Elliott Remodeling
- Based in
- Oakland
- On San Francisco permits
- May 2000 to Jul 2026
- Last 24 months
- 2 permits filed
64 permits since 2000: 47 completed, 1 in progress, 10 never finaled, 6 expired or cancelled.
Of the 10 never-finaled permits, 2 are 3 to 5 years old, 1 is 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 31, 2026 | In progress issued Jul 2026 | 530 Belvedere St | remodel existing kitchen, bath,. replace in kind no structural changes.Details
remodel existing kitchen, bath,. replace in kind no structural changes. | $150,000 |
| Jun 17, 2025 | Completed final sign-off Jul 2026 | 3434 21st St | repairs to rotted front steps, repair dry rot, replace treads and risers, replace front newel post, less than 50% replacementDetails
repairs to rotted front steps, repair dry rot, replace treads and risers, replace front newel post, less than 50% replacement | $25,000 |
| Sep 13, 2024 | Completed final sign-off Jun 2025 | 1058 Chestnut St | revision to pa# 202406104114. revision to stair handrail.Details
revision to pa# 202406104114. revision to stair handrail. | |
| Jun 10, 2024 | Completed final sign-off Jun 2025 | 1058 Chestnut St | revision to pa# 202203029093: entry lobby - finish floors, walls, and ceilings. new lighting and outlets. add new storage closet.Details
revision to pa# 202203029093: entry lobby - finish floors, walls, and ceilings. new lighting and outlets. add new storage closet. | $25,000 |
| Feb 17, 2023 | Completed final sign-off May 2024 | 1062 Chestnut St | replace siding in kind on west side of propertyDetails
replace siding in kind on west side of property | $10,000 |
| Mar 29, 2022 | Completed final sign-off Jun 2025 | 1062 Chestnut St | 3rd fl interior renovation. new and modified window openings.Details
3rd fl interior renovation. new and modified window openings. | $195,000 |
| Mar 2, 2022 | Never finaled issued Dec 2022, no final | 1058 Chestnut St | add elevator at all floors. infill (e) 4'-0" x 4'-6"Details
add elevator at all floors. infill (e) 4'-0" x 4'-6" | $15,000 |
| Mar 2, 2022 | Never finaled issued Dec 2022, no final | 1060 Chestnut St | add elevator at all floors. infill (e) 4'-0" x 4'-6" light well at unit 1060 on west elevation. relocate powder room at 1060. and new washer/ dryer in laudry closet.Details
add elevator at all floors. infill (e) 4'-0" x 4'-6" light well at unit 1060 on west elevation. relocate powder room at 1060. and new washer/ dryer in laudry closet. | $35,000 |
| Mar 2, 2022 | Completed final sign-off Aug 2025 | 1062 Chestnut St | add elevator at all floors. infill (e) 4'-0" x 4'-6" light well at unit 1062 on west elevation. relocate powder room at 1062.Details
add elevator at all floors. infill (e) 4'-0" x 4'-6" light well at unit 1062 on west elevation. relocate powder room at 1062. | $35,000 |
| May 6, 2021 | Completed final sign-off Feb 2022 | 1060 Chestnut St | repair existing dryrot at rooftop deck. repairs not to exceed 50% of deck. replace in kind.Details
repair existing dryrot at rooftop deck. repairs not to exceed 50% of deck. replace in kind. | $25,000 |
| Nov 6, 2019 | Completed final sign-off Nov 2019 | 319 Castenada Av | to obtain final inspection for work approved under pa#201712055522Details
to obtain final inspection for work approved under pa#201712055522 | |
| Jan 10, 2019 | Completed final sign-off Feb 2019 | 1058 Chestnut St | to obtain a final inspection for work approved under pa201606139835. all work is complete.Details
to obtain a final inspection for work approved under pa201606139835. all work is complete. | |
| Jan 10, 2019 | Completed final sign-off Jan 2019 | 1945 08th Av | to obtain a final inspection for work approved under pa201605187754. all work is complete.Details
to obtain a final inspection for work approved under pa201605187754. all work is complete. | |
| Jan 10, 2019 | Never finaled issued Jan 2019, no final | 1945 08th Av | to obtain a final inspection for work approved under pa201609097341/201510058852/201507242398. all work is complete.Details
to obtain a final inspection for work approved under pa201609097341/201510058852/201507242398. all work is complete. | |
| Apr 27, 2018 | Completed final sign-off Aug 2022 | 1945 08th Av | new sloped roof & dormer to replace existing flat roof at existing attached garageDetails
new sloped roof & dormer to replace existing flat roof at existing attached garage | $20,000 |
| Feb 9, 2018 | Completed final sign-off Nov 2019 | 319 Castenada Av | open (e) walls & ceilings for complete knob & tube wiring upgrade/heating system upgrade. 5/8 drywall @ all associated patches. remove and replace (e) kitchen counter tops. no change on wallsDetails
open (e) walls & ceilings for complete knob & tube wiring upgrade/heating system upgrade. 5/8 drywall @ all associated patches. remove and replace (e) kitchen counter tops. no change on walls | $200,000 |
| Dec 5, 2017 | Completed final sign-off Nov 2019 | 319 Castenada Av | replace (e) garage doors with new. adjust door location and size & provide (n) structural shear wall panels at either end & remove finish on interior demising wall.Details
replace (e) garage doors with new. adjust door location and size & provide (n) structural shear wall panels at either end & remove finish on interior demising wall. | $12,000 |
| Jun 15, 2017 | Completed final sign-off Jan 2018 | 1321 06th Av | remodel existing bathroom and water closet. no structural changes. new finishes and fixtures.Details
remodel existing bathroom and water closet. no structural changes. new finishes and fixtures. | $30,000 |
| Sep 9, 2016 | Never finaled issued Sep 2016, no final | 1945 08th Av | remodel 3/f including 1 bathroom and 2 rooms. no structural changes, remove plaster wall/ceiling finish, new wiring & plumbing, insulate walls/ceilings, sheetrock & trim. all existing layouts to remain unchanged.Details
remodel 3/f including 1 bathroom and 2 rooms. no structural changes, remove plaster wall/ceiling finish, new wiring & plumbing, insulate walls/ceilings, sheetrock & trim. all existing layouts to remain unchanged. | $75,000 |
| May 18, 2016 | Completed final sign-off Jun 2016 | 1945 08th Av | to renew pa# 201407151283, 201410068127 and 201503181178 for final inspection. all work complete.Details
to renew pa# 201407151283, 201410068127 and 201503181178 for final inspection. all work complete. | |
| May 18, 2016 | Completed final sign-off Jan 2019 | 1945 08th Av | to renew pa# 201405145718 and # 201408042921 for final inspection. all work complete.Details
to renew pa# 201405145718 and # 201408042921 for final inspection. all work complete. | |
| Oct 5, 2015 | Never finaled issued Oct 2015, no final | 1960 09th Av | install geo grout as a temporary shoring system at retaining wall between 1960 9th ave and 1945 8th ave. geo grout per bkg engineering plan 10/1/15. ref. permit #2015-1005-8852 for work at 1945 8th ave.Details
install geo grout as a temporary shoring system at retaining wall between 1960 9th ave and 1945 8th ave. geo grout per bkg engineering plan 10/1/15. ref. permit #2015-1005-8852 for work at 1945 8th ave. | $5,000 |
| Oct 5, 2015 | Never finaled issued Oct 2015, no final | 1945 08th Av | install new garage foundation and retaining wall per plansDetails
install new garage foundation and retaining wall per plans | $50,000 |
| Oct 5, 2015 | Expired or cancelled cancelled Jan 2026 | 1960 08th Av | install new garage foundation and retaining wall per plansDetails
install new garage foundation and retaining wall per plans | $5,000 |
| Jul 24, 2015 | Never finaled issued Jul 2015, no final | 1945 08th Av | remove existing wood retaining walls @ left of driveway & @ front of property. install new concrete retaining walls per bldg plans dtd 7-22-15.Details
remove existing wood retaining walls @ left of driveway & @ front of property. install new concrete retaining walls per bldg plans dtd 7-22-15. | $75,000 |
| Mar 18, 2015 | Never finaled issued Mar 2015, no final | 1945 08th Av | remove & replace rotten mudsill @ garage perimiter, kitchen exterior wall & dining room front wall. replace all finishes in-kind. remodel (e) powder room @ first floor. no structural changes.Details
remove & replace rotten mudsill @ garage perimiter, kitchen exterior wall & dining room front wall. replace all finishes in-kind. remodel (e) powder room @ first floor. no structural changes. | $50,000 |
| Jan 20, 2015 | Completed final sign-off Dec 2015 | 1945 08th Av | remove and replace rotten mudsill @ living room (approx. 75 lf), install wall insulation and plywood sheathing.all finishes to be replaced in kind- (front & side of bldg)Details
remove and replace rotten mudsill @ living room (approx. 75 lf), install wall insulation and plywood sheathing.all finishes to be replaced in kind- (front & side of bldg) | $15,000 |
| Oct 6, 2014 | Never finaled issued Oct 2014, no final | 1945 08th Av | replace wood windows and doors in-kind; replace stucco & wood siding on south wall. new material in kind with existing.Details
replace wood windows and doors in-kind; replace stucco & wood siding on south wall. new material in kind with existing. | $70,000 |
| Aug 4, 2014 | Completed final sign-off Jan 2019 | 1945 08th Av | remodel master bath; replace tub, toilet, vanity, shower; no structural changes.Details
remodel master bath; replace tub, toilet, vanity, shower; no structural changes. | $30,000 |
| May 14, 2014 | Completed final sign-off Jan 2019 | 1945 08th Av | remodel guest bath @ 2/f, no structural changes, new counter tops, appliances & sinks/faucets at kitchen, new lighting & outlets throughout home, open walls & ceilings as necessary for new wiring at 1/f & 2/f.Details
remodel guest bath @ 2/f, no structural changes, new counter tops, appliances & sinks/faucets at kitchen, new lighting & outlets throughout home, open walls & ceilings as necessary for new wiring at 1/f & 2/f. | $100,000 |
| Feb 10, 2014 | Completed final sign-off Feb 2023 | 255 Chestnut St | to obtain final inspection for work approved under pa#2013.0208.9777. all work is complete.Details
to obtain final inspection for work approved under pa#2013.0208.9777. all work is complete. | |
| Feb 10, 2014 | Completed final sign-off Mar 2014 | 255 Chestnut St | to obtain final inspection for work approved under pa#2012.0123.2737. all work is complete.Details
to obtain final inspection for work approved under pa#2012.0123.2737. all work is complete. | |
| Feb 10, 2014 | Completed final sign-off Mar 2014 | 255 Chestnut St | to obtain final inspection for work approved under pa#2012.0410.7986. all work is complete.Details
to obtain final inspection for work approved under pa#2012.0410.7986. all work is complete. | |
| Feb 10, 2014 | Completed final sign-off Mar 2014 | 255 Chestnut St | to obtain final inspection for work approved under pa#2011.1206.0132. all work is complete.Details
to obtain final inspection for work approved under pa#2011.1206.0132. all work is complete. | |
| Feb 10, 2014 | Completed final sign-off Mar 2014 | 255 Chestnut St | to obtain final inspection for work approved under pa#2012.0213.4054. all work is complete.Details
to obtain final inspection for work approved under pa#2012.0213.4054. all work is complete. | |
| Feb 10, 2014 | Completed final sign-off Jan 2023 | 255 Chestnut St | to obtain final inspection for work approved under pa#2012.0709.4345. all work is complete.Details
to obtain final inspection for work approved under pa#2012.0709.4345. all work is complete. | |
| Feb 10, 2014 | Never finaled issued Feb 2014, no final | 255 Chestnut St | to obtain final inspection for work approved under pa#2013.0403.3714. all work is complete.Details
to obtain final inspection for work approved under pa#2013.0403.3714. all work is complete. | |
| Feb 10, 2014 | Completed final sign-off Feb 2014 | 255 Chestnut St | to obtain final inspection for work approved under pa#2011.1116.9010. all work is complete.Details
to obtain final inspection for work approved under pa#2011.1116.9010. all work is complete. | |
| Apr 3, 2013 | Expired or cancelled expired Jul 2019 | 255 Chestnut St | remove & replace existing rotten siding at east wall, remove & replace in-kind as necessary. install bumbwaiter per plans basement to first floor.Details
remove & replace existing rotten siding at east wall, remove & replace in-kind as necessary. install bumbwaiter per plans basement to first floor. | $48,000 |
| Mar 19, 2013 | Completed final sign-off Jun 2013 | 1409 21st Av | remodel 1409 and 1411 kitchen and laundry rooms. no structural changes.Details
remodel 1409 and 1411 kitchen and laundry rooms. no structural changes. | $120,000 |
| Feb 8, 2013 | Completed final sign-off Feb 2023 | 255 Chestnut St | revision to pa# 201111169010. remove 4 existing exterior door. close 1 door off. install 2 new doors and 3 new windows in (e) openings. all are at rear yard of bldg, not visible from street.Details
revision to pa# 201111169010. remove 4 existing exterior door. close 1 door off. install 2 new doors and 3 new windows in (e) openings. all are at rear yard of bldg, not visible from street. | $15,000 |
| Jul 9, 2012 | Expired or cancelled expired Jul 2019 | 255 Chestnut St | remodel master bathroom, no structural changes.Details
remodel master bathroom, no structural changes. | $75,000 |
| Jul 9, 2012 | Completed final sign-off Oct 2012 | 320 Castenada Av | bathroom remodel, no structural changes.Details
bathroom remodel, no structural changes. | $50,000 |
| Nov 16, 2011 | Expired or cancelled expired Jul 2019 | 255 Chestnut St | remodel existing kitchen, guest bathroom, bar and powder room. no structural changes. all (n) lighting must comply with cec150(k) 8 & 10Details
remodel existing kitchen, guest bathroom, bar and powder room. no structural changes. all (n) lighting must comply with cec150(k) 8 & 10 | $175,000 |
| Sep 20, 2011 | Completed final sign-off Dec 2011 | 507 Congo St | minor bath remodel - no structural changes. minor kitchen remodel - no structural changes. new lighting comply cec 150 (k).Details
minor bath remodel - no structural changes. minor kitchen remodel - no structural changes. new lighting comply cec 150 (k). | $35,000 |
| Aug 2, 2011 | Completed final sign-off Oct 2011 | 320 Castenada Av | install 12 replacement windows at rear of building, u= .40 or better, same size and locationDetails
install 12 replacement windows at rear of building, u= .40 or better, same size and location | $8,000 |
| Jul 11, 2011 | Completed final sign-off Oct 2011 | 449 Alvarado St | remove (e) dry-rot at front stairs, all new material in-kind with (e), less than 50%.Details
remove (e) dry-rot at front stairs, all new material in-kind with (e), less than 50%. | $10,000 |
| Oct 21, 2010 | Completed final sign-off Mar 2011 | 530 Belvedere St | remodel existing split bath. no structural changes.Details
remodel existing split bath. no structural changes. | $50,000 |
| Apr 27, 2010 | Completed final sign-off Sep 2010 | 88 Ashbury Tr | replace existing landing and stairs at rear of buildingDetails
replace existing landing and stairs at rear of building | $7,000 |
| Sep 17, 2009 | Completed final sign-off Dec 2009 | 453 Alvarado St | remodel extg kitchen. remove and replace cabinets, appliances and countertops. no structural changesDetails
remodel extg kitchen. remove and replace cabinets, appliances and countertops. no structural changes | $50,000 |
| Mar 3, 2009 | Completed final sign-off Mar 2009 | 200 Central Av | bathroom remodel. no structural change. remove & replace fixtures.Details
bathroom remodel. no structural change. remove & replace fixtures. | $8,300 |
| Jul 21, 2008 | Completed final sign-off Sep 2008 | 553 Douglass St | remodel existing 1 bathroom. no structural changes. change window in bathroom in kind replacement.Details
remodel existing 1 bathroom. no structural changes. change window in bathroom in kind replacement. | $10,000 |
| May 26, 2006 | Completed final sign-off Jul 2006 | 330 Upper Tr | remove + replace leaking stucco at third floor front facade. remove and replace 2 fixed windows at facade with operable windows of same size/composition stucco to be as original in detail and texture.Details
remove + replace leaking stucco at third floor front facade. remove and replace 2 fixed windows at facade with operable windows of same size/composition stucco to be as original in detail and texture. | $10,000 |
| Mar 30, 2004 | Completed final sign-off Jun 2004 | 4775 19th St | kchn remodelDetails
kchn remodel | $10,000 |
| Sep 24, 2003 | Completed final sign-off Mar 2005 | 29 Ora Wy | 2nd flfoor 237 s.f. addition at the 2nd floor balcony into a study and closetDetails
2nd flfoor 237 s.f. addition at the 2nd floor balcony into a study and closet | $23,000 |
| Nov 4, 2002 | Expired or cancelled expired Mar 2009 | 462 Castro St | bathrm remodel no sturctural changes, no change iin wallsDetails
bathrm remodel no sturctural changes, no change iin walls | $10,000 |
| Aug 31, 2001 | Completed final sign-off Nov 2001 | 353 Sweeny St | remodel existing kitchen. no structural changesDetails
remodel existing kitchen. no structural changes | $10,000 |
| Aug 31, 2001 | Completed final sign-off Oct 2001 | 1409 21st Av | repair termite damage as noted in termite report. markoff pest control repoart#942263 item#2. removeDetails
repair termite damage as noted in termite report. markoff pest control repoart#942263 item#2. remove | $3,000 |
| Jul 9, 2001 | Completed final sign-off Aug 2001 | 966 Guerrero St | address correction fr:964 guerrero st. to:966 guerrero st.Details
address correction fr:964 guerrero st. to:966 guerrero st. | |
| Jun 27, 2001 | Completed final sign-off Jul 2001 | 1332 Clement St | to renew pa#2000/11/07/5110 for final inspectionDetails
to renew pa#2000/11/07/5110 for final inspection | |
| Jun 14, 2001 | Expired or cancelled expired Aug 2001 | 964 Guerrero St | remodel bathroom on 1/floorDetails
remodel bathroom on 1/floor | $10,000 |
| May 7, 2001 | Completed final sign-off Aug 2001 | 2533 Turk Bl | repair vehicular damage to facade of bldg/remove and replace as extgDetails
repair vehicular damage to facade of bldg/remove and replace as extg | $2,500 |
| Jul 13, 2000 | Completed final sign-off Dec 2000 | 21 Vicksburg St | remodel exsisting bathroom, new tub/shower, toilet and sinkDetails
remodel exsisting bathroom, new tub/shower, toilet and sink | $10,000 |
| May 19, 2000 | Completed final sign-off Jun 2000 | 283 Mallorca Wy | revise #9925205Details
revise #9925205 |