Ryan Billante
- Listed as
- architect, designer, engineer
- Firm
- Bkg Structural Engineers
- On San Francisco permits
- Oct 2010 to Jan 2026
26 permits since 2000 (engineer on 24 permits, architect on 1 permit, designer on 1 permit): 18 completed, 2 in progress, 3 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 16, 2026 | In progress issued Jul 2026 | 15 Loma Vista Tr | Buildable Llc | full interior renovation; ext upgrades; construction on a new attached garage. new construction of an adu part of (e) home.Details
full interior renovation; ext upgrades; construction on a new attached garage. new construction of an adu part of (e) home. | $1,250,000 |
| Jul 17, 2025 | In progress issued Aug 2025 | 60 Russell St | Barker-O'donoghue Master Bldrs | revision to pa # 2014-1107-1023 including: 1) add (n) 2 story bay window at front of the house. 2) replace (2) windows with (1) large window on rear elevationDetails
revision to pa # 2014-1107-1023 including: 1) add (n) 2 story bay window at front of the house. 2) replace (2) windows with (1) large window on rear elevation | $20,000 |
| Jul 1, 2025 | Expired or cancelled withdrawn May 2026 | 2 Winston Dr | revision 202504255218- foundation due to (e) conditions.Details
revision 202504255218- foundation due to (e) conditions. | $80,000 | |
| Jun 17, 2025 | Completed final sign-off Sep 2025 | 3975 Cesar Chavez St | Aaron Gordon Construction Inc | new interior stair to connect 1st and 2nd floor, (n) skylight.Details
new interior stair to connect 1st and 2nd floor, (n) skylight. | $74,000 |
| Apr 25, 2025 | Completed final sign-off Apr 2026 | 2 Winston Dr | Steve Spina Iii General Contractor | interior remodel; kitchen remodel, removal of 2 walls; seismic improvementsDetails
interior remodel; kitchen remodel, removal of 2 walls; seismic improvements | $80,000 |
| Aug 23, 2024 | Completed final sign-off May 2025 | 1017 Green St | Abacus Group Builders Inc | voluntary structural improvements including wall plywood & hardwareDetails
voluntary structural improvements including wall plywood & hardware | $5,000 |
| Nov 2, 2022 | Completed final sign-off Mar 2025 | 3975 Cesar Chavez St | Elliott Build Remodel Llc | replace foundation rear infill addition @ first floor, replace garage door, replace all windows in kind & select exterior doors new deck stairs @ rear, interior remodeling. total sf added 175Details
replace foundation rear infill addition @ first floor, replace garage door, replace all windows in kind & select exterior doors new deck stairs @ rear, interior remodeling. total sf added 175 | $554,000 |
| Feb 10, 2020 | Completed final sign-off Feb 2021 | 1711 Baker St | Arrow Builders Inc | revision to pa #201902132849, 201906133360, 201907085349. structural: replace shearwall, beam, pot at 1st fl, revise interior wall at rear of garage. energy: replace furnace w/(n) radiant heat system. minor window changes at side & rear elevations.Details
revision to pa #201902132849, 201906133360, 201907085349. structural: replace shearwall, beam, pot at 1st fl, revise interior wall at rear of garage. energy: replace furnace w/(n) radiant heat system. minor window changes at side & rear elevations. | $20,000 |
| Jan 30, 2020 | Completed final sign-off Dec 2020 | 466 Hill St | North Dream Construction Inc | remodel kitchenDetails
remodel kitchen | $25,000 |
| Oct 9, 2019 | Completed final sign-off Mar 2020 | 373 Cumberland St | North Dream Construction Inc | replacement of (e) fence with new fence in rear/side pl. fence shall be 10ft max at all points. to comply with complaint #201992181.Details
replacement of (e) fence with new fence in rear/side pl. fence shall be 10ft max at all points. to comply with complaint #201992181. | $8,000 |
| Jul 8, 2019 | Completed final sign-off Feb 2021 | 1711 Baker St | Arrow Builders Inc | revision to pa 2019-0613-3360 and 2019-0213-2849 simplification of retaining wall configurationDetails
revision to pa 2019-0613-3360 and 2019-0213-2849 simplification of retaining wall configuration | |
| Nov 16, 2018 | Never finaled issued Mar 2019, no final | 55 09th St | Linares Construction | 2 new roof top ladders mounted to penthouse wallDetails
2 new roof top ladders mounted to penthouse wall | $10,000 |
| Oct 23, 2017 | Completed final sign-off Aug 2018 | 37 Grove St | all floors- interior t.i. to includes toilets, stairs, ada upgrades, seperate permits for mep work is design build including modification to (e) fire sprinkler system. ext. storefront modification under seperate permit. change of use pa#201708154941, change of useDetails
all floors- interior t.i. to includes toilets, stairs, ada upgrades, seperate permits for mep work is design build including modification to (e) fire sprinkler system. ext. storefront modification under seperate permit. change of use pa#201708154941, change of use | $1,000,000 | |
| May 23, 2017 | Completed final sign-off Aug 2017 | 5285 Diamond Heights Bl | D M Builders | dryrot repair at exterior wall of south stair towerDetails
dryrot repair at exterior wall of south stair tower | $10,000 |
| Apr 20, 2017 | Completed final sign-off Aug 2017 | 1017 Green St | Abacus Group Builders Inc | retaining wall. repair & reinforcment. voluntary structural improvements as part of rear porch repair "less than 50% repair".Details
retaining wall. repair & reinforcment. voluntary structural improvements as part of rear porch repair "less than 50% repair". | $25,000 |
| Sep 26, 2016 | Expired or cancelled expired Nov 2023 | 3030 California St | site work rear yard. retaining walls, slab on gradeDetails
site work rear yard. retaining walls, slab on grade | $35,000 | |
| Apr 26, 2016 | Completed final sign-off Aug 2016 | 1762 27th Av | revision to pa 2016-0212-9461 (r1), lateral design addition to plywood at (5) new interior walls at 2nd floor.Details
revision to pa 2016-0212-9461 (r1), lateral design addition to plywood at (5) new interior walls at 2nd floor. | ||
| Feb 12, 2016 | Completed final sign-off Dec 2016 | 1762 27th Av | interior remodel of existing kitchen and existing master bath, addition of new half bath. infill (e) lightwell against neighbor's blank wall.Details
interior remodel of existing kitchen and existing master bath, addition of new half bath. infill (e) lightwell against neighbor's blank wall. | $38,000 | |
| Oct 5, 2015 | Expired or cancelled cancelled Jan 2026 | 1960 08th Av | Elliott Remodeling | install new garage foundation and retaining wall per plansDetails
install new garage foundation and retaining wall per plans | $5,000 |
| Oct 5, 2015 | Never finaled issued Oct 2015, no final | 1945 08th Av | Elliott Remodeling | install new garage foundation and retaining wall per plansDetails
install new garage foundation and retaining wall per plans | $50,000 |
| Sep 9, 2015 | Completed final sign-off Aug 2016 | 2578 29th Av | Chang Chao Ming Constr | kitchen & 2 baths remodel, add power room, enclosed (e) courtyard with new skylight. re-build interior stair, replace window opening with new patio ddoor, add 1/f bathroom.Details
kitchen & 2 baths remodel, add power room, enclosed (e) courtyard with new skylight. re-build interior stair, replace window opening with new patio ddoor, add 1/f bathroom. | $140,000 |
| Mar 24, 2015 | Completed final sign-off Jul 2016 | 3020 Scott St | Plath & Company Inc | bearing wall to be removed at 1st fl and new steel beam to be installed. remodel 3 baths & one powder room in kind.Details
bearing wall to be removed at 1st fl and new steel beam to be installed. remodel 3 baths & one powder room in kind. | $5,000 |
| Jan 7, 2015 | Completed final sign-off Sep 2015 | 2003 Lyon St | C H Burnham Inc | interior remodel at dining room & breakfast nook & master bedroom.Details
interior remodel at dining room & breakfast nook & master bedroom. | $15,000 |
| Nov 26, 2014 | Completed final sign-off Jan 2017 | 2 Presidio Tr | Plath & Company Inc | raised ceiling, no change to building envelope. n/a maher ordinanceDetails
raised ceiling, no change to building envelope. n/a maher ordinance | $10,000 |
| Nov 7, 2014 | Never finaled issued Feb 2017, no final | 60 Russell St | add 2 stories to an (e) one story single family res'd. add balcony to rear. infill tradesman's path on west side & infill 3 small lightwells, replace foundation. extensive int. remodel. add garage w/2 car mechanized stacked parking. add (n) drive way w/curb cut. raise rear yard, replace deck.Details
add 2 stories to an (e) one story single family res'd. add balcony to rear. infill tradesman's path on west side & infill 3 small lightwells, replace foundation. extensive int. remodel. add garage w/2 car mechanized stacked parking. add (n) drive way w/curb cut. raise rear yard, replace deck. | $475,000 | |
| Oct 29, 2010 | Completed final sign-off Feb 2011 | 1501 20th St | Mc Gowan Builders | new header should be installed, a min of 4x10 df #2 (max span = 7'-0") hu hangers to hang existing joists into new 4x10 header. knock out blocking at each end of new header to ensure proper bearing on existing load bearing walls. replace blocking after header has been installed.Details
new header should be installed, a min of 4x10 df #2 (max span = 7'-0") hu hangers to hang existing joists into new 4x10 header. knock out blocking at each end of new header to ensure proper bearing on existing load bearing walls. replace blocking after header has been installed. | $4,000 |