Velex Inc
- Based in
- Frisco
- On San Francisco permits
- Jul 2018 to Dec 2022
- Last 24 months
- 0 permits filed
15 permits since 2000: 9 completed, 6 never finaled.
Of the 6 never-finaled permits, 4 are 3 to 5 years old, 2 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 7, 2022 | Never finaled filed Dec 2022, never issued | 679 24th Av | tmobile & sprint mercing wireless services at this cell sites. t-mobile to remove decommission components of wireless sites. no removal of monopoles/towers or any structural components. structure will remain in use. site will be restored to pre condition.Details
tmobile & sprint mercing wireless services at this cell sites. t-mobile to remove decommission components of wireless sites. no removal of monopoles/towers or any structural components. structure will remain in use. site will be restored to pre condition. | $12,000 |
| Nov 29, 2022 | Completed final sign-off Oct 2024 | 2001 Union St | sprint has contracted velex to remove existing equipment, including electrical connections, off of the exiting rooftop telecommunications site. repair/patch all finishes in kind.Details
sprint has contracted velex to remove existing equipment, including electrical connections, off of the exiting rooftop telecommunications site. repair/patch all finishes in kind. | $12,000 |
| Aug 26, 2022 | Never finaled issued Apr 2023, no final | 510 Frederick St | sprint has contracted velex to remove (e) equipment, including electrical connections, off the exiting rooftop telecommunications site. repair/patch all finishes in kind.Details
sprint has contracted velex to remove (e) equipment, including electrical connections, off the exiting rooftop telecommunications site. repair/patch all finishes in kind. | $12,000 |
| Aug 26, 2022 | Never finaled issued May 2023, no final | 1135 Evans Av | sprint has contracted velex to remove existing equipment, including electrical connections, off of the existing rooftop telecommunications site.Details
sprint has contracted velex to remove existing equipment, including electrical connections, off of the existing rooftop telecommunications site. | $12,000 |
| Aug 25, 2022 | Completed final sign-off Dec 2023 | 2543 Noriega St | sprint cell site: remove existing equipment, including electrical connections, off of the exiting rooftop telecommunications site. repair/patch all finishes in kind.Details
sprint cell site: remove existing equipment, including electrical connections, off of the exiting rooftop telecommunications site. repair/patch all finishes in kind. | $12,000 |
| Aug 18, 2022 | Never finaled issued Jun 2023, no final | 1455 Market St | sprint - remove existing equipment, including electrical connections, off the existing rooftop telecommunications site. after removal, patch/restore to pre-project conditions.Details
sprint - remove existing equipment, including electrical connections, off the existing rooftop telecommunications site. after removal, patch/restore to pre-project conditions. | $12,000 |
| Jul 18, 2022 | Completed final sign-off Oct 2024 | 1100 Oak St | sprint has contracted velex to remove existing equipment, including electrical connections, off of the exiting rooftop telecommunications site. including antennas, mounts, cabinets, panels, and batteries. after removal of equipment, the rooftop will be stored to pre-project conditions.Details
sprint has contracted velex to remove existing equipment, including electrical connections, off of the exiting rooftop telecommunications site. including antennas, mounts, cabinets, panels, and batteries. after removal of equipment, the rooftop will be stored to pre-project conditions. | $12,000 |
| Jul 15, 2022 | Completed final sign-off May 2024 | 4377 Mission St | t-mobile has contracted velex to remove existing equipment, including electrical connections, off of the exiting rooftop telecommunications site.Details
t-mobile has contracted velex to remove existing equipment, including electrical connections, off of the exiting rooftop telecommunications site. | $12,000 |
| Jul 7, 2022 | Completed final sign-off May 2024 | 1334 Van Ness Av | remove existing equipment,including electrical connections,off of the existing rooftop telecommunications site.Details
remove existing equipment,including electrical connections,off of the existing rooftop telecommunications site. | $12,000 |
| Jul 6, 2022 | Completed final sign-off Sep 2024 | 667 Portola Dr | tmobile has contracted velex to remove (e) equipment, including electrical connections, off of the (e) rooftoop telecommunications site.Details
tmobile has contracted velex to remove (e) equipment, including electrical connections, off of the (e) rooftoop telecommunications site. | $12,000 |
| May 11, 2020 | Completed final sign-off Nov 2020 | 2001 37th Av | remove & replace 3 (e) antennaes with 3 (n) antenneas. remove & replace 2 (e) frp screens with 2 (n) frp screens; remove 3rrus and install 3 new rrus.Details
remove & replace 3 (e) antennaes with 3 (n) antenneas. remove & replace 2 (e) frp screens with 2 (n) frp screens; remove 3rrus and install 3 new rrus. | $25,000 |
| Jun 14, 2019 | Never finaled issued May 2020, no final | 2400 14th Av | t-mobile modification to replace 3 antennas with new antenna mounts, install 3 rru's, remove 3 antenna mount, replace with new antenna mounts, install tmas, hybrid cables, nw antennas to be painted to match, bldg nw equipt to be painted t match bldg.Details
t-mobile modification to replace 3 antennas with new antenna mounts, install 3 rru's, remove 3 antenna mount, replace with new antenna mounts, install tmas, hybrid cables, nw antennas to be painted to match, bldg nw equipt to be painted t match bldg. | $25,000 |
| Dec 7, 2018 | Completed final sign-off Mar 2020 | 965 Mission St | r&r (e) 2 pole breaker on (e) ele panel for proposed charles equipment cabinetDetails
r&r (e) 2 pole breaker on (e) ele panel for proposed charles equipment cabinet | $10,000 |
| Nov 2, 2018 | Never finaled issued Oct 2019, no final | 965 Mission St | sprint - modification to wirless site. r&r 3 (e) antennas, 1 per sector, r&r 3 (e) rrh replace with 3(p)2.5 rrh, 1 per sector. install 3 4port 800 mhz rrh, install 3 1900mhz rrus, r&r (e) equip rack w/charles cabinet. r&r (e) cables w/(p)hybrid cables in (p) cable trayDetails
sprint - modification to wirless site. r&r 3 (e) antennas, 1 per sector, r&r 3 (e) rrh replace with 3(p)2.5 rrh, 1 per sector. install 3 4port 800 mhz rrh, install 3 1900mhz rrus, r&r (e) equip rack w/charles cabinet. r&r (e) cables w/(p)hybrid cables in (p) cable tray | $20,000 |
| Jul 27, 2018 | Completed final sign-off Aug 2020 | 1453 Mission St | tmobile. install 3 new antennas in 2 new frp screens all on rooftop. install coax cables, 2 tma antennas, remove 1 antenna, antenna mount, coax cables. 3 hybrid cab.es, remove 3 diplexers & 3 tma's.Details
tmobile. install 3 new antennas in 2 new frp screens all on rooftop. install coax cables, 2 tma antennas, remove 1 antenna, antenna mount, coax cables. 3 hybrid cab.es, remove 3 diplexers & 3 tma's. | $30,000 |