Block 0220, lot 036
1221 Jones St
- City’s use
- Multi-Family Residential
- Built
- 1971
- Stories
- 12
- Units
- 72
- Rooms
- 80 bathrooms
- Building
- 75,062 sq ft
- Lot
- 12,553 sq ft
- Zoning
- RM4
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
65 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 14, 2026 | Completed final sign-off Jun 2026 | 1221 Jones St | Urban Energy | installation of (10) ev chargers in basement of building, installation of new 400 amp electrical panel, non public space, deeded parking spots.Details
installation of (10) ev chargers in basement of building, installation of new 400 amp electrical panel, non public space, deeded parking spots. | $41,750 |
| Apr 16, 2025 | Completed final sign-off May 2025 | 1221 Jones St | Camp Roofing Ltd Dba Camp Construction | 14/fl-penthouse-revision 202502281336 to include interior work to (e) 1340sf 2 bedroom unit to inlcude kitchen and bathroom remodel and install washer and dryer hookups.Details
14/fl-penthouse-revision 202502281336 to include interior work to (e) 1340sf 2 bedroom unit to inlcude kitchen and bathroom remodel and install washer and dryer hookups. | $84,000 |
| Mar 21, 2025 | Completed final sign-off Apr 2025 | 1221 Jones St | Commercial Fire Protection Llc | to verify sound pressure levels in living areas and dwelling unitsDetails
to verify sound pressure levels in living areas and dwelling units | $20 |
| Feb 28, 2025 | Completed final sign-off May 2025 | 1221 Jones St | Camp Roofing Ltd Dba Camp Construction | unit phdu1: one kitchen & one and a half bathrooms renovation like for like, tub to remain 1/2 bathDetails
unit phdu1: one kitchen & one and a half bathrooms renovation like for like, tub to remain 1/2 bath | $56,000 |
| Oct 3, 2024 | Completed final sign-off Apr 2025 | 1221 Jones St | Commercial Fire Protection Llc | update (e) fire alarm system to comply with sleeping area notification requirements by adding horns to the living rooms.Details
update (e) fire alarm system to comply with sleeping area notification requirements by adding horns to the living rooms. | $159,000 |
| Nov 29, 2023 | Completed final sign-off Oct 2024 | 1221 Jones St | Executive Coatings & Contracting Llc | repair rolled asphalt on level -3 roof - to comply w/ nov# 202301262.Details
repair rolled asphalt on level -3 roof - to comply w/ nov# 202301262. | $2,000 |
| Dec 14, 2022 | Never finaled filed Dec 2022, never issued | 1221 Jones St | Pyro-Comm Systems, Inc. | cDetails
c | $5,000 |
| Oct 13, 2022 | Completed final sign-off Sep 2023 | 1221 Jones St | Ge Construction Contractors Inc | revision to pa# 202203180350 for the remediation work in (e) units 4a, 7a, 7b, 7g, 8g, 9a, pha1, pha2 and phc2. adjacent to approved work areas to facilitate plumbing connections. no change in (e) number of units, area or layout. no change in occupancy or exit path.Details
revision to pa# 202203180350 for the remediation work in (e) units 4a, 7a, 7b, 7g, 8g, 9a, pha1, pha2 and phc2. adjacent to approved work areas to facilitate plumbing connections. no change in (e) number of units, area or layout. no change in occupancy or exit path. | $3,500 |
| Sep 9, 2022 | Completed final sign-off Oct 2023 | 1221 Jones St | Van Acker Const Assoc Inc | penthouse c3: reconfigure int non structural partition walls. remodel 2 1/2 baths, replace all plumbing, appliances, int lighting, int doorsDetails
penthouse c3: reconfigure int non structural partition walls. remodel 2 1/2 baths, replace all plumbing, appliances, int lighting, int doors | $100,000 |
| Sep 6, 2022 | Expired or cancelled cancelled Feb 2025 | 1221 Jones St | Pyro-Comm Systems, Inc. | this is an addition to (e) fire alarm system. pyro-comm to provide & install the following equipment for the 18 living units remodel. 35 mini horns - wall mount - new devices in bedrooms. 18 mini horns - wall mount replace (e) with (n) in the living rooms. ref pa#2022-0318-0350.Details
this is an addition to (e) fire alarm system. pyro-comm to provide & install the following equipment for the 18 living units remodel. 35 mini horns - wall mount - new devices in bedrooms. 18 mini horns - wall mount replace (e) with (n) in the living rooms. ref pa#2022-0318-0350. | $30,000 |
| Mar 18, 2022 | Completed final sign-off Sep 2023 | 1221 Jones St | Ge Construction Contractors Inc | revision to pa# 202106293456. interior alterations to 18 units. 8a,10a,8b,10g,10b,9g,9b,5a,6a,4g,3g,10e,7e,6e,4e,phb1,phc1,phb2. work incl finishes, ltg, elect, plumb. no change to common area, exits, pot. no increase in units or area. remediate to comply w/nov 202287842 at unit 5b. mech under sep.Details
revision to pa# 202106293456. interior alterations to 18 units. 8a,10a,8b,10g,10b,9g,9b,5a,6a,4g,3g,10e,7e,6e,4e,phb1,phc1,phb2. work incl finishes, ltg, elect, plumb. no change to common area, exits, pot. no increase in units or area. remediate to comply w/nov 202287842 at unit 5b. mech under sep. | $75,000 |
| Oct 5, 2021 | Never finaled issued Oct 2021, no final | 1221 Jones St | Pyro-Comm Systems, Inc. | voluntary panel replacement to extg fire alarm system. 1 facu, 1 gsm, 1 mini-monitor module.Details
voluntary panel replacement to extg fire alarm system. 1 facu, 1 gsm, 1 mini-monitor module. | $40,000 |
| Jun 29, 2021 | Completed final sign-off Sep 2023 | 1221 Jones St | Ge Construction Contractors Inc | unit# 8a,10a,8b,10g,10b,9g,7g,4g,3g,10e,7e,6e,4e,phb1,phbc1 & phb2. interior remodel to 16 units-partition,finishes,lighting,plumbing fixture replacement.no change to common area or exterior path. no increase in area & exterior workDetails
unit# 8a,10a,8b,10g,10b,9g,7g,4g,3g,10e,7e,6e,4e,phb1,phbc1 & phb2. interior remodel to 16 units-partition,finishes,lighting,plumbing fixture replacement.no change to common area or exterior path. no increase in area & exterior work | $200,000 |
| Feb 4, 2020 | Never finaled issued Feb 2020, no final | 1221 Jones St | Everest Waterproofing & Restoration Inc. | repair concrete balcony slabs as needed n/a maherDetails
repair concrete balcony slabs as needed n/a maher | $25,000 |
| Jan 16, 2020 | Never finaled issued Jan 2020, no final | 1221 Jones St | street spaceDetails
street space | ||
| Dec 10, 2019 | Never finaled issued Dec 2019, no final | 1221 Jones St | street spaceDetails
street space | ||
| Nov 12, 2019 | Never finaled issued Nov 2019, no final | 1221 Jones St | street spaceDetails
street space | ||
| Oct 9, 2019 | Never finaled issued Oct 2019, no final | 1221 Jones St | street space.Details
street space. | ||
| Sep 3, 2019 | Never finaled issued Sep 2019, no final | 1221 Jones St | street spaceDetails
street space | ||
| Aug 8, 2019 | Never finaled issued Aug 2019, no final | 1221 Jones St | street spaceDetails
street space | ||
| Oct 16, 2018 | Completed final sign-off Jan 2019 | 1221 Jones St | S & H Renovations | unit 7f: replacing fixtures & finishes, 1 kitchen, 2 bathrooms, 1 powder room, paint, flooringDetails
unit 7f: replacing fixtures & finishes, 1 kitchen, 2 bathrooms, 1 powder room, paint, flooring | $48,000 |
| Feb 29, 2016 | Completed final sign-off May 2016 | 1221 Jones St | S & H Renovations | fixtures & finishes replacement at penthouse unit, including kitchen & 2 bathrooms; maher n/aDetails
fixtures & finishes replacement at penthouse unit, including kitchen & 2 bathrooms; maher n/a | $90,000 |
| Mar 11, 2015 | Completed final sign-off May 2015 | 1221 Jones St | S & H Renovations | unit 6f & 8f: refurbishing finishes, cabinets, appliances & floorings. no walls moved, removed or added. all existing layouts to remain unchanged, shower valve replacement in bathrooms.Details
unit 6f & 8f: refurbishing finishes, cabinets, appliances & floorings. no walls moved, removed or added. all existing layouts to remain unchanged, shower valve replacement in bathrooms. | $45,000 |
| Jun 13, 2014 | Never finaled issued Jun 2014, no final | 1221 Jones St | Aeco Systems, Inc | modification to existing fire alarm system consisting of relocation of (3) devices. t.i. pa#201401287245Details
modification to existing fire alarm system consisting of relocation of (3) devices. t.i. pa#201401287245 | $5,000 |
| Jun 5, 2014 | Completed final sign-off Aug 2014 | 1221 Jones St | Aquamatic Fire Protection | add (3) relocate (9) due to tenant improvement @ mezzanine level; reference ti 201401287245; compliance with maher ord 155-13 not required.Details
add (3) relocate (9) due to tenant improvement @ mezzanine level; reference ti 201401287245; compliance with maher ord 155-13 not required. | $7,500 |
| Jan 28, 2014 | Completed final sign-off Aug 2014 | 1221 Jones St | Johnstone Moyer Inc | replace extg lounge casework, aplliances and finishes. new entry to fitness center. enlarge house keeping, move interior partition and add t-bar ceiling. replace planters and add new non-combustable concrete pavers in atrium. n/a for the maher ordinance #155-13Details
replace extg lounge casework, aplliances and finishes. new entry to fitness center. enlarge house keeping, move interior partition and add t-bar ceiling. replace planters and add new non-combustable concrete pavers in atrium. n/a for the maher ordinance #155-13 | $75,000 |
| Dec 30, 2011 | Completed final sign-off Aug 2012 | 1221 Jones St | Scott Architectual Graphics, Inc | new evacuation signs on all floors (47 plaques)Details
new evacuation signs on all floors (47 plaques) | $4,700 |
| Nov 4, 2011 | Completed final sign-off Dec 2011 | 1221 Jones St | Eagle Ridge Construction And Roofing | #7a - kitchen remodel, electrical upgrade, no removal or opening of existing wall, install of new kitchen cabinets.Details
#7a - kitchen remodel, electrical upgrade, no removal or opening of existing wall, install of new kitchen cabinets. | $14,000 |
| Jan 5, 2011 | Completed final sign-off Jan 2011 | 1221 Jones St | Mec Construction | ph a3: install washer and dryer stackable unitDetails
ph a3: install washer and dryer stackable unit | $2,500 |
| Nov 18, 2010 | Never finaled issued Nov 2010, no final | 1221 Jones St | street space permitDetails
street space permit | ||
| Sep 8, 2010 | Never finaled issued Sep 2010, no final | 1221 Jones St | street spaceDetails
street space | ||
| Jul 7, 2010 | Completed final sign-off Feb 2011 | 1221 Jones St | Johnstone Moyer Inc | (n) canopy over existing entry to residential apartment buildingDetails
(n) canopy over existing entry to residential apartment building | $11,000 |
| Jun 9, 2010 | Completed final sign-off Jan 2011 | 1221 Jones St | Aegis Fire Systems Technology Inc | lobby ti - 20 total heads. added 18 pendents, relocated 2 pendents.Details
lobby ti - 20 total heads. added 18 pendents, relocated 2 pendents. | $6,250 |
| May 26, 2010 | Never finaled issued May 2010, no final | 1221 Jones St | street space permitDetails
street space permit | ||
| Mar 24, 2010 | Completed final sign-off Feb 2011 | 1221 Jones St | Johnstone Moyer Inc | remodel existing residential lobby, new window walls, interior finishes & lighting. fire alarm & sprinkler under separate permit.Details
remodel existing residential lobby, new window walls, interior finishes & lighting. fire alarm & sprinkler under separate permit. | $115,000 |
| Mar 19, 2010 | Completed final sign-off Jan 2011 | 1221 Jones St | Johnstone Moyer Inc | new lighting in corridor & new 1 hour rated infill at corridorDetails
new lighting in corridor & new 1 hour rated infill at corridor | $17,500 |
| Apr 2, 2009 | Completed final sign-off Jul 2009 | 1221 Jones St | C 3 Remodel Inc | penthouse a1: kitchen and bath remodel penthouse a1 - kitchen, 2 bath and 1/2 bath. upgrade to kitchen - new cabinets, cou tertops and the floor. upgrade to bathrooms, new fixtures, tile, counters and patch and paint walls and ceiling - ph a1, provide min. 50% of kitchen light walls in fluorescentDetails
penthouse a1: kitchen and bath remodel penthouse a1 - kitchen, 2 bath and 1/2 bath. upgrade to kitchen - new cabinets, cou tertops and the floor. upgrade to bathrooms, new fixtures, tile, counters and patch and paint walls and ceiling - ph a1, provide min. 50% of kitchen light walls in fluorescent | $25,000 |
| Jul 23, 2008 | Completed final sign-off Oct 2008 | 1221 Jones St | C 3 Remodel Inc | kitchen and bath remodel at unit 4d. 1 kitchen, 1 bath, upgrade to kitchen, new cabinets, countertops and tile floor. upgrade to bathroom new fixtures, tile, counters and patch and paint walls and ceiling unit 4d.Details
kitchen and bath remodel at unit 4d. 1 kitchen, 1 bath, upgrade to kitchen, new cabinets, countertops and tile floor. upgrade to bathroom new fixtures, tile, counters and patch and paint walls and ceiling unit 4d. | $25,000 |
| Jul 18, 2008 | Completed final sign-off Sep 2008 | 1221 Jones St | C 3 Remodel Inc | floor 9th unit 9a - remodel kitchen & baths (1 kitchen, 1 bath & 1/2 bath). new cabinets, countertops & tile floor at kitchen, new fixtures, tile, counters, patch, paint walls & ceilings at baths.Details
floor 9th unit 9a - remodel kitchen & baths (1 kitchen, 1 bath & 1/2 bath). new cabinets, countertops & tile floor at kitchen, new fixtures, tile, counters, patch, paint walls & ceilings at baths. | $25,000 |
| Apr 7, 2008 | Completed final sign-off Jun 2008 | 1221 Jones St | C 3 Remodel Inc | remodel work on unit#10b. demo (e) cabinets and countertops, appliances and fixtures. demo the patch and paint walls and ceilings. install new cabinets add countertops. install new fixtures and appliances. 1 kitchen, 1 bath. no change in windows or doors.Details
remodel work on unit#10b. demo (e) cabinets and countertops, appliances and fixtures. demo the patch and paint walls and ceilings. install new cabinets add countertops. install new fixtures and appliances. 1 kitchen, 1 bath. no change in windows or doors. | $16,000 |
| Mar 5, 2008 | Completed final sign-off Apr 2008 | 1221 Jones St | unit# c3. renew pa# 9706517 for final inspection only.Details
unit# c3. renew pa# 9706517 for final inspection only. | ||
| Mar 4, 2008 | Completed final sign-off Apr 2008 | 1221 Jones St | C 3 Remodel Inc | unit #3d, 6d, 7e: kitchen & bathroom remodel to comply with n.o.v. 200672330. patch & paint walls & floors. remove & replace appliances and fixtures, new cabinets and tile.Details
unit #3d, 6d, 7e: kitchen & bathroom remodel to comply with n.o.v. 200672330. patch & paint walls & floors. remove & replace appliances and fixtures, new cabinets and tile. | $48,000 |
| Feb 11, 2008 | Never finaled issued Feb 2008, no final | 1221 Jones St | street space permit only.Details
street space permit only. | ||
| Jan 16, 2008 | Expired or cancelled cancelled Jan 2026 | 1221 Jones St | remodel of 2 kitchens, 2 bathrooms-demo (e) cabinets, countertops, tile and fixtures. upgrade cabinets, countertops, tile, fixtures and appliances. patch and paint walls and ceilingsDetails
remodel of 2 kitchens, 2 bathrooms-demo (e) cabinets, countertops, tile and fixtures. upgrade cabinets, countertops, tile, fixtures and appliances. patch and paint walls and ceilings | ||
| Jan 16, 2008 | Completed final sign-off Apr 2008 | 1221 Jones St | C 3 Remodel Inc | work on unit#7g & #5e. remodel of (2) kitchens, (2) bathrooms. demo existing cabinets, countertops, tile and fixtures, upgrade cabinets, countertops, tile fixtures and appliances patch and paint walls and ceilings.Details
work on unit#7g & #5e. remodel of (2) kitchens, (2) bathrooms. demo existing cabinets, countertops, tile and fixtures, upgrade cabinets, countertops, tile fixtures and appliances patch and paint walls and ceilings. | $32,000 |
| Jan 4, 2008 | Completed final sign-off Apr 2008 | 1221 Jones St | C 3 Remodel Inc | work @ unit# 10g only. 1 kitchen , 1 bathroom remodel. upgrade to kitchen. new cabinets, countertops, & tile. remodel only. no changes to location, size or shape. upgrade to bathroom. new fixtures, tile & countertops. patch & paint walls & ceiling. 50% of kitchen wattage be fluorescent.Details
work @ unit# 10g only. 1 kitchen , 1 bathroom remodel. upgrade to kitchen. new cabinets, countertops, & tile. remodel only. no changes to location, size or shape. upgrade to bathroom. new fixtures, tile & countertops. patch & paint walls & ceiling. 50% of kitchen wattage be fluorescent. | $25,000 |
| Dec 5, 2007 | Never finaled issued Dec 2007, no final | 1221 Jones St | street space permitDetails
street space permit | ||
| Oct 25, 2007 | Expired or cancelled expired Mar 2008 | 1221 Jones St | C 3 Remodel Inc | unit a2, d3, 5b, and 4g - to renew for final permit # 200612210372, 200612210367, 200612210371, 200612210368. complaint #200674029 (ces), 200672330 (pid).Details
unit a2, d3, 5b, and 4g - to renew for final permit # 200612210372, 200612210367, 200612210371, 200612210368. complaint #200674029 (ces), 200672330 (pid). | |
| Oct 25, 2007 | Completed final sign-off Apr 2008 | 1221 Jones St | C 3 Remodel Inc | units 3c, 4c, 4d, 4f, 5f, 7c, 7d, 9b, 9g, 10a, c2 - correct violation defined by nov#200703142 remodel two units without permit, open walls as necessary, correct violations. 11 vilations per this nov number 200674029, 200672330, 200703142. see attached.Details
units 3c, 4c, 4d, 4f, 5f, 7c, 7d, 9b, 9g, 10a, c2 - correct violation defined by nov#200703142 remodel two units without permit, open walls as necessary, correct violations. 11 vilations per this nov number 200674029, 200672330, 200703142. see attached. | $160,000 |
| Oct 25, 2007 | Expired or cancelled expired Jun 2012 | 1221 Jones St | C 3 Remodel Inc | unit b2 - to renew building permit pa#200612210369 for remaining work.Details
unit b2 - to renew building permit pa#200612210369 for remaining work. | $11,000 |
| Aug 23, 2007 | Never finaled filed Aug 2007, never issued | 1221 Jones St | Mec Construction | open walls so inspectors can verify electrical. corrections to nov# 200703142 & 200703142 at 11th and 14th floors (penthouse). patch and paintDetails
open walls so inspectors can verify electrical. corrections to nov# 200703142 & 200703142 at 11th and 14th floors (penthouse). patch and paint | $12,500 |
| Aug 8, 2007 | Expired or cancelled expired Mar 2008 | 1221 Jones St | A-B Construction Dba Amer Braz Const. | none structural-replace kitchen cabinets, counter tops, gfi's, p trap-apartment #10e. installation to comply with title 24 energy codes.Details
none structural-replace kitchen cabinets, counter tops, gfi's, p trap-apartment #10e. installation to comply with title 24 energy codes. | $7,000 |
| Apr 17, 2007 | Expired or cancelled expired Mar 2008 | 1221 Jones St | A-B Construction Dba Amer Braz Const. | work @ unit# 8d. all existing. none structural. new kitchen cabinets & countertop. bathroom countertop.provide 50% of kitchen light watts in fluorescent. install fluorescent lights. 100% fluorescent lights or o.s in bathroom.Details
work @ unit# 8d. all existing. none structural. new kitchen cabinets & countertop. bathroom countertop.provide 50% of kitchen light watts in fluorescent. install fluorescent lights. 100% fluorescent lights or o.s in bathroom. | $8,000 |
| Mar 6, 2007 | Expired or cancelled expired Mar 2008 | 1221 Jones St | revision to kitchen remodel permits per nov#200674029 untis #3a,3g,4g,5b, ph-a2,ph-d3, ph-d4.Details
revision to kitchen remodel permits per nov#200674029 untis #3a,3g,4g,5b, ph-a2,ph-d3, ph-d4. | $14,000 | |
| Mar 6, 2007 | Expired or cancelled expired Mar 2008 | 1221 Jones St | revision to kitchen remodel permits per nov#200612190098. untis#4bDetails
revision to kitchen remodel permits per nov#200612190098. untis#4b | $2,000 | |
| Jan 19, 2007 | Expired or cancelled expired Mar 2008 | 1221 Jones St | comply with 200674029. new sink, faucets, gfi change new contertop kitchen & bath, cabinets to remain. all existing kitchens plumbing & electrical.Details
comply with 200674029. new sink, faucets, gfi change new contertop kitchen & bath, cabinets to remain. all existing kitchens plumbing & electrical. | $12,000 | |
| Dec 21, 2006 | Completed final sign-off Feb 2008 | 1221 Jones St | On-Site Maintenance | kitchen and bath remodel for unit 5-b, address nov 200674029, no other workDetails
kitchen and bath remodel for unit 5-b, address nov 200674029, no other work | $20,000 |
| Dec 21, 2006 | Completed final sign-off Feb 2008 | 1221 Jones St | On-Site Maintenance | kitchen and bath remodel for units a2 to address 200674029. no other work. new cabinets,countertops,fixtures, plumbingDetails
kitchen and bath remodel for units a2 to address 200674029. no other work. new cabinets,countertops,fixtures, plumbing | $20,000 |
| Dec 21, 2006 | Completed final sign-off Aug 2007 | 1221 Jones St | On-Site Maintenance | kitchen and bath remodel for unit 3a, address nov 200674029, no other workDetails
kitchen and bath remodel for unit 3a, address nov 200674029, no other work | $20,000 |
| Dec 21, 2006 | Completed final sign-off Aug 2007 | 1221 Jones St | On-Site Maintenance | kitchen and bath remodel for unit 3 g, address nov 200674029, no other workDetails
kitchen and bath remodel for unit 3 g, address nov 200674029, no other work | $20,000 |
| Dec 21, 2006 | Completed final sign-off Feb 2008 | 1221 Jones St | On-Site Maintenance | kitchen and bath remodel for unit d-3, address nov 200674029, no other workDetails
kitchen and bath remodel for unit d-3, address nov 200674029, no other work | $20,000 |
| Dec 21, 2006 | Completed final sign-off Aug 2007 | 1221 Jones St | On-Site Maintenance | kitchen and bath remodel for unit d4, address nov 200674029, no other workDetails
kitchen and bath remodel for unit d4, address nov 200674029, no other work | $20,000 |
| Dec 21, 2006 | Expired or cancelled expired Mar 2008 | 1221 Jones St | On-Site Maintenance | kitchen and bath remodel for unit b2 , address nov 200674029, no other workDetails
kitchen and bath remodel for unit b2 , address nov 200674029, no other work | $20,000 |
| Dec 21, 2006 | Completed final sign-off Feb 2008 | 1221 Jones St | On-Site Maintenance | kitchen and bath remodel for unit 4g, address nov 200674029,Details
kitchen and bath remodel for unit 4g, address nov 200674029, | $20,000 |
| Dec 19, 2006 | Expired or cancelled expired Mar 2008 | 1221 Jones St | none structural all existing elec and plumb 3e kitchen counter top 4b new cabinets (kitchen) @ top 5a kitchen cabinets and counter top 8c new kitchen counter top b1 new kitchen cabinets counter top comply with n/s 200684994 and 200672279Details
none structural all existing elec and plumb 3e kitchen counter top 4b new cabinets (kitchen) @ top 5a kitchen cabinets and counter top 8c new kitchen counter top b1 new kitchen cabinets counter top comply with n/s 200684994 and 200672279 | $36,800 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.