Block 1289, lot 056
1234 Stanyan St
- City’s use
- Single Family Residential
- Built
- 1925
- Stories
- 2
- Units
- 1
- Rooms
- 3 bedrooms, 2 bathrooms
- Building
- 1,367 sq ft
- Lot
- 2,500 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 4, 2026 | Completed final sign-off Oct 2026 | 1234 Stanyan St | Huff Construction Company Inc | new bathroom addition at basement. new bar sink.Details
new bathroom addition at basement. new bar sink. | $40,000 |
| Nov 17, 2023 | Completed final sign-off Nov 2023 | 1234 Stanyan St | Huff Construction Company Inc | remove previously approved scope of work under pa# 2022-0708-8027 & 2023-0202-1240 per request of field inspector no new proposed workDetails
remove previously approved scope of work under pa# 2022-0708-8027 & 2023-0202-1240 per request of field inspector no new proposed work | |
| Apr 4, 2023 | Completed final sign-off May 2023 | 1234 Stanyan St | Mike Mccurdy Roofing Inc | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $11,400 |
| Feb 2, 2023 | Completed final sign-off Nov 2023 | 1234 Stanyan St | Huff Construction Company Inc | revision to bpa#202207088027, adjust position of proposed skylights, provide note to fire rate window, and reframing (e) damaged & substandard framing. allwork previously approved.enlarge footing at grid line 2, replace (e) 2x10 joist at first level in area indicated in plan, replace in-kind framingDetails
revision to bpa#202207088027, adjust position of proposed skylights, provide note to fire rate window, and reframing (e) damaged & substandard framing. allwork previously approved.enlarge footing at grid line 2, replace (e) 2x10 joist at first level in area indicated in plan, replace in-kind framing | |
| Jul 8, 2022 | Completed final sign-off Nov 2023 | 1234 Stanyan St | Huff Construction Company Inc | interior remodel and renovation of kitchen, bathrooms, and laundry. replacement of one window and patio door within existing openings. new skylights. no building envelope expansion. rear stair configuration.Details
interior remodel and renovation of kitchen, bathrooms, and laundry. replacement of one window and patio door within existing openings. new skylights. no building envelope expansion. rear stair configuration. | $329,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Huff Construction Company Inc (4), Mike Mccurdy Roofing Inc
- Architects
- David Swetz (3)
- Engineers
- Adam Klein (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.