Permit GraphShortlistSan Francisco building permits since 2000

Monica Ream

License
C35179
Architect
About the California Architects Board
Look the license up with the state (Architects Board)
Listed as
architect
Firm
Monica Ream Architecture
Based in
Berkeley
On San Francisco permits
Feb 2018 to Jul 2025

12 permits since 2000 (architect on 12 permits): 8 completed, 3 in progress, 1 never finaled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Arrow Builders Inc (2), Barker-O'donoghue Master Bldrs (2), Elliott Build Remodel Llc (2), Aaron Gordon Construction Inc
Architects
Stephen Verner
Engineers
Ryan Billante (4), Jillian Van Enckevort

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jul 17, 2025In progress
issued Aug 2025
60 Russell StBarker-O'donoghue Master Bldrsrevision to pa # 2014-1107-1023 including: 1) add (n) 2 story bay window at front of the house. 2) replace (2) windows with (1) large window on rear elevation
Details
Permit
202507171009
Permit issued
Aug 26, 2025

revision to pa # 2014-1107-1023 including: 1) add (n) 2 story bay window at front of the house. 2) replace (2) windows with (1) large window on rear elevation

Open the permit page

$20,000
Jun 17, 2025Completed
final sign-off Sep 2025
3975 Cesar Chavez StAaron Gordon Construction Incnew interior stair to connect 1st and 2nd floor, (n) skylight.
Details
Permit
202506178885
Permit issued
Jun 23, 2025
Final sign-off
Sep 19, 2025

new interior stair to connect 1st and 2nd floor, (n) skylight.

Open the permit page

$74,000
Dec 2, 2024In progress
issued Sep 2025
525 23rd AvBarker-O'donoghue Master Bldrsmodifications to front facade including: new bay window. enclose entry stair, new front door and garage door, new windows and siding materials. remodel of primary bed and bath. (n) direct vent gas fireplace in living room.
Details
Permit
202410173200
Permit issued
Sep 2, 2025

modifications to front facade including: new bay window. enclose entry stair, new front door and garage door, new windows and siding materials. remodel of primary bed and bath. (n) direct vent gas fireplace in living room.

Open the permit page

$300,000
Jun 7, 2024Completed
final sign-off Mar 2025
3975 Cesar Chavez StElliott Build Remodel Llcstructural revision to 202211025705: triggered by field conditions. no exterior changes
Details
Permit
202406073966
Permit issued
Jun 10, 2024
Final sign-off
Mar 14, 2025

structural revision to 202211025705: triggered by field conditions. no exterior changes

Open the permit page

Nov 2, 2022Completed
final sign-off Mar 2025
3975 Cesar Chavez StElliott Build Remodel Llcreplace foundation rear infill addition @ first floor, replace garage door, replace all windows in kind & select exterior doors new deck stairs @ rear, interior remodeling. total sf added 175
Details
Permit
202211025708
Permit issued
Dec 6, 2022
Final sign-off
Mar 14, 2025

replace foundation rear infill addition @ first floor, replace garage door, replace all windows in kind & select exterior doors new deck stairs @ rear, interior remodeling. total sf added 175

Open the permit page

$554,000
May 3, 2022In progress
issued Apr 2024
60 Russell Strevision to site permit #201411071023: remove 2 car stacked parking & add to scope to add a full finished basement (workshop/bedroom, full bathroom, wine cellar, storage/closets) to habitable space and roof deck.
Details
Permit
202205033444
Permit issued
Apr 23, 2024

revision to site permit #201411071023: remove 2 car stacked parking & add to scope to add a full finished basement (workshop/bedroom, full bathroom, wine cellar, storage/closets) to habitable space and roof deck.

Open the permit page

$475,000
Nov 23, 2021Completed
final sign-off Sep 2022
3975 Cesar Chavez Stto obtain final inspection for work approved under previous permit application 8904451. all work is complete.
Details
Permit
202111233050
Permit issued
Nov 23, 2021
Final sign-off
Sep 30, 2022

to obtain final inspection for work approved under previous permit application 8904451. all work is complete.

Open the permit page

Nov 23, 2021Completed
final sign-off Sep 2022
3975 Cesar Chavez Stto obtain final inspection for work approved under previous permit applications: 200208214490, 200210290274. all work is complete.
Details
Permit
202111233048
Permit issued
Nov 23, 2021
Final sign-off
Sep 29, 2022

to obtain final inspection for work approved under previous permit applications: 200208214490, 200210290274. all work is complete.

Open the permit page

Nov 23, 2021Completed
final sign-off Sep 2022
3975 Cesar Chavez Stto obtain final inspection for work approved under previous permit applications: 200103194631, 200104308012, 200109107927. all work is complete.
Details
Permit
202111233049
Permit issued
Nov 23, 2021
Final sign-off
Sep 29, 2022

to obtain final inspection for work approved under previous permit applications: 200103194631, 200104308012, 200109107927. all work is complete.

Open the permit page

Feb 10, 2020Completed
final sign-off Feb 2021
1711 Baker StArrow Builders Increvision to pa #201902132849, 201906133360, 201907085349. structural: replace shearwall, beam, pot at 1st fl, revise interior wall at rear of garage. energy: replace furnace w/(n) radiant heat system. minor window changes at side & rear elevations.
Details
Permit
202002103983
Permit issued
Mar 6, 2020
Final sign-off
Feb 22, 2021

revision to pa #201902132849, 201906133360, 201907085349. structural: replace shearwall, beam, pot at 1st fl, revise interior wall at rear of garage. energy: replace furnace w/(n) radiant heat system. minor window changes at side & rear elevations.

Open the permit page

$20,000
Aug 8, 2019Completed
final sign-off Feb 2021
1711 Baker StArrow Builders Incenlarge (e) deck. construction ew 1 houre fire rated wall adjacent to side property line.
Details
Permit
201908088284
Permit issued
Feb 11, 2020
Final sign-off
Feb 22, 2021

enlarge (e) deck. construction ew 1 houre fire rated wall adjacent to side property line.

Open the permit page

$15,000
Feb 20, 2018Never finaled
issued Aug 2019, no final
2147 Lake St1st flr: addition @ rear & west side, interior remodel. 2nd flr: addition @ rear & west side, int. remodel, rebuild bay window & stair to front door. 3rd flr: addition @ rear & both sides, int. remodel, (n) roof.
Details
Permit
201802201732
Permit issued
Aug 2, 2019

1st flr: addition @ rear & west side, interior remodel. 2nd flr: addition @ rear & west side, int. remodel, rebuild bay window & stair to front door. 3rd flr: addition @ rear & both sides, int. remodel, (n) roof.

Open the permit page

$360,000