Back to bathroom remodel contractors
Elliott Remodeling
- Based in
- Oakland
- On San Francisco permits
- May 2000 to Jul 2026
- Last 24 months
- 2 permits filed
64 permits since 2000: 47 completed, 1 in progress, 10 never finaled, 6 expired or cancelled.
Of the 10 never-finaled permits, 2 are 3 to 5 years old, 1 is 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
14 bathroom remodel permits: 9 completed, 1 in progress, 1 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 139 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 31, 2026 | In progress issued Jul 2026 | 530 Belvedere St | remodel existing kitchen, bath,. replace in kind no structural changes.Details
remodel existing kitchen, bath,. replace in kind no structural changes. | $150,000 |
| Jun 15, 2017 | Completed final sign-off Jan 2018 | 1321 06th Av | remodel existing bathroom and water closet. no structural changes. new finishes and fixtures.Details
remodel existing bathroom and water closet. no structural changes. new finishes and fixtures. | $30,000 |
| Sep 9, 2016 | Never finaled issued Sep 2016, no final | 1945 08th Av | remodel 3/f including 1 bathroom and 2 rooms. no structural changes, remove plaster wall/ceiling finish, new wiring & plumbing, insulate walls/ceilings, sheetrock & trim. all existing layouts to remain unchanged.Details
remodel 3/f including 1 bathroom and 2 rooms. no structural changes, remove plaster wall/ceiling finish, new wiring & plumbing, insulate walls/ceilings, sheetrock & trim. all existing layouts to remain unchanged. | $75,000 |
| Aug 4, 2014 | Completed final sign-off Jan 2019 | 1945 08th Av | remodel master bath; replace tub, toilet, vanity, shower; no structural changes.Details
remodel master bath; replace tub, toilet, vanity, shower; no structural changes. | $30,000 |
| May 14, 2014 | Completed final sign-off Jan 2019 | 1945 08th Av | remodel guest bath @ 2/f, no structural changes, new counter tops, appliances & sinks/faucets at kitchen, new lighting & outlets throughout home, open walls & ceilings as necessary for new wiring at 1/f & 2/f.Details
remodel guest bath @ 2/f, no structural changes, new counter tops, appliances & sinks/faucets at kitchen, new lighting & outlets throughout home, open walls & ceilings as necessary for new wiring at 1/f & 2/f. | $100,000 |
| Jul 9, 2012 | Expired or cancelled expired Jul 2019 | 255 Chestnut St | remodel master bathroom, no structural changes.Details
remodel master bathroom, no structural changes. | $75,000 |
| Jul 9, 2012 | Completed final sign-off Oct 2012 | 320 Castenada Av | bathroom remodel, no structural changes.Details
bathroom remodel, no structural changes. | $50,000 |
| Nov 16, 2011 | Expired or cancelled expired Jul 2019 | 255 Chestnut St | remodel existing kitchen, guest bathroom, bar and powder room. no structural changes. all (n) lighting must comply with cec150(k) 8 & 10Details
remodel existing kitchen, guest bathroom, bar and powder room. no structural changes. all (n) lighting must comply with cec150(k) 8 & 10 | $175,000 |
| Sep 20, 2011 | Completed final sign-off Dec 2011 | 507 Congo St | minor bath remodel - no structural changes. minor kitchen remodel - no structural changes. new lighting comply cec 150 (k).Details
minor bath remodel - no structural changes. minor kitchen remodel - no structural changes. new lighting comply cec 150 (k). | $35,000 |
| Oct 21, 2010 | Completed final sign-off Mar 2011 | 530 Belvedere St | remodel existing split bath. no structural changes.Details
remodel existing split bath. no structural changes. | $50,000 |
| Mar 3, 2009 | Completed final sign-off Mar 2009 | 200 Central Av | bathroom remodel. no structural change. remove & replace fixtures.Details
bathroom remodel. no structural change. remove & replace fixtures. | $8,300 |
| Jul 21, 2008 | Completed final sign-off Sep 2008 | 553 Douglass St | remodel existing 1 bathroom. no structural changes. change window in bathroom in kind replacement.Details
remodel existing 1 bathroom. no structural changes. change window in bathroom in kind replacement. | $10,000 |
| Jun 14, 2001 | Expired or cancelled expired Aug 2001 | 964 Guerrero St | remodel bathroom on 1/floorDetails
remodel bathroom on 1/floor | $10,000 |
| Jul 13, 2000 | Completed final sign-off Dec 2000 | 21 Vicksburg St | remodel exsisting bathroom, new tub/shower, toilet and sinkDetails
remodel exsisting bathroom, new tub/shower, toilet and sink | $10,000 |