Suzette Smith
- License
- C30980
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- Suzette Smith Inc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2022 to Oct 2026
17 permits since 2000 (architect on 17 permits): 4 completed, 11 in progress, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Van Acker Const Assoc Inc (6), Fma Builders (5), C A Mc Kee Construction (3), Arrow Builders Inc (2), Cello & Maudru Construction Co Inc (2), Gar Construction Inc (2), Dollard Construction Inc., Matarozzi/Pelsinger Builders Inc.
- Engineers
- Jillian Van Enckevort (5), Abraham Stallcup, Adam Azofeifa, Kris Wallace Johnson, Mustafa Jibat, Nikica Favretto
- Authorized agents
- Peter Lau
Where they worked
- Single-family 13
- Multi-family (2-family, apartments) 2
- Commercial 2
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 14, 2026 | In progress issued Oct 2026 | 225 Locust St | Arrow Builders Inc | revision to pa#202510177634: update arch with (n) storage room, full bath & mudroom, reconfigure kitchen & pantry on 1/f, remodel primary bath (n) laundry on 2/f, (n) dumbwaiter connecting basement, 1/f & 2/f, & modified window openings at rear of (e) 2/f.Details
revision to pa#202510177634: update arch with (n) storage room, full bath & mudroom, reconfigure kitchen & pantry on 1/f, remodel primary bath (n) laundry on 2/f, (n) dumbwaiter connecting basement, 1/f & 2/f, & modified window openings at rear of (e) 2/f. | $7,500 |
| Jun 1, 2026 | In progress filed Jun 2026, not yet issued | 2828 Vallejo St | Van Acker Const Assoc Inc | rev to 202406063863.reconfig intf framing.replace extr wdws and doors;roof tiles and wood siding.upgrade mep.r/r elevator shaft/equipment and extend basement level; remove 2-story addition located on w/s bldg.build new 2-story addition in place 992sf).r/r (e) brick retaining wall on e/s of drwy.Details
rev to 202406063863.reconfig intf framing.replace extr wdws and doors;roof tiles and wood siding.upgrade mep.r/r elevator shaft/equipment and extend basement level; remove 2-story addition located on w/s bldg.build new 2-story addition in place 992sf).r/r (e) brick retaining wall on e/s of drwy. | |
| Mar 11, 2026 | In progress issued Jun 2026 | 2440 Pacific Av | C A Mc Kee Construction | renovate primary suite | $250,000 |
| Jan 5, 2026 | In progress issued May 2026 | 3898 Washington St | Cello & Maudru Construction Co Inc | reconfigure interior framing. excavate partial basement for 15" lowering of flr.add elevator.remodel exterior of residence:(n)dormer window @ elevator overrun.replacement in-kind 2 stained glass windows,(n) elect panel,(n) skylight.waterproofing:repair & replace wood exterior cladding,composite...Details
reconfigure interior framing. excavate partial basement for 15" lowering of flr.add elevator.remodel exterior of residence:(n)dormer window @ elevator overrun.replacement in-kind 2 stained glass windows,(n) elect panel,(n) skylight.waterproofing:repair & replace wood exterior cladding,composite... | $6,000,000 |
| Dec 12, 2025 | In progress issued Dec 2025 | 2440 Pacific Av | C A Mc Kee Construction | 1/fl- (n) ice maker and undercounter refrigerator at family lounge and electric outlet of kitchen. replace 2 refrigators and faucet at kitchen. replace sink and toilet at powder. floor 2 replace toilet at master wc. floor 3 replace 2 toilets at baths. replace wall to wall carpet. repair andDetails
1/fl- (n) ice maker and undercounter refrigerator at family lounge and electric outlet of kitchen. replace 2 refrigators and faucet at kitchen. replace sink and toilet at powder. floor 2 replace toilet at master wc. floor 3 replace 2 toilets at baths. replace wall to wall carpet. repair and | $250,000 |
| Oct 17, 2025 | In progress issued Dec 2025 | 225 Locust St | Arrow Builders Inc, Matarozzi/Pelsinger Builders Inc., Dollard Construction Inc. | interior remodel including new mud room at basement, remodel (e) kitchen and pantry on 1st flr, remodel (e) primary suite and new laundry at 2nd flr, new dubwaiter connecting basement, 1st, and 2nd flrs, modified window opening at rear of (e) 2nd flr.Details
interior remodel including new mud room at basement, remodel (e) kitchen and pantry on 1st flr, remodel (e) primary suite and new laundry at 2nd flr, new dubwaiter connecting basement, 1st, and 2nd flrs, modified window opening at rear of (e) 2nd flr. | $500,000 |
| Jul 24, 2025 | In progress issued Oct 2025 | 3898 Washington St | Cello & Maudru Construction Co Inc | exterior remodel of residence; replace in-kind; (3) stained glass windows; repair/replace of painted wood exterior cladding; composite shingle roofing at pitched roof, cap sheet roofing at low-slope roof and wood windowsDetails
exterior remodel of residence; replace in-kind; (3) stained glass windows; repair/replace of painted wood exterior cladding; composite shingle roofing at pitched roof, cap sheet roofing at low-slope roof and wood windows | $650,000 |
| Jun 6, 2025 | In progress issued Jun 2025 | 2856 Vallejo St | Fma Builders | document underpinning of garage foundation along property line shared with 2828 vallejo st for regrading of driveway and landscaping at 2828 vallejo st. remove and replace exterior wood framed wall, exterior sheathing, waterproofing and wood siding in affected area. ref 202406063863Details
document underpinning of garage foundation along property line shared with 2828 vallejo st for regrading of driveway and landscaping at 2828 vallejo st. remove and replace exterior wood framed wall, exterior sheathing, waterproofing and wood siding in affected area. ref 202406063863 | |
| Jun 6, 2024 | In progress issued Feb 2025 | 2828 Vallejo St | Van Acker Const Assoc Inc, Fma Builders | remodel interior of basement & upper 4-stories, including reconfiguring interior framing. remodel exterior including replacement of exterior windows & doors, roof tiles, brick & wood siding, addition of mechanical vault @ driveway court(within property line); upgrade mech,elect & plumbing. ref:Details
remodel interior of basement & upper 4-stories, including reconfiguring interior framing. remodel exterior including replacement of exterior windows & doors, roof tiles, brick & wood siding, addition of mechanical vault @ driveway court(within property line); upgrade mech,elect & plumbing. ref: | $5,000,000 |
| Mar 12, 2024 | Expired or cancelled cancelled May 2024 | 2828 Vallejo St | remodel interior of basement & upper 4-stories: reconfiguring interior framing; remodel exterior: replacement of exterior windows & doors, roof tiles. brick & wood siding,addition of mechanical vault @ driveway court (within property line);upgrade mech,elect & plumbing.ref202306200459,202310027853.Details
remodel interior of basement & upper 4-stories: reconfiguring interior framing; remodel exterior: replacement of exterior windows & doors, roof tiles. brick & wood siding,addition of mechanical vault @ driveway court (within property line);upgrade mech,elect & plumbing.ref202306200459,202310027853. | $5,000,000 | |
| Feb 8, 2024 | In progress issued Jul 2024 | 2828 Vallejo St | Van Acker Const Assoc Inc, Fma Builders | 1.revision to pa#2023-0620-0459 - increase scope of brick veneer removal 2. remove brick facade to be replaced in kind on south and east elevations 3. remove exiting exterior finishes to be replaced in kind to allow for seismic upgrade under pa# 2023-0620-0459 4. no grade changesDetails
1.revision to pa#2023-0620-0459 - increase scope of brick veneer removal 2. remove brick facade to be replaced in kind on south and east elevations 3. remove exiting exterior finishes to be replaced in kind to allow for seismic upgrade under pa# 2023-0620-0459 4. no grade changes | $65,000 |
| Oct 2, 2023 | Never finaled issued Oct 2023, no final | 2828 Vallejo St | Van Acker Const Assoc Inc, Fma Builders | remove unreinforced brick chimney & cap on north side. remove (e) exterior brick on lower levels as noted.Details
remove unreinforced brick chimney & cap on north side. remove (e) exterior brick on lower levels as noted. | $60,000 |
| Jun 20, 2023 | In progress issued Jan 2024 | 2828 Vallejo St | Van Acker Const Assoc Inc, Fma Builders | increasing sf of subbasement level, reconfigure interior & lower floor 6'8". increase sf of basement level. reconfifure interior & lower fl 2'-6'2".Details
increasing sf of subbasement level, reconfigure interior & lower floor 6'8". increase sf of basement level. reconfifure interior & lower fl 2'-6'2". | $646,451 |
| Dec 2, 2022 | Completed final sign-off Apr 2023 | 2124 Union St | Gar Construction Inc | install 3 signs, non-electric, single faced, wall signs. "mishka" " luxery dog boutique" & logoDetails
install 3 signs, non-electric, single faced, wall signs. "mishka" " luxery dog boutique" & logo | $2,000 |
| Dec 2, 2022 | Completed final sign-off Apr 2023 | 2124 Union St | Gar Construction Inc | comply w/ nov 202294368. legalize unpermitted storefront. no interior work.Details
comply w/ nov 202294368. legalize unpermitted storefront. no interior work. | $12,000 |
| Sep 9, 2022 | Completed final sign-off Oct 2023 | 1221 Jones St | Van Acker Const Assoc Inc | penthouse c3: reconfigure int non structural partition walls. remodel 2 1/2 baths, replace all plumbing, appliances, int lighting, int doorsDetails
penthouse c3: reconfigure int non structural partition walls. remodel 2 1/2 baths, replace all plumbing, appliances, int lighting, int doors | $100,000 |
| Jul 13, 2022 | Completed final sign-off May 2025 | 2000 Washington St | C A Mc Kee Construction | unit 5: reconfigure interior non structural partition walls. remodel kitchen and all baths. replace exterior windows in kind. no changes to exterior.Details
unit 5: reconfigure interior non structural partition walls. remodel kitchen and all baths. replace exterior windows in kind. no changes to exterior. | $1,000,000 |