Charles John Mazzola
- Listed as
- authorized agent-others, contractor
- Firm
- Fma Builders
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Jul 2026
208 permits since 2000 (contractor on 208 permits, authorized agent-others on 1 permit): 121 completed, 15 in progress, 30 never finaled, 42 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 208.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 1, 2026 | In progress issued Jul 2026 | 632 El Camino Del Mar | Fma Builders | revision to bpa 202511250401. selective demo of existing exhaust vent pipe at vertical section in the chimney chase to replace vent pipe. new 4" ceramic insulation.Details
revision to bpa 202511250401. selective demo of existing exhaust vent pipe at vertical section in the chimney chase to replace vent pipe. new 4" ceramic insulation. | $1,000 |
| Apr 7, 2026 | In progress issued Apr 2026 | 3383 Clay St | Fma Builders | to obtain final inspection for work approved under pa# 201512145080, 201703171713, and 201802272342. all work is complete.Details
to obtain final inspection for work approved under pa# 201512145080, 201703171713, and 201802272342. all work is complete. | |
| Nov 26, 2025 | In progress issued Jan 2026 | 3355 Pacific Av | Fma Builders | revision to pa#202503212827 for north facade improvements interior /rcp revisions title 24 associated structural work.Details
revision to pa#202503212827 for north facade improvements interior /rcp revisions title 24 associated structural work. | $75,000 |
| Nov 25, 2025 | In progress issued Dec 2025 | 632 El Camino Del Mar | Fma Builders | demo and replace exhaust pipe insulation.Details
demo and replace exhaust pipe insulation. | $12,000 |
| Jun 6, 2025 | In progress issued Jun 2025 | 2856 Vallejo St | Fma Builders | document underpinning of garage foundation along property line shared with 2828 vallejo st for regrading of driveway and landscaping at 2828 vallejo st. remove and replace exterior wood framed wall, exterior sheathing, waterproofing and wood siding in affected area. ref 202406063863Details
document underpinning of garage foundation along property line shared with 2828 vallejo st for regrading of driveway and landscaping at 2828 vallejo st. remove and replace exterior wood framed wall, exterior sheathing, waterproofing and wood siding in affected area. ref 202406063863 | |
| May 5, 2025 | In progress issued Nov 2025 | 3355 Pacific Av | Fma Builders | revision 202108236937 and ref 202404059401- changes to interior layout infill enclose under (e) deck, in kind replacment of windows, doors, siding, and roof deck add rooftop mechanical screening, reconfigure side yard walkway mech for future battery storage systemDetails
revision 202108236937 and ref 202404059401- changes to interior layout infill enclose under (e) deck, in kind replacment of windows, doors, siding, and roof deck add rooftop mechanical screening, reconfigure side yard walkway mech for future battery storage system | $100,001 |
| Aug 21, 2024 | Completed final sign-off Feb 2025 | 2506 Leavenworth St | Fma Builders | (stucco repair only) demo water damaged elements and replace in kind: stucco on garage and adjacent retaining wall on garage opening wing wall. no layout changes or other structural work as part of this scope. exterior work visible from the street.Details
(stucco repair only) demo water damaged elements and replace in kind: stucco on garage and adjacent retaining wall on garage opening wing wall. no layout changes or other structural work as part of this scope. exterior work visible from the street. | $5,000 |
| Aug 2, 2024 | In progress issued Aug 2024 | 3898 Washington St | Fma Builders | demo of interior finishes & dry rot repair,5.5 bathrooms remodel in-kind. demo (e)lighting & wiring & replace in-kind.(n)lighting for bathroom remodel comply with cec 150.0(k)5.repair mep systems.no structural work, no (e)wall relocation.(n)sheet rock shall be 5/8" type x.dry rot repair limited to 5Details
demo of interior finishes & dry rot repair,5.5 bathrooms remodel in-kind. demo (e)lighting & wiring & replace in-kind.(n)lighting for bathroom remodel comply with cec 150.0(k)5.repair mep systems.no structural work, no (e)wall relocation.(n)sheet rock shall be 5/8" type x.dry rot repair limited to 5 | $400,000 |
| Jun 6, 2024 | In progress issued Feb 2025 | 2828 Vallejo St | Van Acker Const Assoc Inc, Fma Builders | remodel interior of basement & upper 4-stories, including reconfiguring interior framing. remodel exterior including replacement of exterior windows & doors, roof tiles, brick & wood siding, addition of mechanical vault @ driveway court(within property line); upgrade mech,elect & plumbing. ref:Details
remodel interior of basement & upper 4-stories, including reconfiguring interior framing. remodel exterior including replacement of exterior windows & doors, roof tiles, brick & wood siding, addition of mechanical vault @ driveway court(within property line); upgrade mech,elect & plumbing. ref: | $5,000,000 |
| Apr 22, 2024 | In progress issued Feb 2025 | 3355 Pacific Av | Fma Builders, Partners Contracting Inc. | revision to pa 202108236937. change media and gym rooms to new natatorium. expand scope of work to include new interior swimming pool, subterranean mechanical, electrical, and pool equipment vault beneath rear yard. no change to building exterior or conditioned area. add new fire sprinkler system thDetails
revision to pa 202108236937. change media and gym rooms to new natatorium. expand scope of work to include new interior swimming pool, subterranean mechanical, electrical, and pool equipment vault beneath rear yard. no change to building exterior or conditioned area. add new fire sprinkler system th | $850,000 |
| Mar 26, 2024 | In progress issued Apr 2024 | 1921 Sacramento St | Fontana Construction, Inc., Fma Builders | investigate dry rot and make repairs as needed. paint exterior. investigate main waste line. location of investigation and repair at rear sunroom/dining room at lowest level approx. 150% additoinal permit required if scope exceeds the stated scope.Details
investigate dry rot and make repairs as needed. paint exterior. investigate main waste line. location of investigation and repair at rear sunroom/dining room at lowest level approx. 150% additoinal permit required if scope exceeds the stated scope. | $10,000 |
| Feb 8, 2024 | In progress issued Jul 2024 | 2828 Vallejo St | Van Acker Const Assoc Inc, Fma Builders | 1.revision to pa#2023-0620-0459 - increase scope of brick veneer removal 2. remove brick facade to be replaced in kind on south and east elevations 3. remove exiting exterior finishes to be replaced in kind to allow for seismic upgrade under pa# 2023-0620-0459 4. no grade changesDetails
1.revision to pa#2023-0620-0459 - increase scope of brick veneer removal 2. remove brick facade to be replaced in kind on south and east elevations 3. remove exiting exterior finishes to be replaced in kind to allow for seismic upgrade under pa# 2023-0620-0459 4. no grade changes | $65,000 |
| Jan 23, 2024 | In progress issued Feb 2024 | 555 El Camino Del Mar | Fma Builders | phase 2 - due to water damage replace exterior cladding, (e) windows & (e) doors in-kind per plan. parapet roof cladding replacement for new waterproofing. replace (e) steel stair & railing @ rear deckDetails
phase 2 - due to water damage replace exterior cladding, (e) windows & (e) doors in-kind per plan. parapet roof cladding replacement for new waterproofing. replace (e) steel stair & railing @ rear deck | $150,000 |
| Oct 19, 2023 | In progress issued Oct 2023 | 3355 Pacific Av | Fma Builders | exporatory demo at exterior rear portico to determine below grade condictions, including struture, soil, and utilities.Details
exporatory demo at exterior rear portico to determine below grade condictions, including struture, soil, and utilities. | $4,000 |
| Oct 17, 2023 | Completed final sign-off Nov 2023 | 2506 Leavenworth St | Fma Builders | revision to permit # 202112174639 to correct the address to 2506a leavenworth st.Details
revision to permit # 202112174639 to correct the address to 2506a leavenworth st. | |
| Oct 2, 2023 | In progress issued Oct 2023 | 2828 Vallejo St | Van Acker Const Assoc Inc, Fma Builders | remove unreinforced brick chimney & cap on north side. remove (e) exterior brick on lower levels as noted.Details
remove unreinforced brick chimney & cap on north side. remove (e) exterior brick on lower levels as noted. | $60,000 |
| Jun 20, 2023 | In progress issued Jan 2024 | 2828 Vallejo St | Van Acker Const Assoc Inc, Fma Builders | increasing sf of subbasement level, reconfigure interior & lower floor 6'8". increase sf of basement level. reconfifure interior & lower fl 2'-6'2".Details
increasing sf of subbasement level, reconfigure interior & lower floor 6'8". increase sf of basement level. reconfifure interior & lower fl 2'-6'2". | $646,451 |
| May 3, 2023 | Completed final sign-off Nov 2023 | 2506 Leavenworth St | Fma Builders | on the west and east walls of the rear yard light well, the exterior stucco is to be prepared/replaced in kind. 530 sq ft maxDetails
on the west and east walls of the rear yard light well, the exterior stucco is to be prepared/replaced in kind. 530 sq ft max | $20,000 |
| Apr 12, 2023 | Completed final sign-off Nov 2023 | 2506 Leavenworth St | Fma Builders | an existing fence is to be altered to allow for a higher pop elevation along the two side property lins. in the rear yard of an existing home. the new height of the fence is to apprroximately aligh with the height of the existing fences on both neighoring propertiesDetails
an existing fence is to be altered to allow for a higher pop elevation along the two side property lins. in the rear yard of an existing home. the new height of the fence is to apprroximately aligh with the height of the existing fences on both neighoring properties | $10,000 |
| Nov 22, 2022 | Completed final sign-off Jul 2023 | 100 Locust St | Fma Builders | revision to bpa#202106142366. addition of bathroom @ ground floor & room divider for offices.Details
revision to bpa#202106142366. addition of bathroom @ ground floor & room divider for offices. | |
| Nov 15, 2022 | Completed final sign-off Jul 2023 | 100 Locust St | Fma Builders | revision to pa# 202106142366. installation of property line fence on side yard facing locust street.Details
revision to pa# 202106142366. installation of property line fence on side yard facing locust street. | $4,000 |
| Aug 19, 2022 | Completed final sign-off Sep 2022 | 3377 Pacific Av | Fma Builders | replace (e) ceder shingle in-kind, plywood sheathing and water proofing at all rear wall surfaces due to unforseen dryrot during replacement of doors and windows under pa #202202258789.Details
replace (e) ceder shingle in-kind, plywood sheathing and water proofing at all rear wall surfaces due to unforseen dryrot during replacement of doors and windows under pa #202202258789. | $4,500 |
| Aug 4, 2022 | Never finaled issued Aug 2022, no final | 130 Locust St | Fma Builders | on north wall adjacent to neighboring property, demo existing stucoo and replace with new stucco in area 1 (see photo) new skim coat in areas 1 and 2. approx 200 sqft.Details
on north wall adjacent to neighboring property, demo existing stucoo and replace with new stucco in area 1 (see photo) new skim coat in areas 1 and 2. approx 200 sqft. | $5,000 |
| Jul 6, 2022 | Completed final sign-off Aug 2022 | 3414 Washington St | Fma Builders | installation of hot tub at 4th fl terrace. ref renovation approval under 2007 0119 2018 s1r1Details
installation of hot tub at 4th fl terrace. ref renovation approval under 2007 0119 2018 s1r1 | $7,000 |
| Jun 14, 2022 | Completed final sign-off Nov 2023 | 2506 Leavenworth St | Fma Builders | revision to 202112174639. the revision is to leave the (e) walls at the (e) bathroom in place. this also reduces the requirment for structural work in this area. the kitchenette will be moved to the previous location. no other changes are proposed.Details
revision to 202112174639. the revision is to leave the (e) walls at the (e) bathroom in place. this also reduces the requirment for structural work in this area. the kitchenette will be moved to the previous location. no other changes are proposed. | |
| Feb 25, 2022 | Completed final sign-off Sep 2022 | 3377 Pacific Av | Fma Builders | replacement of extg wood windows and doors on the rear elevation with new in steel. no change on sizes or functions.Details
replacement of extg wood windows and doors on the rear elevation with new in steel. no change on sizes or functions. | $12,000 |
| Dec 17, 2021 | Completed final sign-off Aug 2022 | 3233 Jackson St | Fma Builders | interior renovation for one kitchen and two baths. no walls moved, no wall stud framing demo.Details
interior renovation for one kitchen and two baths. no walls moved, no wall stud framing demo. | $30,000 |
| Oct 20, 2021 | Completed final sign-off Dec 2022 | 35 Linda St | Fma Builders | unit#37: interior remodel of (e) kithen, pantry, power rm, guest bathroom, guest bedroom, primary bathroom, and exterior bar at g/f rear yardDetails
unit#37: interior remodel of (e) kithen, pantry, power rm, guest bathroom, guest bedroom, primary bathroom, and exterior bar at g/f rear yard | $50,000 |
| Aug 23, 2021 | Never finaled issued Sep 2021, no final | 3355 Pacific Av | Fma Builders, Moroso Construction Inc | interior remodel including relocation of several interior partitions, remaking of stairs flight between 1st and 2nd floors and excavation at the elevator pit to allow for a lowered landing at the level of the 1st floor(elimination of an intermdiate landing at the stair flight.Details
interior remodel including relocation of several interior partitions, remaking of stairs flight between 1st and 2nd floors and excavation at the elevator pit to allow for a lowered landing at the level of the 1st floor(elimination of an intermdiate landing at the stair flight. | $1,230,000 |
| Apr 15, 2021 | Completed final sign-off Aug 2021 | 2574 Green St | Fma Builders | partial conversion of (e) closet into (n) bathroom.Details
partial conversion of (e) closet into (n) bathroom. | $7,500 |
| Feb 25, 2021 | Completed final sign-off Oct 2021 | 2411 Washington St | Joel Mark, Fma Builders | renew bpa#200912243820 for final inspection. all work is completedDetails
renew bpa#200912243820 for final inspection. all work is completed | |
| Feb 23, 2021 | Never finaled issued May 2023, no final | 2760 Divisadero St | Fma Builders | extension of 4th level rear deck over (e) flat roof including new railings. no added square footage. no changes to building envelope.Details
extension of 4th level rear deck over (e) flat roof including new railings. no added square footage. no changes to building envelope. | $6,000 |
| Feb 12, 2021 | Completed final sign-off Feb 2022 | 555 El Camino Del Mar | Fma Builders | permit to memorialize placement of replacement hvac units on roof. not visible from publice row. ref pa$ 202008222435.Details
permit to memorialize placement of replacement hvac units on roof. not visible from publice row. ref pa$ 202008222435. | |
| Nov 13, 2020 | Completed final sign-off Jul 2023 | 100 Locust St | Fma Builders | revision to pa 201707101327. change of storage to media room. addition of laundry and finished flooring.Details
revision to pa 201707101327. change of storage to media room. addition of laundry and finished flooring. | |
| Oct 30, 2020 | Never finaled issued Oct 2020, no final | 947 Green St | Fma Builders | unit 8 kitchen and bath remodel. new flooring subfloor remains. infill one door between entryance hall and kitchen. egress not affected. per fergal clancyDetails
unit 8 kitchen and bath remodel. new flooring subfloor remains. infill one door between entryance hall and kitchen. egress not affected. per fergal clancy | $25,000 |
| Aug 22, 2020 | Completed final sign-off Feb 2022 | 555 El Camino Del Mar | Fma Builders | replacement of exterior cladding and (e) windows due to ongoing water damage. remove all (e) stucco finish down to (e) sheathing layer, removing and replacing all windows and doors within (e) openings. (e) roof tower from 1997 to be replaced. no change in roof height.Details
replacement of exterior cladding and (e) windows due to ongoing water damage. remove all (e) stucco finish down to (e) sheathing layer, removing and replacing all windows and doors within (e) openings. (e) roof tower from 1997 to be replaced. no change in roof height. | $100,000 |
| Jun 26, 2020 | Completed final sign-off Jun 2024 | 632 El Camino Del Mar | Fma Builders | to recommence work approved under pa 2014-0415-3260 & 2014-0605-7649Details
to recommence work approved under pa 2014-0415-3260 & 2014-0605-7649 | $238,000 |
| Jun 26, 2020 | Completed final sign-off Jun 2024 | 632 El Camino Del Mar | Fma Builders | to recommence work approved under pa 2015-1125-3600, 2016-1121-3218 & 2017-0928-9842Details
to recommence work approved under pa 2015-1125-3600, 2016-1121-3218 & 2017-0928-9842 | $105,011 |
| Jun 26, 2020 | Completed final sign-off Jul 2022 | 632 El Camino Del Mar | Fma Builders | to obtain final inspection for work approved under pa 2015-0211-8046. all work is completeDetails
to obtain final inspection for work approved under pa 2015-0211-8046. all work is complete | |
| Jun 26, 2020 | Completed final sign-off May 2024 | 632 El Camino Del Mar | Fma Builders | to recommence work approved under pa 2016-0526-8516Details
to recommence work approved under pa 2016-0526-8516 | $70,000 |
| Feb 4, 2020 | Never finaled issued Feb 2020, no final | 2760 Divisadero St | Fma Builders | shoring of the existing 3 story wood structure to remain during the proposed foundation replacement pa #2019-1018-4960. pedestrian protection and encroachment under seperate permit with bsmDetails
shoring of the existing 3 story wood structure to remain during the proposed foundation replacement pa #2019-1018-4960. pedestrian protection and encroachment under seperate permit with bsm | $200,000 |
| Jan 10, 2020 | Completed final sign-off Nov 2020 | 947 Green St | Fma Builders | #5 - removal of interior door and patch with drywall, refinish wood floors, install flue exhaust fan at rooftop flue capDetails
#5 - removal of interior door and patch with drywall, refinish wood floors, install flue exhaust fan at rooftop flue cap | $21,000 |
| Nov 12, 2019 | Never finaled issued Jul 2021, no final | 2760 Divisadero St | Fma Builders | interior renovation work on (e) upper (4) levels, replace exterior stucco & (n) windows, doors, rustication & railing to exterior facades. structural work included. retain building envelope & roofline. no work at the (2) basement levels. ** maher: n/a **Details
interior renovation work on (e) upper (4) levels, replace exterior stucco & (n) windows, doors, rustication & railing to exterior facades. structural work included. retain building envelope & roofline. no work at the (2) basement levels. ** maher: n/a ** | $1,500,000 |
| Oct 18, 2019 | Never finaled issued Feb 2020, no final | 2760 Divisadero St | Fma Builders | revision to 201812208895: same scope with smaller excavation. workshop changed to gym (excavation and finishes to enlarge basement and garage) all exterior changes per approved on prior permit. structural changes. no work on e upper 4 levelsDetails
revision to 201812208895: same scope with smaller excavation. workshop changed to gym (excavation and finishes to enlarge basement and garage) all exterior changes per approved on prior permit. structural changes. no work on e upper 4 levels | |
| Jun 19, 2019 | Completed final sign-off Mar 2022 | 200 Walnut St | Fma Builders | interior renovation at 3rd fl, replace facade windows w/new windows, reroof skylight at dormer, repair water damage at parapet and reslope roof to prevent future damage, remove (e) windscreen at 3rd flr roof deck and replace w/ new railingDetails
interior renovation at 3rd fl, replace facade windows w/new windows, reroof skylight at dormer, repair water damage at parapet and reslope roof to prevent future damage, remove (e) windscreen at 3rd flr roof deck and replace w/ new railing | $200,000 |
| Jun 5, 2019 | Completed final sign-off Jun 2019 | 320 Seacliff Av | Fma Builders | to obtain final inspection for work approved under pa 201211264807. all work is completeDetails
to obtain final inspection for work approved under pa 201211264807. all work is complete | |
| Feb 13, 2019 | Completed final sign-off Jun 2022 | 632 El Camino Del Mar | Fma Builders | to obtain final inspection for work approved under pa#2014-0507-5160, 2015-1001-8571, 2015-1102-1435. all work is complete.Details
to obtain final inspection for work approved under pa#2014-0507-5160, 2015-1001-8571, 2015-1102-1435. all work is complete. | |
| Feb 13, 2019 | Expired or cancelled expired Jun 2024 | 632 El Camino Del Mar | Fma Builders | to obtain final inspection for work approved under pa#2015-0211-8046, 2016-0526-8516,2016-1121-3218. all work is complete.Details
to obtain final inspection for work approved under pa#2015-0211-8046, 2016-0526-8516,2016-1121-3218. all work is complete. | |
| Feb 13, 2019 | Completed final sign-off Jun 2022 | 632 El Camino Del Mar | Fma Builders | to obtain final inspection for work approved under pa#2013-1021-9818, 2017-0118-7425, 2018-0222-9857. all work is complete.Details
to obtain final inspection for work approved under pa#2013-1021-9818, 2017-0118-7425, 2018-0222-9857. all work is complete. | |
| Feb 13, 2019 | Expired or cancelled expired Jun 2024 | 632 El Camino Del Mar | Fma Builders | to obtain final inspection for work approved under pa#2016-0913-7530, 2017-0313-1273. all work is complete.Details
to obtain final inspection for work approved under pa#2016-0913-7530, 2017-0313-1273. all work is complete. | |
| Feb 13, 2019 | Expired or cancelled expired Jun 2024 | 632 El Camino Del Mar | Fma Builders | to obtain final inspection for work approved under pa#2015-11-25-3600. all work is complete.Details
to obtain final inspection for work approved under pa#2015-11-25-3600. all work is complete. | |
| Feb 13, 2019 | Completed final sign-off Jun 2024 | 632 El Camino Del Mar | Fma Builders | to obtain final inspection for work approved under pa#2014-0415-3260, 2014-0605-7649. all work is complete.Details
to obtain final inspection for work approved under pa#2014-0415-3260, 2014-0605-7649. all work is complete. | |
| Jan 29, 2019 | Completed final sign-off Jul 2023 | 100 Locust St | Fma Builders | abatement of asbestos & lead per bench mark hazardous material survey date 1/15/19 work includes removal of contaminated materials replacement of sheetrock where asbestos is presentDetails
abatement of asbestos & lead per bench mark hazardous material survey date 1/15/19 work includes removal of contaminated materials replacement of sheetrock where asbestos is present | $25,000 |
| Dec 21, 2018 | Completed final sign-off Jun 2022 | 632 El Camino Del Mar | Fma Builders | replace extg wood windows in kind, nw exterior stucco to match extg, extend extg hallway at basement. remove extg window on e elevation at basement, add single door & pair of door at basement, replace garage door & remove garage wndw. remove e gas appliances @ family room, 3 nw windows @ w elevationDetails
replace extg wood windows in kind, nw exterior stucco to match extg, extend extg hallway at basement. remove extg window on e elevation at basement, add single door & pair of door at basement, replace garage door & remove garage wndw. remove e gas appliances @ family room, 3 nw windows @ w elevation | $250,000 |
| Dec 18, 2018 | Completed final sign-off Jul 2020 | 3475 Jackson St | Fma Builders | rev to pa# 201612225715 & 201805219676; structural revisions per as built conditionsDetails
rev to pa# 201612225715 & 201805219676; structural revisions per as built conditions | |
| Aug 24, 2018 | Completed final sign-off Oct 2018 | 3467 Jackson St | Fma Builders | partial foundation replacement. n/a for maher.Details
partial foundation replacement. n/a for maher. | $4,000 |
| Jul 12, 2018 | Never finaled issued Sep 2018, no final | 3375 Clay St | Fma Builders, Add A Garage Inc. | partial foundation replacementDetails
partial foundation replacement | $30,000 |
| Jun 7, 2018 | Completed final sign-off Jun 2018 | 290 Maple St | Fma Builders | revision to permit #201408295116 to reflect removing elevator/penthous from scope of work.Details
revision to permit #201408295116 to reflect removing elevator/penthous from scope of work. | |
| May 21, 2018 | Completed final sign-off Jul 2020 | 3475 Jackson St | Fma Builders | revision to 2016122225715. reduction in proposed basement floor planDetails
revision to 2016122225715. reduction in proposed basement floor plan | |
| May 3, 2018 | Completed final sign-off Mar 2019 | 555 El Camino Del Mar | Fma Builders | new stucco w/wall mounted fountain to screen (e) gate. located at rear of property.Details
new stucco w/wall mounted fountain to screen (e) gate. located at rear of property. | $5,000 |
| Mar 14, 2018 | Completed final sign-off May 2018 | 615 Sanchez St | Fma Builders | roof parapet and stucco repair due to water infiltration limited replacement of dry rot framing members - 40 linear feet of a 4 foot parapet. 12 by 12 area of the roof membrane - 700 square feet at face of structure - stucco repairDetails
roof parapet and stucco repair due to water infiltration limited replacement of dry rot framing members - 40 linear feet of a 4 foot parapet. 12 by 12 area of the roof membrane - 700 square feet at face of structure - stucco repair | $20,000 |
| Feb 27, 2018 | Never finaled issued Mar 2018, no final | 3383 Clay St | Fma Builders | revision to pa 2015-1214-5080 & 2017-0317-1713 - changing rear deck stairs from westside of property to east; add (n) bathroom chase; change 5 casemtn windows on side to single (fixed); change elec to gas fireplace. replace (e) siding with new matchingDetails
revision to pa 2015-1214-5080 & 2017-0317-1713 - changing rear deck stairs from westside of property to east; add (n) bathroom chase; change 5 casemtn windows on side to single (fixed); change elec to gas fireplace. replace (e) siding with new matching | $20,000 |
| Jan 9, 2018 | Completed final sign-off Apr 2018 | 555 El Camino Del Mar | Fma Builders | to comply with nov 201726145 - change (e) double swing auto gate to automatic sliding gate. relocate trash enclosure near to gate. new privacy wall w/outdoor kitchen grill & sink. no change to bldg/no expansion of envelope.Details
to comply with nov 201726145 - change (e) double swing auto gate to automatic sliding gate. relocate trash enclosure near to gate. new privacy wall w/outdoor kitchen grill & sink. no change to bldg/no expansion of envelope. | $8,000 |
| Sep 28, 2017 | Expired or cancelled expired Jun 2024 | 632 El Camino Del Mar | Fma Builders | revision to #201511253600 & #201611213218. remove 369 cubic yards of soil to lower storage, bathroom & patio to new level, create new water features. thicken property line fences. north of gridlines l.4 reduce size of new infinity spa/pool. deferred mep. maher ord. no. 155-13Details
revision to #201511253600 & #201611213218. remove 369 cubic yards of soil to lower storage, bathroom & patio to new level, create new water features. thicken property line fences. north of gridlines l.4 reduce size of new infinity spa/pool. deferred mep. maher ord. no. 155-13 | |
| Jul 24, 2017 | Completed final sign-off Jun 2018 | 290 Maple St | Fma Builders | revision to pa#201408295116 to correct erroneous note. n/a ordinance #155-13Details
revision to pa#201408295116 to correct erroneous note. n/a ordinance #155-13 | |
| Jul 10, 2017 | Completed final sign-off Jul 2023 | 100 Locust St | Fma Builders | demolish 1-story garageDetails
demolish 1-story garage | $10,000 |
| Jul 10, 2017 | Completed final sign-off Jul 2023 | 100 Locust St | Fma Builders | demolition of (e) rear yard w/ seismic upgrade to the main residence. renovation of primary & secondary facades, horizontal expansion to the south & unificationof (e) top floor volumes.Details
demolition of (e) rear yard w/ seismic upgrade to the main residence. renovation of primary & secondary facades, horizontal expansion to the south & unificationof (e) top floor volumes. | $2,000,000 |
| Mar 17, 2017 | Never finaled issued Mar 2017, no final | 3383 Clay St | Fma Builders | altered site permit to 201512145080 reducing scope. work will include new rear bay window at 3rd level, new deck at 2nd level with new staircase to rear yard, interior renovation and associated structural work. note: 2013 code iterations remain applicable cm 3-22-17Details
altered site permit to 201512145080 reducing scope. work will include new rear bay window at 3rd level, new deck at 2nd level with new staircase to rear yard, interior renovation and associated structural work. note: 2013 code iterations remain applicable cm 3-22-17 | |
| Mar 10, 2017 | Never finaled issued Apr 2017, no final | 290 Collingwood St | Fma Builders | landscape renovation for rear extentsion new wood deck, new wood fence, new guardrail. irrigation and low voltage landscape lighting update.Details
landscape renovation for rear extentsion new wood deck, new wood fence, new guardrail. irrigation and low voltage landscape lighting update. | $20,000 |
| Mar 8, 2017 | Completed final sign-off Jun 2018 | 290 Maple St | Fma Builders | rev to pa#201408295116: to replace/repair (e) framing/foundation.Details
rev to pa#201408295116: to replace/repair (e) framing/foundation. | |
| Feb 22, 2017 | Completed final sign-off Jun 2024 | 700 El Camino Del Mar | Fma Builders | underpining related to work at 632 el camino - approved under pa 2015-1125-3600 & 2017-0118-7425. cost of work carried under previous permits. scope previously approved this is to memorialize work under adjacent addressDetails
underpining related to work at 632 el camino - approved under pa 2015-1125-3600 & 2017-0118-7425. cost of work carried under previous permits. scope previously approved this is to memorialize work under adjacent address | |
| Jan 18, 2017 | Expired or cancelled expired Jun 2024 | 632 El Camino Del Mar | Fma Builders | shoring revision for 201511021435. no other workDetails
shoring revision for 201511021435. no other work | |
| Dec 22, 2016 | Completed final sign-off Mar 2018 | 290 Collingwood St | Fma Builders | kitchen renovation of cabinets, fixtures, finishes, no change to configuration. no structural or exterior work.Details
kitchen renovation of cabinets, fixtures, finishes, no change to configuration. no structural or exterior work. | $50,000 |
| Dec 22, 2016 | Completed final sign-off Jul 2020 | 3475 Jackson St | Fma Builders | expansion & renovation on all floors, excavation in order to expand basement below grade, replacement of windows at rear & side of bldg, no change to front facade.Details
expansion & renovation on all floors, excavation in order to expand basement below grade, replacement of windows at rear & side of bldg, no change to front facade. | $800,000 |
| Nov 21, 2016 | Completed final sign-off Jul 2022 | 632 El Camino Del Mar | Fma Builders | replace e fences at east and west property lines with new stucco wall. no construction on house. exterior work only maher not reqDetails
replace e fences at east and west property lines with new stucco wall. no construction on house. exterior work only maher not req | $10,000 |
| Aug 25, 2016 | Completed final sign-off Jan 2017 | 555 El Camino Del Mar | Fma Builders | remove (e) walls, sauna & bathroom. relocate (n)bathroom in (e) wine room; (n) structural sheer wall. all work on 1st floor. no exterior work or expansion of building envelope.Details
remove (e) walls, sauna & bathroom. relocate (n)bathroom in (e) wine room; (n) structural sheer wall. all work on 1st floor. no exterior work or expansion of building envelope. | $50,000 |
| May 26, 2016 | Expired or cancelled expired May 2024 | 632 El Camino Del Mar | Fma Builders | exterior changes to exterior driveway, pathway and new gate at front path and driveway, alteration to interior courtyard wall of building. n/a for maherDetails
exterior changes to exterior driveway, pathway and new gate at front path and driveway, alteration to interior courtyard wall of building. n/a for maher | $15,000 |
| Apr 8, 2016 | Completed final sign-off Jan 2017 | 555 El Camino Del Mar | Fma Builders | (n) hardwood floors, paint (n) sconces and repairto drywall and subfloo as needed. no exterior work.Details
(n) hardwood floors, paint (n) sconces and repairto drywall and subfloo as needed. no exterior work. | $7,500 |
| Apr 7, 2016 | Completed final sign-off Jun 2017 | 2845 Lake St | Fma Builders | interior remodel of existing basement, new bedroom, full bath, media room. dropping floor to increase ceiling height, new lightwells, infilling under existing grate level patio. replacing floor finish and on 1st fl and bath remodel on 2nd flDetails
interior remodel of existing basement, new bedroom, full bath, media room. dropping floor to increase ceiling height, new lightwells, infilling under existing grate level patio. replacing floor finish and on 1st fl and bath remodel on 2nd fl | $250,000 |
| Mar 23, 2016 | Completed final sign-off Feb 2017 | 1919 Sacramento St | Fma Builders | revision to pa 2015-0831-5656 including addition of structural details.Details
revision to pa 2015-0831-5656 including addition of structural details. | |
| Dec 14, 2015 | Never finaled issued Mar 2017, no final | 3383 Clay St | Fma Builders | horizonal addition @ rear yard & east side of 1st, 2nd & 3rd level. vertical addition @ 4th level with (n) deck. (n) deck @ 2nd level w/ (n) staircase to rear backyard. all other work under separate permit.Details
horizonal addition @ rear yard & east side of 1st, 2nd & 3rd level. vertical addition @ 4th level with (n) deck. (n) deck @ 2nd level w/ (n) staircase to rear backyard. all other work under separate permit. | $150,000 |
| Nov 25, 2015 | Expired or cancelled expired May 2024 | 632 El Camino Del Mar | Fma Builders | create (n) 2002 sq ft of subterranean uninhabitable space at rear yard, including (n) utility room, storage room, powder room, (n) infinity spa/pool, water feature & rear yard patio areaDetails
create (n) 2002 sq ft of subterranean uninhabitable space at rear yard, including (n) utility room, storage room, powder room, (n) infinity spa/pool, water feature & rear yard patio area | $200,000 |
| Nov 9, 2015 | Completed final sign-off Oct 2016 | 260 Seacliff Av | Fma Builders | replace corrode handrail @ rear of property with new stainless steel handrail. n/a ordinance #155-13Details
replace corrode handrail @ rear of property with new stainless steel handrail. n/a ordinance #155-13 | $2,500 |
| Nov 2, 2015 | Completed final sign-off Jul 2022 | 632 El Camino Del Mar | Fma Builders, Bill Brown Construction | shoring associated with rear yard improvements. maher naDetails
shoring associated with rear yard improvements. maher na | $75,000 |
| Oct 1, 2015 | Completed final sign-off Jun 2022 | 632 El Camino Del Mar | Fma Builders | phase 2 of earth retention & shoring work for construction work approved under pa 2014-0605-7649. phase 1 was approved under pa 2014-0507-5160 with shoring 2014-0415-3260 . maher naDetails
phase 2 of earth retention & shoring work for construction work approved under pa 2014-0605-7649. phase 1 was approved under pa 2014-0507-5160 with shoring 2014-0415-3260 . maher na | |
| Aug 6, 2015 | Completed final sign-off Nov 2015 | 3450 21st St | Fma Builders | revision to (e) permitted 4th floor roof terrace guardrail per inspector comments. weld on stanchions and add additional 1'-7" glass guardrail top of (e) railing. not visible from public right of way. ref pa 2014 0602 7185. maher naDetails
revision to (e) permitted 4th floor roof terrace guardrail per inspector comments. weld on stanchions and add additional 1'-7" glass guardrail top of (e) railing. not visible from public right of way. ref pa 2014 0602 7185. maher na | $5,000 |
| Jun 23, 2015 | Completed final sign-off Feb 2017 | 1919 Sacramento St | Fma Builders, Design Line Construction | residential remodel. incl removing (e) chimney. (n) dormers and (n) windows, interior work and any related structural work. one added bathroom. vertical addition (dormers)Details
residential remodel. incl removing (e) chimney. (n) dormers and (n) windows, interior work and any related structural work. one added bathroom. vertical addition (dormers) | $50,000 |
| Feb 18, 2015 | Completed final sign-off Aug 2015 | 2586 Clay St | Fma Builders | reroof exterior deck, repair/replace water proofing and covering for deck and stair. replace wood railing as reqDetails
reroof exterior deck, repair/replace water proofing and covering for deck and stair. replace wood railing as req | $30,000 |
| Feb 11, 2015 | Completed final sign-off Jun 2022 | 632 El Camino Del Mar | Fma Builders | (n) ext. retaining wall in front of (e) retaining wall located along rear property line, abutting 455 & 475 seacliff ave shoring & buttressing of (e) wall to be provided as needed during construction; backfill (e) wall to (e) grade. maher n/aDetails
(n) ext. retaining wall in front of (e) retaining wall located along rear property line, abutting 455 & 475 seacliff ave shoring & buttressing of (e) wall to be provided as needed during construction; backfill (e) wall to (e) grade. maher n/a | $10,000 |
| Feb 11, 2015 | Expired or cancelled withdrawn May 2015 | 455 Seacliff Av | Fma Builders | (n) retaining wall in front of (e) retaining wall located along rear property line of 632 el camino del mar abutting this property. shoring & buttressing of (e) wall to be provided as needed during construction.Details
(n) retaining wall in front of (e) retaining wall located along rear property line of 632 el camino del mar abutting this property. shoring & buttressing of (e) wall to be provided as needed during construction. | $10,000 |
| Feb 11, 2015 | Completed final sign-off Jun 2024 | 475 Seacliff Av | Fma Builders | (n) retaining wall in front of (e) retaining wall located along rear property line of 632 el camino del mar abutting this property. shoring & buttressing of (e) wall to be provided as needed during construction; backfill (e) wall to (e) grade. backfill (e) wall to (e) grade. maher n/aDetails
(n) retaining wall in front of (e) retaining wall located along rear property line of 632 el camino del mar abutting this property. shoring & buttressing of (e) wall to be provided as needed during construction; backfill (e) wall to (e) grade. backfill (e) wall to (e) grade. maher n/a | $10,000 |
| Jan 23, 2015 | Completed final sign-off May 2015 | 1141 Filbert St | Fma Builders | to obtain final inspection for work approved under pa# 200906160537, all work is complete.Details
to obtain final inspection for work approved under pa# 200906160537, all work is complete. | |
| Jan 13, 2015 | Completed final sign-off Aug 2015 | 2586 Clay St | Fma Builders | repair and replace shiplap siding in-kind (10" channel horizontal), replace waterproofing membrane & flashing as required.Details
repair and replace shiplap siding in-kind (10" channel horizontal), replace waterproofing membrane & flashing as required. | $12,000 |
| Jan 12, 2015 | Completed final sign-off Aug 2015 | 2586 Clay St | Fma Builders | modification to approved app #201404284370. change is to raise roof 20" to accomodate ceiling height & sloped roof to drainage curb.Details
modification to approved app #201404284370. change is to raise roof 20" to accomodate ceiling height & sloped roof to drainage curb. | $10,000 |
| Jan 8, 2015 | Completed final sign-off Aug 2015 | 246 22nd Av | Fma Builders | alterations to existing exterior openings erplace existing exterior stair with new deck & stair. new powder room at 1st floor. associated sturctural work.Details
alterations to existing exterior openings erplace existing exterior stair with new deck & stair. new powder room at 1st floor. associated sturctural work. | $35,000 |
| Dec 22, 2014 | Completed final sign-off Jul 2015 | 246 22nd Av | Fma Builders | voluntary seismic upgrade @ rear wall, int t.i. work at rear of bldg including (n) furring, insulation, framing & sheating, install (n) elec fixtures.Details
voluntary seismic upgrade @ rear wall, int t.i. work at rear of bldg including (n) furring, insulation, framing & sheating, install (n) elec fixtures. | $20,000 |
| Oct 24, 2014 | Completed final sign-off Oct 2015 | 3450 21st St | Fma Builders | add air conditioning to house. condensers mounted on platform behind existing roof ridges and not visible from street. platform includes visual acoustical shroud, shall comply with all sf noise ordinance requirementsDetails
add air conditioning to house. condensers mounted on platform behind existing roof ridges and not visible from street. platform includes visual acoustical shroud, shall comply with all sf noise ordinance requirements | $35,000 |
| Oct 21, 2014 | Completed final sign-off Oct 2014 | 3450 21st St | Fma Builders | readjustment of project valuation for 201301228447. additional 108,000 value per bid inspector clancy. total cost: 173,000Details
readjustment of project valuation for 201301228447. additional 108,000 value per bid inspector clancy. total cost: 173,000 | $108,000 |
| Aug 29, 2014 | Completed final sign-off Jun 2018 | 290 Maple St | Fma Builders | horizontal extension of 3'-2" at east facade on all stories. infill of east facade lightwell. new elevator. elevator penthouse below (e) ridge. replace interior stairs. interior remodel including kitchen & baths. ** maher: compliance with ordinance no# 155-13 not required **Details
horizontal extension of 3'-2" at east facade on all stories. infill of east facade lightwell. new elevator. elevator penthouse below (e) ridge. replace interior stairs. interior remodel including kitchen & baths. ** maher: compliance with ordinance no# 155-13 not required ** | $100,000 |
| Jul 30, 2014 | Completed final sign-off Jan 2015 | 200 Walnut St | Fma Builders | due to poor structural conditions in the field under 201405226535 structural remediation required. work includes reinforcement of floor joists at master bath and closet. add new member to ex faming for structural improvement. structural work only. no exterior workDetails
due to poor structural conditions in the field under 201405226535 structural remediation required. work includes reinforcement of floor joists at master bath and closet. add new member to ex faming for structural improvement. structural work only. no exterior work | $22,000 |