Block 0612, lot 030
2411 Washington St
- City’s use
- Single Family Residential
- Built
- 1900
- Stories
- 3
- Units
- 1
- Rooms
- 5 bedrooms, 3 bathrooms
- Building
- 3,030 sq ft
- Lot
- 3,320 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 20, 2023 | Never finaled filed Apr 2023, never issued | 2411 Washington St | Crown Construction San Francisco | lower level revised structural drawings to include backyard concrete. all else to remain revision to 2022210144354, 202302071513 to comply with nov 202306341. lower level concrete to proide new footing along lot lime beneath e structureDetails
lower level revised structural drawings to include backyard concrete. all else to remain revision to 2022210144354, 202302071513 to comply with nov 202306341. lower level concrete to proide new footing along lot lime beneath e structure | $3,000 |
| Feb 7, 2023 | Completed final sign-off Apr 2024 | 2411 Washington St | Crown Construction San Francisco | excavate lower level to gain additional 12"ceiling height from 7 feet to 8 feet. revision to pa# 202210144354,Details
excavate lower level to gain additional 12"ceiling height from 7 feet to 8 feet. revision to pa# 202210144354, | $65,000 |
| Oct 14, 2022 | Completed final sign-off Apr 2024 | 2411 Washington St | Crown Construction San Francisco | lower level improvement & structural strengthening at 1st story; main & upper level improvements kitchen cabinets, flooring, paint & bath tile, paintDetails
lower level improvement & structural strengthening at 1st story; main & upper level improvements kitchen cabinets, flooring, paint & bath tile, paint | $150,000 |
| Feb 25, 2021 | Completed final sign-off Oct 2021 | 2411 Washington St | Joel Mark, Fma Builders | renew bpa#200912243820 for final inspection. all work is completedDetails
renew bpa#200912243820 for final inspection. all work is completed | |
| Feb 8, 2010 | Never finaled issued Feb 2010, no final | 2411 Washington St | street space permitDetails
street space permit | ||
| Jan 8, 2010 | Never finaled issued Jan 2010, no final | 2411 Washington St | street spaceDetails
street space | ||
| Dec 24, 2009 | Never finaled issued Dec 2009, no final | 2411 Washington St | S F Garage Company Inc. | remodel (2) bedrooms, (1) laundry, (1) kitchen, 50% or less of dry rot in rear deck, new boiler in garage and dyronic (heater) system. replace in kind for deck. no structural work. new light. boiler shall meet efficiency reqd. by title 24. h.e. lights per title 24.Details
remodel (2) bedrooms, (1) laundry, (1) kitchen, 50% or less of dry rot in rear deck, new boiler in garage and dyronic (heater) system. replace in kind for deck. no structural work. new light. boiler shall meet efficiency reqd. by title 24. h.e. lights per title 24. | $20,000 |
| Oct 30, 2009 | Completed final sign-off Dec 2009 | 2411 Washington St | S F Garage Company Inc. | enlarge e 6'6 wide garage entryway to 8'4 wide. provide n stem wall, column, and beam/connector. provide new garage doorDetails
enlarge e 6'6 wide garage entryway to 8'4 wide. provide n stem wall, column, and beam/connector. provide new garage door | $8,000 |
| Aug 2, 2002 | Completed final sign-off Sep 2002 | 2411 Washington St | Arnest Termite Control | comply w/termite report #5149 sated 6/14/02 repair faluty grade, doorway,Details
comply w/termite report #5149 sated 6/14/02 repair faluty grade, doorway, | $20,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Crown Construction San Francisco (3), S F Garage Company Inc. (2), Arnest Termite Control, Fma Builders, Joel Mark
- Engineers
- Timothy Huang (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.