David Israel
- License
- C10906
- Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
- About the two boards
- Look the license up with the state (Architects Board)
- Look up C10906 at the Board for Professional Engineers
- Listed as
- architect, engineer
- Firm
- Bar Architects
- Based in
- San Francisco
- On San Francisco permits
- Mar 2010 to May 2022
11 permits since 2000 (architect on 8 permits, engineer on 3 permits): 11 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Webcor Construction Lp (4), Cannon Constructors North Inc (3), Johnstone Moyer Inc (2), C C I Commercial Construction & Improv, Pmn Design Elect Inc Dba Design Elc
- Authorized agents
- Karen Anne Eichler (3)
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 10
- Commercial 1
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 4, 2022 | Completed final sign-off Jun 2023 | 900 Folsom St | C C I Commercial Construction & Improv | east lobby remodel at ground floor. leasing lobby remodel at ground floor. solarium room & technology room remodel(s) at 5th fl. no change to exterior facade.Details
east lobby remodel at ground floor. leasing lobby remodel at ground floor. solarium room & technology room remodel(s) at 5th fl. no change to exterior facade. | $180,000 |
| Jul 25, 2013 | Completed final sign-off Dec 2013 | 2001 Market St | Pmn Design Elect Inc Dba Design Elc | installation of a new 150 kvq 480/277 volt diesel gen set with a 335 gallon ul142 base tank, on the roof of 2001 market. ref pa# 201012206990, s-5 for fuel oil piping.Details
installation of a new 150 kvq 480/277 volt diesel gen set with a 335 gallon ul142 base tank, on the roof of 2001 market. ref pa# 201012206990, s-5 for fuel oil piping. | $100,000 |
| Sep 27, 2012 | Completed final sign-off Sep 2013 | 2130 Post St | Cannon Constructors North Inc | convert (e) ground floor space into 4 additional residential units. m.e.p under separate permit. fire sprinkler & fire alarm under separate permit.Details
convert (e) ground floor space into 4 additional residential units. m.e.p under separate permit. fire sprinkler & fire alarm under separate permit. | $225,000 |
| Sep 20, 2012 | Completed final sign-off Jun 2013 | 2130 Post St | Cannon Constructors North Inc | interior remodel of (e) 4th. & 5th. floor units. (n) kitchen & bathrooms & non-structural partitions. no work in common areas. all mep under separate permit.Details
interior remodel of (e) 4th. & 5th. floor units. (n) kitchen & bathrooms & non-structural partitions. no work in common areas. all mep under separate permit. | $250,000 |
| Sep 17, 2012 | Completed final sign-off Dec 2013 | 2130 Post St | Cannon Constructors North Inc | remodel of ground floor common area and 1 residential unit. all work limited to ground floor. mep under separate permit.Details
remodel of ground floor common area and 1 residential unit. all work limited to ground floor. mep under separate permit. | $245,000 |
| Mar 25, 2011 | Completed final sign-off Oct 2012 | 626 14th St | Webcor Construction Lp | demolish 2 units with garage, 3 stories, type 5 building.Details
demolish 2 units with garage, 3 stories, type 5 building. | $10,000 |
| Mar 25, 2011 | Completed final sign-off Oct 2012 | 2001 Market St | Webcor Construction Lp | demolish commercial, type 1, 1 & 1/2 stories building.Details
demolish commercial, type 1, 1 & 1/2 stories building. | $40,000 |
| Mar 25, 2011 | Completed final sign-off Oct 2012 | 632 14th St | Webcor Construction Lp | demolish 2 units w/ basement, type 5, 2 stories building.Details
demolish 2 units w/ basement, type 5, 2 stories building. | $10,000 |
| Dec 20, 2010 | Completed final sign-off Jun 2014 | 38 Dolores St | Webcor Construction Lp | to erect 9 stories, 81 units residential, retail and garage building.Details
to erect 9 stories, 81 units residential, retail and garage building. | $35,000,000 |
| Jul 7, 2010 | Completed final sign-off Feb 2011 | 1221 Jones St | Johnstone Moyer Inc | (n) canopy over existing entry to residential apartment buildingDetails
(n) canopy over existing entry to residential apartment building | $11,000 |
| Mar 24, 2010 | Completed final sign-off Feb 2011 | 1221 Jones St | Johnstone Moyer Inc | remodel existing residential lobby, new window walls, interior finishes & lighting. fire alarm & sprinkler under separate permit.Details
remodel existing residential lobby, new window walls, interior finishes & lighting. fire alarm & sprinkler under separate permit. | $115,000 |