Block 1412, lot 023B
246 22nd Ave
- City’s use
- Single Family Residential
- Built
- 1914
- Stories
- 2
- Units
- 1
- Rooms
- 3 bedrooms, 2 bathrooms
- Building
- 1,946 sq ft
- Lot
- 2,996 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 23, 2015 | Never finaled issued Jan 2015, no final | 246 22nd Av | street spaceDetails
street space | ||
| Jan 8, 2015 | Completed final sign-off Aug 2015 | 246 22nd Av | Fma Builders | alterations to existing exterior openings erplace existing exterior stair with new deck & stair. new powder room at 1st floor. associated sturctural work.Details
alterations to existing exterior openings erplace existing exterior stair with new deck & stair. new powder room at 1st floor. associated sturctural work. | $35,000 |
| Dec 22, 2014 | Completed final sign-off Jul 2015 | 246 22nd Av | Fma Builders | voluntary seismic upgrade @ rear wall, int t.i. work at rear of bldg including (n) furring, insulation, framing & sheating, install (n) elec fixtures.Details
voluntary seismic upgrade @ rear wall, int t.i. work at rear of bldg including (n) furring, insulation, framing & sheating, install (n) elec fixtures. | $20,000 |
| Jun 9, 2014 | Completed final sign-off Jul 2015 | 246 22nd Av | Terence Keenan Construction | 1/f- replace (e) furnace, remove (e) return air enclosure, install (n) laundry closet. 2/f- (n) windows, 3/f- (n) lighting, fill in (e) 14 sq,ft, lightwell, not visible from street, remodel (e) bathroom, (n) master bath & closet. remodel area 907 sq.ft.Details
1/f- replace (e) furnace, remove (e) return air enclosure, install (n) laundry closet. 2/f- (n) windows, 3/f- (n) lighting, fill in (e) 14 sq,ft, lightwell, not visible from street, remodel (e) bathroom, (n) master bath & closet. remodel area 907 sq.ft. | $40,000 |
| Mar 14, 2014 | Completed final sign-off Aug 2015 | 246 22nd Av | Terence Keenan Construction | ground floor voluntary structural upgarde. second floor kitchen remodel, relocate powder room and rwmoval of walls at second floor rear room.Details
ground floor voluntary structural upgarde. second floor kitchen remodel, relocate powder room and rwmoval of walls at second floor rear room. | $50,000 |
| Jan 31, 2014 | Completed final sign-off Jul 2015 | 246 22nd Av | Terence Keenan Construction | remove & replace finishes & fixtures, open ceilings and walls for exploratory demo to determine structural conditions at garage and 1st floor levels, misc dryrot repair (at lower 1/3 removal of ceiling and walls (ground contact ares, around existing windows & doors)Details
remove & replace finishes & fixtures, open ceilings and walls for exploratory demo to determine structural conditions at garage and 1st floor levels, misc dryrot repair (at lower 1/3 removal of ceiling and walls (ground contact ares, around existing windows & doors) | $8,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Terence Keenan Construction (3), Fma Builders (2)
- Architects
- Lee Hammack (4)
- Engineers
- Fareed Himmati
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.