Block 2636, lot 003
8 Locksley Ave
- City’s use
- Multi-Family Residential
- Built
- 1961
- Stories
- 12
- Units
- 244
- Rooms
- 280 bathrooms
- Building
- 205,770 sq ft
- Lot
- 146,697 sq ft
- Zoning
- RM4
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
104 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 24, 2026 | In progress issued Aug 2026 | 8 Locksley Av | Mishal Builders And Contractors Inc | units 6h and 8e- replace kitchen cabinets countertops and update electrical for kitchen work. no structual work. partial bath remodel in kind replace vanity and toilets in kindDetails
units 6h and 8e- replace kitchen cabinets countertops and update electrical for kitchen work. no structual work. partial bath remodel in kind replace vanity and toilets in kind | $50,000 |
| Aug 24, 2026 | In progress issued Aug 2026 | 6 Locksley Av | Mishal Builders And Contractors Inc | unit 8f- replace kitchen cabinets countertops and update electrical for kitchen work. no structual work. partial bath remodel in kind replace vanity and toilets in kindDetails
unit 8f- replace kitchen cabinets countertops and update electrical for kitchen work. no structual work. partial bath remodel in kind replace vanity and toilets in kind | $25,000 |
| Aug 18, 2026 | In progress issued Aug 2026 | 6 Locksley Av | Mishal Builders And Contractors Inc | apt 2e:kitchen remodel in kind - replace kitchen cabinets, countertop,update electric for kitchen, work for apt #2e.no structural work. partial bath remodel in kind-replace vanity and toilet in kind. no change to floor layout.no change to wall layout. no structural work.maintain all (e) fire rating.Details
apt 2e:kitchen remodel in kind - replace kitchen cabinets, countertop,update electric for kitchen, work for apt #2e.no structural work. partial bath remodel in kind-replace vanity and toilet in kind. no change to floor layout.no change to wall layout. no structural work.maintain all (e) fire rating. | $25,000 |
| Aug 18, 2026 | In progress issued Aug 2026 | 8 Locksley Av | Mishal Builders And Contractors Inc | apt#5e & #10d: remodel (e) kitchen in kind - replace kitchen cabinets, countertop, update electric for kitchen. partial bath remodel in kind - replace vanity and toilet in kind. no change to floor layout. no change to wall layout. no structural work. maintain all (e) fire rating.Details
apt#5e & #10d: remodel (e) kitchen in kind - replace kitchen cabinets, countertop, update electric for kitchen. partial bath remodel in kind - replace vanity and toilet in kind. no change to floor layout. no change to wall layout. no structural work. maintain all (e) fire rating. | $50,000 |
| Aug 10, 2026 | In progress issued Aug 2026 | 6 Locksley Av | Mishal Builders And Contractors Inc | replace kitchen cabinets, countertop, update electric for kitchen, work for apt 9k. no structural work. partial bath remodel, in kind replace vanity and toilet in kind.Details
replace kitchen cabinets, countertop, update electric for kitchen, work for apt 9k. no structural work. partial bath remodel, in kind replace vanity and toilet in kind. | $25,000 |
| Aug 4, 2026 | In progress issued Aug 2026 | 8 Locksley Av | Mishal Builders And Contractors Inc | apt#7f/ replace kitchen cabinets, countertops, and update electrical for kitchen remodel. prtial bathroom remodel, replace vanity and toilet. no structural work all work in-kind.Details
apt#7f/ replace kitchen cabinets, countertops, and update electrical for kitchen remodel. prtial bathroom remodel, replace vanity and toilet. no structural work all work in-kind. | $25,000 |
| Aug 4, 2026 | In progress issued Aug 2026 | 6 Locksley Av | Mishal Builders And Contractors Inc | 2 apartment unit(s) for 10(h) & 5(h) replace kitchen cabinets, countertops, and update electrical for kitchen remodel. prtial bathroom remodel, replace vanity and toilet. no structural work all work in-kind.Details
2 apartment unit(s) for 10(h) & 5(h) replace kitchen cabinets, countertops, and update electrical for kitchen remodel. prtial bathroom remodel, replace vanity and toilet. no structural work all work in-kind. | $50,000 |
| Jun 2, 2026 | In progress issued Jun 2026 | 6 Locksley Av | Mishal Builders And Contractors Inc | units 2k, 7h, 4a: kitchen and bathroom remodels for all 3 units. no changes to layout or walls.Details
units 2k, 7h, 4a: kitchen and bathroom remodels for all 3 units. no changes to layout or walls. | $60,000 |
| Jun 2, 2026 | In progress issued Jun 2026 | 8 Locksley Av | Mishal Builders And Contractors Inc | units 1a,1h,5h,5j: kitchen and bathroom remodels for all units, no change to walls and layouts. no structural work, no changes to doors & windows.Details
units 1a,1h,5h,5j: kitchen and bathroom remodels for all units, no change to walls and layouts. no structural work, no changes to doors & windows. | $80,000 |
| May 22, 2026 | In progress issued May 2026 | 8 Locksley Av | Mishal Builders And Contractors Inc | unit 4b: partial kitchen remodel in kind - replace kitchen cabinets, countertop in-kind and update electrical for kitchen. partial bathroom remodel in kind - replace vanity and toilet in kind. no change to floor layout. no change to wall layout. no structural work.Details
unit 4b: partial kitchen remodel in kind - replace kitchen cabinets, countertop in-kind and update electrical for kitchen. partial bathroom remodel in kind - replace vanity and toilet in kind. no change to floor layout. no change to wall layout. no structural work. | $25,000 |
| Apr 27, 2026 | In progress issued Apr 2026 | 6 Locksley Av | Mishal Builders And Contractors Inc | unit 8h: remodel kitchen, new counter tops, upgrade electrical and plumbing, new cabinets, no structual work.Details
unit 8h: remodel kitchen, new counter tops, upgrade electrical and plumbing, new cabinets, no structual work. | $25,000 |
| Mar 26, 2026 | In progress issued Mar 2026 | 6 Locksley Av | Mishal Builders And Contractors Inc | units 3l,lb,5f: total of 3 kitchen remodels, kitchen cabinets, counter tops, upgrade electrical and plumbing as needed in units.no structural work.Details
units 3l,lb,5f: total of 3 kitchen remodels, kitchen cabinets, counter tops, upgrade electrical and plumbing as needed in units.no structural work. | $75,000 |
| Mar 9, 2026 | In progress issued Mar 2026 | 8 Locksley Av | Mishal Builders And Contractors Inc | apt. 1b: remove & replace caninets, counter top, upgrade electrical work in kitchen: no structural work.install new electrical panel.Details
apt. 1b: remove & replace caninets, counter top, upgrade electrical work in kitchen: no structural work.install new electrical panel. | $75,000 |
| Mar 9, 2026 | In progress issued Mar 2026 | 6 Locksley Av | Mishal Builders And Contractors Inc | apt: 4d, 2b, 4h: remove & replace cabinets, counter top, update elec. no structural work.Details
apt: 4d, 2b, 4h: remove & replace cabinets, counter top, update elec. no structural work. | $75,000 |
| Feb 17, 2026 | In progress issued Feb 2026 | 8 Locksley Av | Mishal Builders And Contractors Inc | unit 3a,3e,6j- replace kitchen cabinets, countertops and update electric for kitchen . no wall removal or layout changes.Details
unit 3a,3e,6j- replace kitchen cabinets, countertops and update electric for kitchen . no wall removal or layout changes. | $75,000 |
| Apr 29, 2024 | Completed final sign-off Nov 2024 | 6 Locksley Av | Rapid Fire Safety&Security Llc Dba Pafa | fire alarm system db testDetails
fire alarm system db test | |
| Nov 13, 2023 | In progress issued Nov 2023 | 6 Locksley Av | Rod's General Builders Inc | 1m: fire damage refpairs-kitchen and bathroom remodel. new electrical (like for like ) new led ligiting fixtures, new plumbing fixture. drywall repair, framing and flooring. (interior work only)Details
1m: fire damage refpairs-kitchen and bathroom remodel. new electrical (like for like ) new led ligiting fixtures, new plumbing fixture. drywall repair, framing and flooring. (interior work only) | $40,000 |
| Nov 7, 2023 | Completed final sign-off Mar 2024 | 6 Locksley Av | Rod's General Builders Inc | unit il & unit 2m: kitchen and bathroom remodeling. new cabinets and counter tops. moving circuits , add 3 dedicate circuits, 3 light fixtures, new plumbing fixtures. drywall repair and painting (interior only). unit 2m 1x1 (kitchen & bath)Details
unit il & unit 2m: kitchen and bathroom remodeling. new cabinets and counter tops. moving circuits , add 3 dedicate circuits, 3 light fixtures, new plumbing fixtures. drywall repair and painting (interior only). unit 2m 1x1 (kitchen & bath) | $35,000 |
| Sep 22, 2023 | Completed final sign-off Oct 2023 | 8 Locksley Av | Diablo Telecom & Construction Inc | revision 202206307441: install 2" conduit with 3 2/0 awg thhn with #2 ground and 100 amp 2 pole breakerDetails
revision 202206307441: install 2" conduit with 3 2/0 awg thhn with #2 ground and 100 amp 2 pole breaker | |
| Apr 4, 2023 | Never finaled issued Apr 2023, no final | 8 Locksley Av | Rod's General Builders Inc | unit# 1a: kitchen and bathroom remodel. replace cabinets and countertops. drywall repair and paint. new flooring.Details
unit# 1a: kitchen and bathroom remodel. replace cabinets and countertops. drywall repair and paint. new flooring. | $25,000 |
| Mar 29, 2023 | Never finaled issued Mar 2023, no final | 8 Locksley Av | Skylor Construction Dba Skycore Constr | repair 3'-0" ht x 75'-0" wood fence/retaining wall in rearDetails
repair 3'-0" ht x 75'-0" wood fence/retaining wall in rear | $10,000 |
| Dec 29, 2022 | Never finaled filed Dec 2022, never issued | 8 Locksley Av | conversion of (e) un-used carpark spots on the 1st floor into new break-room at 8 locksley ave.Details
conversion of (e) un-used carpark spots on the 1st floor into new break-room at 8 locksley ave. | $40,000 | |
| Dec 28, 2022 | Never finaled filed Dec 2022, never issued | 6 Locksley Av | conversion of (e) un-used storage on the 1st floor into (4) new adus with (n) kitchen, bedroom, living room, bathroom at 6 locksley ave. local ordinance.Details
conversion of (e) un-used storage on the 1st floor into (4) new adus with (n) kitchen, bedroom, living room, bathroom at 6 locksley ave. local ordinance. | $200,000 | |
| Nov 29, 2022 | Completed final sign-off Jan 2023 | 8 Locksley Av | Rod's General Builders Inc | unit #3c: (1) kitchen and (1) bathroom remodel. replace cabinets and countertops. drywall repair, painting, new plumbing fixutre only, add (3) lights. add (3) dedicated circuits.Details
unit #3c: (1) kitchen and (1) bathroom remodel. replace cabinets and countertops. drywall repair, painting, new plumbing fixutre only, add (3) lights. add (3) dedicated circuits. | $35,000 |
| Oct 4, 2022 | Never finaled issued Oct 2022, no final | 8 Locksley Av | Rod's General Builders Inc | #5c. kitchen and bath remodel. remodel cabinets and countertops, drywall repairs, paint, new flooringDetails
#5c. kitchen and bath remodel. remodel cabinets and countertops, drywall repairs, paint, new flooring | $25,000 |
| Jun 30, 2022 | Completed final sign-off Oct 2023 | 8 Locksley Av | Modus Rex Llc | dish - install 3(n) antennas behind (n) screening; install 6(n) rrus; install 1(n) roof platform w/1(n) cabinet; install other small equipment; install 2(n) batteriesDetails
dish - install 3(n) antennas behind (n) screening; install 6(n) rrus; install 1(n) roof platform w/1(n) cabinet; install other small equipment; install 2(n) batteries | $110,000 |
| May 9, 2022 | Never finaled issued May 2022, no final | 6 Locksley Av | Rod's General Builders Inc | apt 9j: kitchen and bathroom remodeling- replace cabinets and countertops. moving existing circuits, add 3 dedicated circuits, add 3 light fixtures new plumbing fixtures. dry wall repair and painting.Details
apt 9j: kitchen and bathroom remodeling- replace cabinets and countertops. moving existing circuits, add 3 dedicated circuits, add 3 light fixtures new plumbing fixtures. dry wall repair and painting. | $20,000 |
| May 9, 2022 | Completed final sign-off Jul 2022 | 6 Locksley Av | Rod's General Builders Inc | apt 6k: kitchen and bathroom remodeling- replace cabinets and coutertops. moving existing circuits, add 3 dedicated circuits, add 3 light fixtures new plumbing fixtures. dry wall repair and painting.Details
apt 6k: kitchen and bathroom remodeling- replace cabinets and coutertops. moving existing circuits, add 3 dedicated circuits, add 3 light fixtures new plumbing fixtures. dry wall repair and painting. | $20,000 |
| Apr 16, 2021 | Completed final sign-off May 2021 | 8 Locksley Av | Rod's General Builders Inc | kichen and bahroom remdleng one new lightng shall cmply w/cec 150-0(k) 3 & (k) s no new wall and no (e) wall relocation replace cabinets and countertops move (e) circuts and 3 dedicated circuts add 3 light fixtures new lumbing fixtures drywall repair and painting at bathroom and kitchen onlyDetails
kichen and bahroom remdleng one new lightng shall cmply w/cec 150-0(k) 3 & (k) s no new wall and no (e) wall relocation replace cabinets and countertops move (e) circuts and 3 dedicated circuts add 3 light fixtures new lumbing fixtures drywall repair and painting at bathroom and kitchen only | $15,000 |
| Feb 25, 2021 | Completed final sign-off Apr 2021 | 8 Locksley Av | Rod's General Builders Inc | #9e. kitchen & bathroom remodeling. replace cabinets & counter tops. moving existing circuits, add 3 dedicated circuts, add 3 light fixtures. new plumbing fixtures, dry wall repair & painting.Details
#9e. kitchen & bathroom remodeling. replace cabinets & counter tops. moving existing circuits, add 3 dedicated circuts, add 3 light fixtures. new plumbing fixtures, dry wall repair & painting. | $6,000 |
| Feb 25, 2021 | Completed final sign-off Apr 2021 | 6 Locksley Av | Rod's General Builders Inc | #3j. kitchen & bathroom remodeling. replace cabinets & counter tops. moving existing circuits, add 3 dedicated circuts, add 3 light fixtures. new plumbing fixtures, dry wall repair & painting.Details
#3j. kitchen & bathroom remodeling. replace cabinets & counter tops. moving existing circuits, add 3 dedicated circuts, add 3 light fixtures. new plumbing fixtures, dry wall repair & painting. | $6,000 |
| Feb 25, 2021 | Completed final sign-off Apr 2021 | 6 Locksley Av | Rod's General Builders Inc | #8c. kitchen & bathroom remodeling. replace cabinets & counter tops. moving existing circuits, add 3 dedicated circuts, add 3 light fixtures. new plumbing fixtures, dry wall repair & painting.Details
#8c. kitchen & bathroom remodeling. replace cabinets & counter tops. moving existing circuits, add 3 dedicated circuts, add 3 light fixtures. new plumbing fixtures, dry wall repair & painting. | $6,000 |
| Oct 16, 2020 | Never finaled issued Oct 2020, no final | 6 Locksley Av | Rod's General Builders Inc | unit 1a: 1) kitchen and 2) bathrooms renovation. replace cabinets & countertoops. drywall repairs and paint throughout unit (in kind). install new flooring.Details
unit 1a: 1) kitchen and 2) bathrooms renovation. replace cabinets & countertoops. drywall repairs and paint throughout unit (in kind). install new flooring. | $5,000 |
| Oct 16, 2020 | Completed final sign-off Mar 2021 | 8 Locksley Av | Rod's General Builders Inc | unit 4c: kitchen & bath remodel. replace cabinets & countertop in kind. dry wall repairs and paint throughout unit in kind. install new flooring in kindDetails
unit 4c: kitchen & bath remodel. replace cabinets & countertop in kind. dry wall repairs and paint throughout unit in kind. install new flooring in kind | $5,000 |
| Sep 22, 2020 | Never finaled issued Apr 2021, no final | 8 Locksley Av | Betacom, Incorporated | modification to an existing unmanned telecom facility consisting of: removing and replacing 3 rrus and replacing with rbs 6230 power rack & equipment. install 3 antennas, mounts, 6x12 hybrid cables and rrus 4415 b25 units and antennas. remove coax and tmas.Details
modification to an existing unmanned telecom facility consisting of: removing and replacing 3 rrus and replacing with rbs 6230 power rack & equipment. install 3 antennas, mounts, 6x12 hybrid cables and rrus 4415 b25 units and antennas. remove coax and tmas. | $25,000 |
| Jul 31, 2020 | Completed final sign-off Oct 2020 | 6 Locksley Av | Dobry Contracting | apt 7f. kitchen remodel (12x8), same location, in-kind. no walls moved,modified, or infilled.Details
apt 7f. kitchen remodel (12x8), same location, in-kind. no walls moved,modified, or infilled. | $25,000 |
| Aug 23, 2019 | Completed final sign-off Oct 2019 | 6 Locksley Av | Dobry Contracting | unit 6m. kitchen remodel in kind. no walls removed.Details
unit 6m. kitchen remodel in kind. no walls removed. | $25,000 |
| Jul 5, 2019 | Completed final sign-off Oct 2019 | 8 Locksley Av | Dobry Contracting | unit #5l and #3m: in-kind remodel of kitchen and bathroom. same location.no layout changes.Details
unit #5l and #3m: in-kind remodel of kitchen and bathroom. same location.no layout changes. | $73,674 |
| Aug 14, 2018 | Never finaled issued Aug 2018, no final | 8 Locksley Av | Imperial Contracting Llc | kitchen & bathroom remodel in unit 5g - in kind. no moving walls or doors, same location remodel.Details
kitchen & bathroom remodel in unit 5g - in kind. no moving walls or doors, same location remodel. | $25,000 |
| May 14, 2018 | Completed final sign-off Jul 2018 | 8 Locksley Av | Imperial Contracting Llc | unit #3d: kitchen and (1) bathroom remodel. in kind. same location. no moving of walls or doorsDetails
unit #3d: kitchen and (1) bathroom remodel. in kind. same location. no moving of walls or doors | $20,000 |
| May 14, 2018 | Never finaled issued May 2018, no final | 6 Locksley Av | Imperial Contracting Llc | unit #5f: kitchen and bathroom remodel. in kind. same location. no moving of walls or doorsDetails
unit #5f: kitchen and bathroom remodel. in kind. same location. no moving of walls or doors | $20,000 |
| Feb 15, 2018 | Never finaled issued Feb 2018, no final | 8 Locksley Av | Imperial Contracting Llc | revision to 201006295577 to delete work that was previously approved, kitchen and bath remodel. work preformed only in: 1g,4b,4h,5b,5d,5e,8b,9j,10dDetails
revision to 201006295577 to delete work that was previously approved, kitchen and bath remodel. work preformed only in: 1g,4b,4h,5b,5d,5e,8b,9j,10d | |
| Feb 15, 2018 | Completed final sign-off Mar 2018 | 8 Locksley Av | Imperial Contracting Llc | kitchen and 1 bathroom remodel. replacing cabinets and sinks and replacing toilet.Details
kitchen and 1 bathroom remodel. replacing cabinets and sinks and replacing toilet. | $25,000 |
| Feb 15, 2018 | Never finaled issued Feb 2018, no final | 6 Locksley Av | Imperial Contracting Llc | revision to 2010006295575 to delete work that was previously approved for kitchne and bath remodel. work performed only 1g,2b,2k,2g,3e,3f,4g,4h,6l,7c,9b,10d,10jDetails
revision to 2010006295575 to delete work that was previously approved for kitchne and bath remodel. work performed only 1g,2b,2k,2g,3e,3f,4g,4h,6l,7c,9b,10d,10j | |
| Nov 14, 2017 | Completed final sign-off Nov 2017 | 8 Locksley Av | Cisco Builders Construction Company | address correction for pa#201708296340: 8 locksley ave unit 6l.Details
address correction for pa#201708296340: 8 locksley ave unit 6l. | |
| Sep 15, 2017 | Never finaled issued Sep 2017, no final | 6 Locksley Av | Imperial Contracting Llc | to obtain/renew bpa#201006295575 for renovation of work in unit #9b; for work approved under pa#201006295575, all work is completeDetails
to obtain/renew bpa#201006295575 for renovation of work in unit #9b; for work approved under pa#201006295575, all work is complete | $25,000 |
| Aug 29, 2017 | Never finaled issued Aug 2017, no final | 6 Locksley Av | Cisco Builders Construction Company | unit 66: renovation of kitchen and bath in unit. no structural. kitchen rewire replace light fixture and receptacles, 3 lites, 6 switches, 15 receptacles, 1 garage disposal, 1 microwave, 1 range, 2 smoke detectors, 1 dishwasher, replace angle stop, faucets drains, finish plumbing. no wall moved,Details
unit 66: renovation of kitchen and bath in unit. no structural. kitchen rewire replace light fixture and receptacles, 3 lites, 6 switches, 15 receptacles, 1 garage disposal, 1 microwave, 1 range, 2 smoke detectors, 1 dishwasher, replace angle stop, faucets drains, finish plumbing. no wall moved, | $25,000 |
| Nov 22, 2016 | Completed final sign-off May 2017 | 8 Locksley Av | Nuwave International Industries Inc | remove (6) (e) t-mobile antennas; install (3) proposed t-mobile air 32 antennas; install (3) proposed passive antennas; install (1) 6x12 hcs #6 awg 40m cable; remove (1) (e) 6500 bbu cabinet; install (1) proposed 6200 bbu cabinetDetails
remove (6) (e) t-mobile antennas; install (3) proposed t-mobile air 32 antennas; install (3) proposed passive antennas; install (1) 6x12 hcs #6 awg 40m cable; remove (1) (e) 6500 bbu cabinet; install (1) proposed 6200 bbu cabinet | $25,000 |
| Oct 7, 2016 | Never finaled issued Oct 2016, no final | 6 Locksley Av | A -1 Roof Management & Construction, Inc | removal of paint on concrete tilt up wall and apply skim coat colored stucco finish on non-visible walls.Details
removal of paint on concrete tilt up wall and apply skim coat colored stucco finish on non-visible walls. | $180,000 |
| Jan 26, 2016 | Never finaled issued Jan 2016, no final | 6 Locksley Av | Johnson Controls Inc. | roof: installation of heat pump (3-ton cap), 163lbs i (e) sheed room on roof. electrical is sep permit.Details
roof: installation of heat pump (3-ton cap), 163lbs i (e) sheed room on roof. electrical is sep permit. | $38,245 |
| Sep 2, 2015 | Completed final sign-off Mar 2016 | 8 Locksley Av | Process Cellular Inc Dba Procell | remove (3) (e) panel antennas. (1) cabinet. install (3) 6'ft antennas on (e) masts. install (3) new rrus adjacent to new antennas.Details
remove (3) (e) panel antennas. (1) cabinet. install (3) 6'ft antennas on (e) masts. install (3) new rrus adjacent to new antennas. | $20,000 |
| Jul 9, 2015 | Completed final sign-off Mar 2016 | 6 Locksley Av | Chubby Construction | unit #4k. remodel bathroom, remove non load bearing wall, build linen closet, enlarge existing door. new floor tile & vanity toilet. open a 36" door to replace (e) 28" door.Details
unit #4k. remodel bathroom, remove non load bearing wall, build linen closet, enlarge existing door. new floor tile & vanity toilet. open a 36" door to replace (e) 28" door. | $7,000 |
| Jun 22, 2015 | Never finaled issued Nov 2015, no final | 6 Locksley Av | Imperial Contracting Llc | to renew pa# 201006295575 for remainder of work.Details
to renew pa# 201006295575 for remainder of work. | $100,000 |
| Jun 22, 2015 | Never finaled issued Jun 2015, no final | 8 Locksley Av | Imperial Contracting Llc | to renew pa# 201006295577 for remainder of work.Details
to renew pa# 201006295577 for remainder of work. | $100,000 |
| Jul 28, 2014 | Expired or cancelled cancelled Jan 2026 | 8 Locksley Av | reface monument sign.Details
reface monument sign. | $2,500 | |
| Mar 5, 2014 | Completed final sign-off Apr 2015 | 6 Locksley Av | Pinnacle Wireless Usa Inc. | to obtain final inspection for work approved under appn #200204174118. all work is complete.Details
to obtain final inspection for work approved under appn #200204174118. all work is complete. | |
| Mar 5, 2014 | Never finaled issued Jul 2015, no final | 6 Locksley Av | Westower Communications | modification to (e) sirius xm facility on rooftop by replacing one panel antenna & add one vsat dish antenna. replace one equipment cabinet on steel platform also on roof. paint equipment to match.Details
modification to (e) sirius xm facility on rooftop by replacing one panel antenna & add one vsat dish antenna. replace one equipment cabinet on steel platform also on roof. paint equipment to match. | $15,000 |
| Aug 2, 2013 | Expired or cancelled withdrawn Feb 2016 | 8 Locksley Av | replacement of an (e) 2' microwave dish @125'6" above ground level w/no anticipated ground disturbance. work area need at base of tower will be approx. 200 sqft for a duration of + - 5 working days.Details
replacement of an (e) 2' microwave dish @125'6" above ground level w/no anticipated ground disturbance. work area need at base of tower will be approx. 200 sqft for a duration of + - 5 working days. | $10,000 | |
| Mar 19, 2013 | Completed final sign-off Mar 2013 | 6 Locksley Av | C W P Contracting Inc | building and installing cabinets, flooring, paint, furring out against block wallDetails
building and installing cabinets, flooring, paint, furring out against block wall | $15,000 |
| Jan 23, 2013 | Expired or cancelled cancelled Sep 2013 | 8 Locksley Av | C W P Contracting Inc | garage area (basement)- building and installing cabinets, flooring paint, furring against block wall.Details
garage area (basement)- building and installing cabinets, flooring paint, furring against block wall. | $29,000 |
| Nov 29, 2012 | Completed final sign-off Dec 2012 | 8 Locksley Av | Legacy Roofing & Waterproofing Inc | reroofingDetails
reroofing | $38,000 |
| Jun 8, 2012 | Completed final sign-off Jun 2012 | 6 Locksley Av | Regency General Contractors Inc | public area- revision to appl #2012.05.09.0131 to correct (e) construction type is '1a', proposed new maintenance room including new non-structural metal wall partition, wood door, window outlets, switches, dataline & ceiling light.Details
public area- revision to appl #2012.05.09.0131 to correct (e) construction type is '1a', proposed new maintenance room including new non-structural metal wall partition, wood door, window outlets, switches, dataline & ceiling light. | $2,000 |
| Jun 5, 2012 | Completed final sign-off Nov 2012 | 8 Locksley Av | non-structural sign, mount to wall with double sided tape & siliconeDetails
non-structural sign, mount to wall with double sided tape & silicone | $2,500 | |
| Jun 5, 2012 | Completed final sign-off Nov 2012 | 6 Locksley Av | to erect non electric wall signDetails
to erect non electric wall sign | $2,500 | |
| Jun 5, 2012 | Completed final sign-off Nov 2012 | 6 Locksley Av | to erect non electric wall sign (car wash)Details
to erect non electric wall sign (car wash) | $2,500 | |
| Jun 5, 2012 | Completed final sign-off Nov 2012 | 8 Locksley Av | (3) non-structural, painted sign @ existing aluminum postDetails
(3) non-structural, painted sign @ existing aluminum post | $2,500 | |
| Jun 5, 2012 | Completed final sign-off Nov 2012 | 6 Locksley Av | to erect single faced wall sign (6 locksley)Details
to erect single faced wall sign (6 locksley) | $2,500 | |
| Jun 5, 2012 | Completed final sign-off Nov 2012 | 6 Locksley Av | replacement of existing building interior signage.Details
replacement of existing building interior signage. | $12,500 | |
| Jun 5, 2012 | Completed final sign-off Nov 2012 | 8 Locksley Av | non-structural, wall sign to be mounted with double sided tape & silicone (#7)Details
non-structural, wall sign to be mounted with double sided tape & silicone (#7) | $2,500 | |
| Jun 5, 2012 | Completed final sign-off Nov 2012 | 8 Locksley Av | erect non-electric single-faced wall sign.Details
erect non-electric single-faced wall sign. | $2,500 | |
| Jun 5, 2012 | Never finaled issued Jun 2012, no final | 8 Locksley Av | non-structural sign, mount to wall with black reflective vinyl, thick alum/painted silver.Details
non-structural sign, mount to wall with black reflective vinyl, thick alum/painted silver. | $2,500 | |
| Jun 5, 2012 | Completed final sign-off Nov 2012 | 6 Locksley Av | replace 3 standing sign copyDetails
replace 3 standing sign copy | $2,500 | |
| Jun 5, 2012 | Never finaled issued Jun 2012, no final | 6 Locksley Av | to erect non electric wall sign (maximum clearance 10'0")Details
to erect non electric wall sign (maximum clearance 10'0") | $2,500 | |
| May 9, 2012 | Completed final sign-off Jun 2012 | 6 Locksley Av | Regency General Contractors Inc | proposed maintenance room including new wall partition, door, window, outlets, switches.Details
proposed maintenance room including new wall partition, door, window, outlets, switches. | $2,000 |
| Apr 17, 2012 | Completed final sign-off Nov 2012 | 8 Locksley Av | replacement of existing building interior signage.Details
replacement of existing building interior signage. | $12,500 | |
| Apr 17, 2012 | Completed final sign-off Oct 2014 | 8 Locksley Av | corrective action for dbi notice of violation 201165747. the correction was to remove the break room and return it back to its original condition.Details
corrective action for dbi notice of violation 201165747. the correction was to remove the break room and return it back to its original condition. | $23,000 | |
| Mar 19, 2012 | Completed final sign-off Jan 2013 | 8 Locksley Av | Gammill Electric Inc | add 2 cogeneration modules to provide electrical power and hot water, includes 2 fsd's.Details
add 2 cogeneration modules to provide electrical power and hot water, includes 2 fsd's. | $387,000 |
| Aug 30, 2011 | Never finaled issued Aug 2011, no final | 8 Locksley Av | street spaceDetails
street space | ||
| Jul 28, 2011 | Never finaled issued Jul 2011, no final | 8 Locksley Av | street space permitDetails
street space permit | ||
| Jun 30, 2011 | Never finaled issued Jun 2011, no final | 8 Locksley Av | streetspaceDetails
streetspace | ||
| May 27, 2011 | Never finaled issued May 2011, no final | 8 Locksley Av | street spaceDetails
street space | ||
| Apr 19, 2011 | Expired or cancelled cancelled Jan 2026 | 8 Locksley Av | Avalon Bay Communities | to erect electrical signDetails
to erect electrical sign | $10,000 |
| Apr 19, 2011 | Expired or cancelled cancelled Jan 2026 | 6 Locksley Av | Avalon Bay Communities | to erect electrical signDetails
to erect electrical sign | $10,000 |
| Mar 31, 2011 | Never finaled issued Mar 2011, no final | 8 Locksley Av | street spaceDetails
street space | ||
| Feb 28, 2011 | Never finaled issued Feb 2011, no final | 8 Locksley Av | street space per app# m237847Details
street space per app# m237847 | ||
| Jan 25, 2011 | Never finaled issued Jan 2011, no final | 8 Locksley Av | street space permit (m234486)Details
street space permit (m234486) | ||
| Dec 27, 2010 | Never finaled issued Dec 2010, no final | 8 Locksley Av | street spaceDetails
street space | ||
| Dec 21, 2010 | Completed final sign-off Nov 2011 | 6 Locksley Av | Aeco Systems, Inc | fire alarm system replacement & upgrade to current codeDetails
fire alarm system replacement & upgrade to current code | $294,000 |
| Nov 23, 2010 | Never finaled issued Nov 2010, no final | 8 Locksley Av | street spaceDetails
street space | ||
| Nov 10, 2010 | Completed final sign-off Aug 2012 | 6 Locksley Av | hallway remodel all upper floors, drop a drywall ceiling, replace lights at (e) locations & add baseboards & door trim. no structural & no exterior work.Details
hallway remodel all upper floors, drop a drywall ceiling, replace lights at (e) locations & add baseboards & door trim. no structural & no exterior work. | $150,000 | |
| Nov 10, 2010 | Completed final sign-off Aug 2012 | 8 Locksley Av | hallway remodel all upper floors, drop a drywall ceiling, replace lights at (e) locations & add baseboards & door trim. remodel leasing office. no structural & no exterior work.Details
hallway remodel all upper floors, drop a drywall ceiling, replace lights at (e) locations & add baseboards & door trim. remodel leasing office. no structural & no exterior work. | $250,000 | |
| Oct 6, 2010 | Never finaled issued Apr 2011, no final | 6 Locksley Av | common area landscaping.Details
common area landscaping. | $80,000 | |
| Aug 31, 2010 | Completed final sign-off Dec 2011 | 8 Locksley Av | replacement of leaking exterior windows. 402 windows. no change to size or opening.Details
replacement of leaking exterior windows. 402 windows. no change to size or opening. | $400,000 | |
| Aug 31, 2010 | Completed final sign-off Dec 2011 | 6 Locksley Av | replacement of leaking exterior windows. 402 windows. no change to size or opening.Details
replacement of leaking exterior windows. 402 windows. no change to size or opening. | $400,000 | |
| Jun 29, 2010 | Never finaled issued Oct 2010, no final | 6 Locksley Av | renovation of kitchens & baths in all units. interior renovations. no structural.Details
renovation of kitchens & baths in all units. interior renovations. no structural. | $1,952,000 | |
| Jun 29, 2010 | Never finaled issued Oct 2010, no final | 8 Locksley Av | renovation of kitchens & baths in all units. interior renovations. no structural.Details
renovation of kitchens & baths in all units. interior renovations. no structural. | $1,936,000 | |
| May 14, 2010 | Completed final sign-off Sep 2010 | 6 Locksley Av | David Juricic Constructon | unit #2c: widen doorway @ bathroom. remove portion of hall closet. replace (e) shower & sink. field verify that there are no sprinklers in the unit...if there is submit sprinkler plan under separate permit.Details
unit #2c: widen doorway @ bathroom. remove portion of hall closet. replace (e) shower & sink. field verify that there are no sprinklers in the unit...if there is submit sprinkler plan under separate permit. | $8,500 |
| Dec 1, 2009 | Completed final sign-off Dec 2009 | 6 Locksley Av | David Juricic Constructon | apt 5c: replace tub with roll in shower, new haning sink and faucet, new shower valve, new tile on floors and walls, change door to 39" with no moving of walls. no structural, new lighting.Details
apt 5c: replace tub with roll in shower, new haning sink and faucet, new shower valve, new tile on floors and walls, change door to 39" with no moving of walls. no structural, new lighting. | $15,000 |
| Nov 13, 2008 | Completed final sign-off Jul 2009 | 6 Locksley Av | Transceive Communications Inc. | addition of 2 new fire rated walls to enclose existing telecommunications site, add two 2hour rated doors and installation of a vent (fan) on the penthouse.Details
addition of 2 new fire rated walls to enclose existing telecommunications site, add two 2hour rated doors and installation of a vent (fan) on the penthouse. | $5,000 |
| Oct 2, 2007 | Expired or cancelled cancelled Jan 2026 | 6 Locksley Av | addition of two new 2hr rated walls w/ 2hr rated doors to enclose existing pcs site, install one vent at penthouse.Details
addition of two new 2hr rated walls w/ 2hr rated doors to enclose existing pcs site, install one vent at penthouse. | $5,000 | |
| Jul 17, 2007 | Never finaled issued Apr 2008, no final | 6 Locksley Av | Triton Tower Inc | install one hour fire wall to provide separate in (e) equipment room between (e) elevator shaft (e) xm radio cabinet within the elevator shaft/utility room.Details
install one hour fire wall to provide separate in (e) equipment room between (e) elevator shaft (e) xm radio cabinet within the elevator shaft/utility room. | $12,000 |
| Apr 17, 2002 | Completed final sign-off Apr 2015 | 6 Locksley Av | Atc Tower Services Inc | install antenna,satellite dish, equipment cabinetDetails
install antenna,satellite dish, equipment cabinet | $20,000 |
| Sep 27, 2000 | Expired or cancelled expired Mar 2001 | 8 Locksley Av | Pacific Auxiliary Fire Alarm | repair of fire alarm system, replacement of smoke detectors, temp. facp-100Details
repair of fire alarm system, replacement of smoke detectors, temp. facp-100 | $11,754 |
| Sep 11, 2000 | Completed final sign-off Dec 2000 | 6 Locksley Av | Security Glass Company | remve ex frameless glass door then replace new store front entry doors aluminum frame w/ panic hardaDetails
remve ex frameless glass door then replace new store front entry doors aluminum frame w/ panic harda | $28,438 |
Find contractors for work like this