A-B Construction Dba Amer Braz Const.
- Based in
- San Francisco
- On San Francisco permits
- Apr 2007 to Jun 2008
- Last 24 months
- 0 permits filed
8 permits since 2000: 3 completed, 5 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 9, 2008 | Expired or cancelled expired May 2010 | 1735 Van Ness Av | work @ unit# 406 only. kitchen remodel, bathroom update. countertop cabinets. non-structural.Details
work @ unit# 406 only. kitchen remodel, bathroom update. countertop cabinets. non-structural. | $14,000 |
| May 14, 2008 | Completed final sign-off Jun 2008 | 2720 Webster St | existing elec (240 to 110 amp wiring. + remodel kitchen changing of counter tops (island) plumbing add dishwasher garbage disposal no structural work. new lighting to be 50% high efficacy min.Details
existing elec (240 to 110 amp wiring. + remodel kitchen changing of counter tops (island) plumbing add dishwasher garbage disposal no structural work. new lighting to be 50% high efficacy min. | $9,600 |
| Nov 5, 2007 | Completed final sign-off Jul 2008 | 1890 Clay St | unit#902 & #1006. none structural remodel of 2 kitchen, 2 bathrooms cabinets sinks. remodel and replacement of sinks countertops + cabinets.Details
unit#902 & #1006. none structural remodel of 2 kitchen, 2 bathrooms cabinets sinks. remodel and replacement of sinks countertops + cabinets. | $10,000 |
| Aug 29, 2007 | Expired or cancelled expired Dec 2010 | 642 Jones St | non structural to comply with #200704401. repair type x drywall above ceilings and on walls of boiler room, storage rooms and storage closets, hallways to bsmnt. req. by housing inspection. kichn cabinets replacement mgr apt#1Details
non structural to comply with #200704401. repair type x drywall above ceilings and on walls of boiler room, storage rooms and storage closets, hallways to bsmnt. req. by housing inspection. kichn cabinets replacement mgr apt#1 | $7,000 |
| Aug 29, 2007 | Completed final sign-off Feb 2008 | 1890 Clay St | demo kchn cabinets, install new cabinets. none structural. install new kchn sink. new bathroom pedestal and commode. total 4 kchns and 4 bathrooms. 4 apartment unit 806, 706, 1002,1007Details
demo kchn cabinets, install new cabinets. none structural. install new kchn sink. new bathroom pedestal and commode. total 4 kchns and 4 bathrooms. 4 apartment unit 806, 706, 1002,1007 | $60,000 |
| Aug 8, 2007 | Expired or cancelled expired Mar 2008 | 1221 Jones St | none structural-replace kitchen cabinets, counter tops, gfi's, p trap-apartment #10e. installation to comply with title 24 energy codes.Details
none structural-replace kitchen cabinets, counter tops, gfi's, p trap-apartment #10e. installation to comply with title 24 energy codes. | $7,000 |
| May 18, 2007 | Expired or cancelled expired Dec 2008 | 1735 Van Ness Av | non structural, new cabinets, counter top sink. 3 bathrooms. new tiles work to be done in apts:104 105 and 401Details
non structural, new cabinets, counter top sink. 3 bathrooms. new tiles work to be done in apts:104 105 and 401 | $40,000 |
| Apr 17, 2007 | Expired or cancelled expired Mar 2008 | 1221 Jones St | work @ unit# 8d. all existing. none structural. new kitchen cabinets & countertop. bathroom countertop.provide 50% of kitchen light watts in fluorescent. install fluorescent lights. 100% fluorescent lights or o.s in bathroom.Details
work @ unit# 8d. all existing. none structural. new kitchen cabinets & countertop. bathroom countertop.provide 50% of kitchen light watts in fluorescent. install fluorescent lights. 100% fluorescent lights or o.s in bathroom. | $8,000 |