Jillian Enckevort
- Listed as
- engineer
- Firm
- Ftf Engineering
- Based in
- San Francisco
- On San Francisco permits
- Feb 2022 to Jun 2026
17 permits since 2000 (engineer on 17 permits): 7 completed, 9 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 1, 2026 | In progress filed Jun 2026, not yet issued | 2828 Vallejo St | Van Acker Const Assoc Inc | rev to 202406063863.reconfig intf framing.replace extr wdws and doors;roof tiles and wood siding.upgrade mep.r/r elevator shaft/equipment and extend basement level; remove 2-story addition located on w/s bldg.build new 2-story addition in place 992sf).r/r (e) brick retaining wall on e/s of drwy.Details
rev to 202406063863.reconfig intf framing.replace extr wdws and doors;roof tiles and wood siding.upgrade mep.r/r elevator shaft/equipment and extend basement level; remove 2-story addition located on w/s bldg.build new 2-story addition in place 992sf).r/r (e) brick retaining wall on e/s of drwy. | |
| Jun 6, 2025 | In progress issued Jun 2025 | 2856 Vallejo St | Fma Builders | document underpinning of garage foundation along property line shared with 2828 vallejo st for regrading of driveway and landscaping at 2828 vallejo st. remove and replace exterior wood framed wall, exterior sheathing, waterproofing and wood siding in affected area. ref 202406063863Details
document underpinning of garage foundation along property line shared with 2828 vallejo st for regrading of driveway and landscaping at 2828 vallejo st. remove and replace exterior wood framed wall, exterior sheathing, waterproofing and wood siding in affected area. ref 202406063863 | |
| Dec 2, 2024 | In progress issued Sep 2025 | 525 23rd Av | Barker-O'donoghue Master Bldrs | modifications to front facade including: new bay window. enclose entry stair, new front door and garage door, new windows and siding materials. remodel of primary bed and bath. (n) direct vent gas fireplace in living room.Details
modifications to front facade including: new bay window. enclose entry stair, new front door and garage door, new windows and siding materials. remodel of primary bed and bath. (n) direct vent gas fireplace in living room. | $300,000 |
| Nov 26, 2024 | In progress issued May 2025 | 139 24th Av | Frank & Grossman Landscaping Contr Inc | voluntary structural improvement to (e) pergola footingDetails
voluntary structural improvement to (e) pergola footing | $30,000 |
| Oct 15, 2024 | In progress issued Sep 2025 | 4365 23rd St | Siena Pacific, Inc. | create new adu in basement ord. 162-16 ab1114. infill (e) lightwell. relocate (e) stair from street level to upper floor to connect to main house. create new stair from street level to new basement adu. earth shoring is required under a separate permit.Details
create new adu in basement ord. 162-16 ab1114. infill (e) lightwell. relocate (e) stair from street level to upper floor to connect to main house. create new stair from street level to new basement adu. earth shoring is required under a separate permit. | $985,714 |
| Jun 6, 2024 | In progress issued Feb 2025 | 2828 Vallejo St | Van Acker Const Assoc Inc, Fma Builders | remodel interior of basement & upper 4-stories, including reconfiguring interior framing. remodel exterior including replacement of exterior windows & doors, roof tiles, brick & wood siding, addition of mechanical vault @ driveway court(within property line); upgrade mech,elect & plumbing. ref:Details
remodel interior of basement & upper 4-stories, including reconfiguring interior framing. remodel exterior including replacement of exterior windows & doors, roof tiles, brick & wood siding, addition of mechanical vault @ driveway court(within property line); upgrade mech,elect & plumbing. ref: | $5,000,000 |
| Mar 12, 2024 | Expired or cancelled cancelled May 2024 | 2828 Vallejo St | remodel interior of basement & upper 4-stories: reconfiguring interior framing; remodel exterior: replacement of exterior windows & doors, roof tiles. brick & wood siding,addition of mechanical vault @ driveway court (within property line);upgrade mech,elect & plumbing.ref202306200459,202310027853.Details
remodel interior of basement & upper 4-stories: reconfiguring interior framing; remodel exterior: replacement of exterior windows & doors, roof tiles. brick & wood siding,addition of mechanical vault @ driveway court (within property line);upgrade mech,elect & plumbing.ref202306200459,202310027853. | $5,000,000 | |
| Nov 27, 2023 | Completed final sign-off Apr 2025 | 1407 Montgomery St | Stroub Construction | structural repair of (e) rear balcony (not visible from street). ref. pa #202206035544 & 202307202545Details
structural repair of (e) rear balcony (not visible from street). ref. pa #202206035544 & 202307202545 | $10,000 |
| Nov 13, 2023 | Completed final sign-off Sep 2024 | 43 Jordan Av | P 3 Construction & Remodeling Inc | interior remocel and seismic retroit of ground level as build drawings to combine work scope of 2023*0322-4164, 2023-0421-6195,2023-0517-7991 & 2023-0803-3673Details
interior remocel and seismic retroit of ground level as build drawings to combine work scope of 2023*0322-4164, 2023-0421-6195,2023-0517-7991 & 2023-0803-3673 | |
| Jun 20, 2023 | In progress issued Jan 2024 | 2828 Vallejo St | Van Acker Const Assoc Inc, Fma Builders | increasing sf of subbasement level, reconfigure interior & lower floor 6'8". increase sf of basement level. reconfifure interior & lower fl 2'-6'2".Details
increasing sf of subbasement level, reconfigure interior & lower floor 6'8". increase sf of basement level. reconfifure interior & lower fl 2'-6'2". | $646,451 |
| Jun 15, 2023 | In progress issued Jul 2024 | 660 Lombard St | Capetti Construction | install psl over e) windows. renove e) windows & replace w/ nana doors. install glass 3'-6 partition. replace e) drinkkin fountain to lavatories. replace e) doors to sinle 3' w/ 12" sidelight. remove e) double doorsDetails
install psl over e) windows. renove e) windows & replace w/ nana doors. install glass 3'-6 partition. replace e) drinkkin fountain to lavatories. replace e) doors to sinle 3' w/ 12" sidelight. remove e) double doors | $20,000 |
| May 9, 2023 | Completed final sign-off Mar 2024 | 1061 Folsom St | K Bali Construction | rev pa202205254948: updates and addition to details and structural elements. clarification of stair, fire spirnkler and fire alarm reqs and scope.Details
rev pa202205254948: updates and addition to details and structural elements. clarification of stair, fire spirnkler and fire alarm reqs and scope. | |
| May 9, 2023 | Completed final sign-off Mar 2024 | 1061 Folsom St | K Bali Construction | rev pa202204081865: updates to porject scope and changes resulting from building systems coordination. clarification of fire sprinklrs and fire alarm reqs and scope.Details
rev pa202204081865: updates to porject scope and changes resulting from building systems coordination. clarification of fire sprinklrs and fire alarm reqs and scope. | |
| Apr 26, 2023 | Completed final sign-off Feb 2024 | 375 Edgehill Wy | Aaron Gordon Construction Inc | revision to pa 2015-0820-4819s1, 2019-0822-9631 and 2021-0614-2388 (adu permit) to reflect as built conditions for stairs onthe east side of the structureDetails
revision to pa 2015-0820-4819s1, 2019-0822-9631 and 2021-0614-2388 (adu permit) to reflect as built conditions for stairs onthe east side of the structure | |
| May 25, 2022 | Completed final sign-off Mar 2024 | 1061 Folsom St | K Bali Construction | upgrade (e) elevator with a new elevator, for the second floor office suite, upgrades include access stair to that space. mechanical and electrical are under a seperate permits pa 202204081865. stair shop drawings deferred.Details
upgrade (e) elevator with a new elevator, for the second floor office suite, upgrades include access stair to that space. mechanical and electrical are under a seperate permits pa 202204081865. stair shop drawings deferred. | $170,526 |
| Apr 8, 2022 | Completed final sign-off Mar 2024 | 1061 Folsom St | K Bali Construction | t.i. ground floor, convert retail store to office space. structural mech, plumbing, electrical upgradesDetails
t.i. ground floor, convert retail store to office space. structural mech, plumbing, electrical upgrades | $999,839 |
| Feb 1, 2022 | In progress issued Jan 2025 | 53 Nevada St | J Fitzsimmons Building Inc. | renovation of & horizontal/vertical addition of 2600sq ft to an existing single family residence and will combine two lots. new structure will be a single family home with 4 bedrm, 3.5baths, living/dining space. property will merge 2 lots into one (lots 24 & 25). sprinklers per nfpa 13 sep permit.Details
renovation of & horizontal/vertical addition of 2600sq ft to an existing single family residence and will combine two lots. new structure will be a single family home with 4 bedrm, 3.5baths, living/dining space. property will merge 2 lots into one (lots 24 & 25). sprinklers per nfpa 13 sep permit. | $857,000 |