Urban Energy
- Based in
- San Rafael
- On San Francisco permits
- Dec 2025 to Sep 2026
- Last 24 months
- 5 permits filed
5 permits since 2000: 3 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 28, 2026 | In progress issued Sep 2026 | 45 Lansing St | install 29 new ev chargers in the parking garage. located in (b,b1 and b2 parking levels)Details
install 29 new ev chargers in the parking garage. located in (b,b1 and b2 parking levels) | $100,135 |
| Sep 28, 2026 | In progress filed Sep 2026, not yet issued | 1450 Franklin St | installation of 22 ev chargers in private parking garage. parking stalls deeded to condo owners. l2 charges only.Details
installation of 22 ev chargers in private parking garage. parking stalls deeded to condo owners. l2 charges only. | $85,250 |
| Jun 12, 2026 | Completed final sign-off Jul 2026 | 2125 Bryant St | supply & install 25 evercharge level 2 ev chargers. install (1) new 200a panel at lower level. work only done in parking garage (e) area.Details
supply & install 25 evercharge level 2 ev chargers. install (1) new 200a panel at lower level. work only done in parking garage (e) area. | $83,550 |
| May 14, 2026 | Completed final sign-off Jun 2026 | 1221 Jones St | installation of (10) ev chargers in basement of building, installation of new 400 amp electrical panel, non public space, deeded parking spots.Details
installation of (10) ev chargers in basement of building, installation of new 400 amp electrical panel, non public space, deeded parking spots. | $41,750 |
| Dec 18, 2025 | Completed final sign-off Mar 2026 | 68 Rosewood Dr | solar permit: installing 14 solar pv modules, 440 watts per module, total no. of rating 5.72 kw. mounted: roof, ballasted: n, including 1 energy storage unit, with 13 kwh each in capacity, ess units will not be closer than 3 feet | installation of solar and battery syDetails
solar permit: installing 14 solar pv modules, 440 watts per module, total no. of rating 5.72 kw. mounted: roof, ballasted: n, including 1 energy storage unit, with 13 kwh each in capacity, ess units will not be closer than 3 feet | installation of solar and battery sy |