David Swetz
- Listed as
- architect, authorized agent-others
- Firm
- Swetzshop
- Based in
- San Francisco
- On San Francisco permits
- Oct 2010 to Aug 2026
26 permits since 2000 (architect on 19 permits, authorized agent-others on 7 permits): 16 completed, 4 in progress, 4 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 10, 2026 | In progress issued Aug 2026 | 158 Carmel St | 2/f kitchen remodel; non-structural partitions removed: window replacement in-kind.Details
2/f kitchen remodel; non-structural partitions removed: window replacement in-kind. | $5,500 | |
| Jun 16, 2026 | In progress issued Jul 2026 | 143 Buena Vista East Av | Crown Construction San Francisco | electrical rewire, interior remodel to include bathroom and kitchen remodel, replace (e) staircase and remove and infill secondary staircaseDetails
electrical rewire, interior remodel to include bathroom and kitchen remodel, replace (e) staircase and remove and infill secondary staircase | $275,000 |
| May 15, 2026 | In progress issued Jun 2026 | 318 Scott St | Egoodat Inc | unit 318- kitchen and bathroom remodel to include (n) skylights, window replacement in kind not visible from street.Details
unit 318- kitchen and bathroom remodel to include (n) skylights, window replacement in kind not visible from street. | $65,000 |
| Apr 10, 2025 | Completed final sign-off Mar 2026 | 130 Madrone Av | Clonduff Construction Inc. | window and siding replacement in kind. interior remodel. modify existing exterior rear deck. no building envelope expansionDetails
window and siding replacement in kind. interior remodel. modify existing exterior rear deck. no building envelope expansion | $650,000 |
| Nov 8, 2024 | Completed final sign-off Mar 2026 | 130 Madrone Av | Clonduff Construction Inc. | kitchen and bathroom remodel in kindDetails
kitchen and bathroom remodel in kind | $125,000 |
| Oct 9, 2024 | In progress issued Oct 2025 | 881 Foerster St | Clonduff Construction Inc. | rev 202304175823- remove (e) balcony. revise layout of bathroom remodelDetails
rev 202304175823- remove (e) balcony. revise layout of bathroom remodel | |
| Apr 18, 2024 | Completed final sign-off Mar 2025 | 2921 California St | L H Construction | bathroom remodel, new window at east facade, nw patio door at south facade, kitchen remodel, no work visible from the street.Details
bathroom remodel, new window at east facade, nw patio door at south facade, kitchen remodel, no work visible from the street. | $95,000 |
| Nov 17, 2023 | Completed final sign-off Nov 2023 | 1234 Stanyan St | Huff Construction Company Inc | remove previously approved scope of work under pa# 2022-0708-8027 & 2023-0202-1240 per request of field inspector no new proposed workDetails
remove previously approved scope of work under pa# 2022-0708-8027 & 2023-0202-1240 per request of field inspector no new proposed work | |
| Aug 9, 2023 | Completed final sign-off Jul 2024 | 1147 Lake St | Brady Construction Inc | interior remodel; kitchen and bathroom renovation; replacement of non-front facade exterior windowsDetails
interior remodel; kitchen and bathroom renovation; replacement of non-front facade exterior windows | $95,000 |
| Apr 17, 2023 | Never finaled issued Aug 2023, no final | 881 Foerster St | Clonduff Construction Inc. | interior remodel and renovation of exterior windows and doors, enlarge e windo2ws in select locations, partial foundation replacment and seismic upgrade, no floor area, building expansion or site work0Details
interior remodel and renovation of exterior windows and doors, enlarge e windo2ws in select locations, partial foundation replacment and seismic upgrade, no floor area, building expansion or site work0 | $190,000 |
| Feb 2, 2023 | Completed final sign-off Nov 2023 | 1234 Stanyan St | Huff Construction Company Inc | revision to bpa#202207088027, adjust position of proposed skylights, provide note to fire rate window, and reframing (e) damaged & substandard framing. allwork previously approved.enlarge footing at grid line 2, replace (e) 2x10 joist at first level in area indicated in plan, replace in-kind framingDetails
revision to bpa#202207088027, adjust position of proposed skylights, provide note to fire rate window, and reframing (e) damaged & substandard framing. allwork previously approved.enlarge footing at grid line 2, replace (e) 2x10 joist at first level in area indicated in plan, replace in-kind framing | |
| Jul 8, 2022 | Expired or cancelled withdrawn Aug 2023 | 1147 Lake St | interior remodel renovation; new roof deck, replacement of non-profit facade exterior windows and doors. no foundation work; no wor; no site work; no building envelope expansion.Details
interior remodel renovation; new roof deck, replacement of non-profit facade exterior windows and doors. no foundation work; no wor; no site work; no building envelope expansion. | $155,000 | |
| Jul 8, 2022 | Completed final sign-off Nov 2023 | 1234 Stanyan St | Huff Construction Company Inc | interior remodel and renovation of kitchen, bathrooms, and laundry. replacement of one window and patio door within existing openings. new skylights. no building envelope expansion. rear stair configuration.Details
interior remodel and renovation of kitchen, bathrooms, and laundry. replacement of one window and patio door within existing openings. new skylights. no building envelope expansion. rear stair configuration. | $329,000 |
| Feb 23, 2022 | Never finaled issued Feb 2022, no final | 190 Ewing Tr | replace two (e) windows at front elevation as-shown. no structural work. no added floor area. no mechanical work.Details
replace two (e) windows at front elevation as-shown. no structural work. no added floor area. no mechanical work. | $3,000 | |
| Apr 22, 2021 | Completed final sign-off Feb 2024 | 1580 Masonic Av | Saturn Construction Co | horizontal addition and roof dormer at rear yard. replace kitchen appliances and plumbing at main house, first floor. new lighting and electrical at kitchenDetails
horizontal addition and roof dormer at rear yard. replace kitchen appliances and plumbing at main house, first floor. new lighting and electrical at kitchen | $250,000 |
| Oct 2, 2020 | Never finaled issued Nov 2020, no final | 1200 Gough St | Superb Builders Inc **See Notes** | unit 10e -interior kitchen and bathroom remodel, reconfiguration of interior partition walls; no exterior work, no structural work, no common wall work, no new or reconfiguration work of hvac systemDetails
unit 10e -interior kitchen and bathroom remodel, reconfiguration of interior partition walls; no exterior work, no structural work, no common wall work, no new or reconfiguration work of hvac system | $45,000 |
| Oct 25, 2019 | Completed final sign-off Sep 2023 | 115 Telegraph Hill Bl | Durkin Inc. | revision to addenda #3 2015-0522-7051 to modify mullion pattern only to indicate exterior windows & doors. no proposed change to opening size, dimensions or locationsDetails
revision to addenda #3 2015-0522-7051 to modify mullion pattern only to indicate exterior windows & doors. no proposed change to opening size, dimensions or locations | |
| Sep 30, 2019 | Completed final sign-off Sep 2020 | 1176 Union St | interior kitchen & bath remodel, & addition of new half bath at each unit.Details
interior kitchen & bath remodel, & addition of new half bath at each unit. | $125,000 | |
| May 29, 2019 | Expired or cancelled withdrawn Sep 2019 | 1176 Union St | lightwell infill, window replacement in kind and interior remodel. n/a for maher.Details
lightwell infill, window replacement in kind and interior remodel. n/a for maher. | $450,000 | |
| Feb 14, 2018 | Never finaled issued May 2023, no final | 2727 Vallejo St | horizontal addition to rear, excavation of basement, no change to front facade. 1 new bedroom, 2 new bathrooms. ** maher: disturbance of at least 50 cu. yd of soil. route to dph **Details
horizontal addition to rear, excavation of basement, no change to front facade. 1 new bedroom, 2 new bathrooms. ** maher: disturbance of at least 50 cu. yd of soil. route to dph ** | $2,500,000 | |
| Jul 10, 2017 | Completed final sign-off Jul 2023 | 100 Locust St | Fma Builders | demolition of (e) rear yard w/ seismic upgrade to the main residence. renovation of primary & secondary facades, horizontal expansion to the south & unificationof (e) top floor volumes.Details
demolition of (e) rear yard w/ seismic upgrade to the main residence. renovation of primary & secondary facades, horizontal expansion to the south & unificationof (e) top floor volumes. | $2,000,000 |
| Jul 10, 2017 | Completed final sign-off Jul 2023 | 100 Locust St | Fma Builders | demolish 1-story garageDetails
demolish 1-story garage | $10,000 |
| Oct 17, 2014 | Completed final sign-off Nov 2019 | 1281 Greenwich St | Forsythe General Contractors, Crown Construction San Francisco | interior remodel & seismic upgrade. expand (e) basement for new elevator. new principle facade.Details
interior remodel & seismic upgrade. expand (e) basement for new elevator. new principle facade. | $450,000 |
| Feb 4, 2011 | Completed final sign-off Nov 2014 | 2807 Clay St | Nova Designs Builds Inc | renovation of interior, horizontal addition to rear of basementand first levels. vertical addition inclusive of additional story and roof deck with penthouse, new exterior stair at rear.Details
renovation of interior, horizontal addition to rear of basementand first levels. vertical addition inclusive of additional story and roof deck with penthouse, new exterior stair at rear. | $500,000 |
| Jan 27, 2011 | Completed final sign-off Sep 2012 | 2625 Baker St | Dijeau Poage Construction Inc. | partial interior renovation; horizontal expansion at rear of basement and first levels, slight relocation of entry stair and door; extension to rear at attic level dormer; new rear exterior stair.Details
partial interior renovation; horizontal expansion at rear of basement and first levels, slight relocation of entry stair and door; extension to rear at attic level dormer; new rear exterior stair. | $425,000 |
| Oct 22, 2010 | Completed final sign-off Aug 2014 | 330 Seacliff Av | interior remodel at all floors, new garage, new exterior deck at rear , horizontal expansion to southwest @ all floor, new residential elevator, excavation at basement.Details
interior remodel at all floors, new garage, new exterior deck at rear , horizontal expansion to southwest @ all floor, new residential elevator, excavation at basement. | $1,100,000 |