs2-3030, intelligent, addressable, network, voice fire alarm system is being installed as part of this (n)construction high rise-lab & office project.this project will be the installation of the fire alarm in the core areas of the bldg.
Aug 21, 2024Completed
final sign-off Feb 2025
1450 Owens StTruebeck Constructionrevision to pa#: 202012281760 addendum 3. update smoke control sequence of operation to match smoke control matrix for energizing smoke exhaust fans and stair pressurization fans
Jul 26, 2024Completed
final sign-off Feb 2025
1450 Owens StTruebeck Constructionthe 40.2 kw system will be comprised of (67)600w hanwha q.cell modules,(67)tigo rapid shutdows(1)36kw solectria inverter to meet the better roofs & green building code pv requirements for new building constructed under site pa # 202012281760.$200,000
Jun 10, 2024Completed
final sign-off Dec 2024
1450 Owens StPriority Architectural Graphics Dba Priosign m.01 92" x 62"$10,000
May 30, 2024Completed
final sign-off Jan 2025
1450 Owens StTruebeck Constructiondeferred submittal to pa# 202012281760 - new irrigation and foundation for public artwork installation.$10,000
Mar 15, 2024Completed
final sign-off May 2024
1450 Owens StTruebeck Constructionrevision to pid pa# 202307263056, pa# 202204202594, & pa# 202210043668. to incorporate final scp revisions required by landscape & public art coordination.
Jan 11, 2024Completed
final sign-off May 2024
1450 Owens StPriority Architectural Graphics Dba Prio31 evacuation plan maps floors 1 thru 7 for fire review only$13,950
Sep 7, 2023Completed
final sign-off Feb 2025
1450 Owens StTruebeck Constructionrevision to fa permit# 202012281760 s7. submittal smoke control panel drawing showing the reconfiguration of the ahus depiction.
Jul 26, 2023Completed
final sign-off May 2024
1450 Owens StTruebeck Constructionrevision to pa# 202204202594 & pa# 202210043668. provide civil stormwater updates due to art sculpture addition and final scp comments.
Jun 1, 2023Completed
final sign-off Jun 2024
1450 Owens StPriority Architectural Graphics Dba Prio31 evacuation plan maps floors 1-7 & penthouse for fire review only.$13,950
Apr 20, 2023Completed
final sign-off Apr 2024
1450 Owens StH & M Fire Protection, Inc.install 39 pendent ceiling sprinklers on flexheads from existing 1" plugged outlets. ref ti permit 202304196000$25,000
Apr 19, 2023Completed
final sign-off May 2025
1450 Owens StTruebeck Constructionmain lobby improvements at the main entrance to a 7-story warm shell and core lab/office building$800,000
Oct 4, 2022Completed
final sign-off May 2024
1450 Owens StTruebeck Constructionrevision to pa#202204202594. update civil sewer and stormwater lateral to avoid existing joint utility trench along nelson rising lane.
Sep 6, 2022Completed
final sign-off Jan 2024
1450 Owens StH & M Fire Protection, Inc.new 8in fire sprinkler water service connecting to an (e) 8in main on street. ref pa 202012281760.$30,000
Apr 20, 2022Completed
final sign-off May 2024
1450 Owens StTruebeck Constructioncivil stormwater design and building plumbing design associated w/ pa #202012281760.$25,000
Dec 21, 2021Completed
final sign-off Jul 2023
1450 Owens StTruebeck Constructionpile load test program for augered cast in place piles in support of a planned 7 story shell and core office/lab high-rise.$10,000
Dec 6, 2021Completed
final sign-off May 2024
1450 Owens StTruebeck Constructiontest section of planned stone column ground improvements reference 202012281760$10,000
Jul 19, 2021Completed
final sign-off Mar 2024
1450 Owens StTruebeck Constructionsite grading in support of a planned 7 story shell & core lab/office high rise.$5,000
Dec 28, 2020Completed
final sign-off May 2025
1450 Owens StTruebeck Constructionconstruction of a 7-story, type 1-a, warm shell and core for approximately 192,000 gross square feet of 8709$68,000,000
May 29, 2018Completed
final sign-off Aug 2018
1450 Owens StTruebeck Constructionrestripe (e) parking lot to add ada accessibile parking spot$2,000