- 0 permits filed
14 permits since 2000: 6 completed, 7 never finaled, 1 expired or cancelled.
Of the 7 never-finaled permits, 5 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 14, 2018 | Never finaled issued Aug 2018, no final | 8 Locksley Av | kitchen & bathroom remodel in unit 5g - in kind. no moving walls or doors, same location remodel.Details
kitchen & bathroom remodel in unit 5g - in kind. no moving walls or doors, same location remodel. | $25,000 |
| May 14, 2018 | Completed final sign-off Jul 2018 | 8 Locksley Av | unit #3d: kitchen and (1) bathroom remodel. in kind. same location. no moving of walls or doorsDetails
unit #3d: kitchen and (1) bathroom remodel. in kind. same location. no moving of walls or doors | $20,000 |
| May 14, 2018 | Never finaled issued May 2018, no final | 6 Locksley Av | unit #5f: kitchen and bathroom remodel. in kind. same location. no moving of walls or doorsDetails
unit #5f: kitchen and bathroom remodel. in kind. same location. no moving of walls or doors | $20,000 |
| Feb 15, 2018 | Completed final sign-off Mar 2018 | 8 Locksley Av | kitchen and 1 bathroom remodel. replacing cabinets and sinks and replacing toilet.Details
kitchen and 1 bathroom remodel. replacing cabinets and sinks and replacing toilet. | $25,000 |
| Feb 15, 2018 | Never finaled issued Feb 2018, no final | 6 Locksley Av | revision to 2010006295575 to delete work that was previously approved for kitchne and bath remodel. work performed only 1g,2b,2k,2g,3e,3f,4g,4h,6l,7c,9b,10d,10jDetails
revision to 2010006295575 to delete work that was previously approved for kitchne and bath remodel. work performed only 1g,2b,2k,2g,3e,3f,4g,4h,6l,7c,9b,10d,10j | |
| Feb 15, 2018 | Never finaled issued Feb 2018, no final | 8 Locksley Av | revision to 201006295577 to delete work that was previously approved, kitchen and bath remodel. work preformed only in: 1g,4b,4h,5b,5d,5e,8b,9j,10dDetails
revision to 201006295577 to delete work that was previously approved, kitchen and bath remodel. work preformed only in: 1g,4b,4h,5b,5d,5e,8b,9j,10d | |
| Sep 15, 2017 | Never finaled issued Sep 2017, no final | 6 Locksley Av | to obtain/renew bpa#201006295575 for renovation of work in unit #9b; for work approved under pa#201006295575, all work is completeDetails
to obtain/renew bpa#201006295575 for renovation of work in unit #9b; for work approved under pa#201006295575, all work is complete | $25,000 |
| Jun 22, 2015 | Never finaled issued Jun 2015, no final | 8 Locksley Av | to renew pa# 201006295577 for remainder of work.Details
to renew pa# 201006295577 for remainder of work. | $100,000 |
| Jun 22, 2015 | Never finaled issued Nov 2015, no final | 6 Locksley Av | to renew pa# 201006295575 for remainder of work.Details
to renew pa# 201006295575 for remainder of work. | $100,000 |
| Mar 31, 2014 | Completed final sign-off May 2014 | 35 Lillian St | replace dry rot beam aproximately 7'-0" long at front balcony of second floor. no change of front elevation. work in building 10, unit 2 only.Details
replace dry rot beam aproximately 7'-0" long at front balcony of second floor. no change of front elevation. work in building 10, unit 2 only. | $3,000 |
| Dec 16, 2013 | Completed final sign-off Jan 2014 | 19 Garlington Ct | remove & replace damage stair treads on 6 stairwells, visable to street, replace in kind and repair less than 50%.Details
remove & replace damage stair treads on 6 stairwells, visable to street, replace in kind and repair less than 50%. | $2,532 |
| Feb 21, 2013 | Completed final sign-off Apr 2013 | 2000 Post St | construct 20 storage lockers in parking garage at 2 locations. add a total of 11 on steiner street side and 9 on post street side. see plans for construction detail.Details
construct 20 storage lockers in parking garage at 2 locations. add a total of 11 on steiner street side and 9 on post street side. see plans for construction detail. | $10,000 |
| Aug 9, 2010 | Completed final sign-off Sep 2010 | 1042 Oakdale Av | aprtment gutted by fire. all structure is ok. no struc work. 5/8 gyp bd type x at ceiling. prop line wall otherwise 1/2 " need to fully replace sheetrock. plumbing,elec,hvac systems. paint new cabinets,fixtures. replace all windows in kind. u-factor 0.40 or less per connection noticeDetails
aprtment gutted by fire. all structure is ok. no struc work. 5/8 gyp bd type x at ceiling. prop line wall otherwise 1/2 " need to fully replace sheetrock. plumbing,elec,hvac systems. paint new cabinets,fixtures. replace all windows in kind. u-factor 0.40 or less per connection notice | $175,000 |
| Nov 19, 2009 | Expired or cancelled expired Apr 2013 | 30 Whitfield Ct | unit #1-unit damaged by fire, replace insulation, drywall, cabinets & floor coverings. bedrooom windows & others entry door & others. replace in kindDetails
unit #1-unit damaged by fire, replace insulation, drywall, cabinets & floor coverings. bedrooom windows & others entry door & others. replace in kind | $100,000 |