Clw Builders Inc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2009 to Aug 2026
- Last 24 months
- 3 permits filed
28 permits since 2000: 24 completed, 1 in progress, 3 never finaled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 10, 2026 | In progress issued Sep 2026 | 525 05th St | revision 202212309578- includes (n) kitchen hood (ul710b) for the convection oven, and relocate of the fire suppression system for the type 1 hoodDetails
revision 202212309578- includes (n) kitchen hood (ul710b) for the convection oven, and relocate of the fire suppression system for the type 1 hood | $50,000 |
| Jun 5, 2026 | Completed final sign-off Jun 2026 | 1427 Ocean Av | revision to 202412166876. 2/f: revise approved plan to reflect (e) as-built conditions for final inspection. plans are being update to match the completed work in the field and facilitate permit sign off. no new work is proposed. no new plumbing fixtures.Details
revision to 202412166876. 2/f: revise approved plan to reflect (e) as-built conditions for final inspection. plans are being update to match the completed work in the field and facilitate permit sign off. no new work is proposed. no new plumbing fixtures. | |
| Dec 16, 2024 | Completed final sign-off Jun 2026 | 1427 Ocean Av | remodel (e) kitchen, two bathroom and add two new full bathroom. all work at 2/fDetails
remodel (e) kitchen, two bathroom and add two new full bathroom. all work at 2/f | $238,800 |
| Jul 24, 2023 | Completed final sign-off Jul 2024 | 1425 Ocean Av | remodeling (e) vacant store. provide accessible entrance, restroom & stairs. rebuilt (e) damaged suspanded accoustical tile ceiling & lightingDetails
remodeling (e) vacant store. provide accessible entrance, restroom & stairs. rebuilt (e) damaged suspanded accoustical tile ceiling & lighting | $62,000 |
| Sep 9, 2022 | Completed final sign-off Apr 2023 | 2403 Keith St | rev to site 201905069853. final scp application materials approved by sfpuc w/ updates to licnic's permaeable paving areaas & assoc components, piping, sandtraps, inlets, etc. see plumb permit pw20220829444Details
rev to site 201905069853. final scp application materials approved by sfpuc w/ updates to licnic's permaeable paving areaas & assoc components, piping, sandtraps, inlets, etc. see plumb permit pw20220829444 | $50,000 |
| Aug 23, 2021 | Never finaled issued Dec 2022, no final | 1 Dr Carlton B Goodlett Pl | city hall: to modernize (8) (e) elevators, including replacement / refurbishment of (e) equipment, car control panels & lobby fixtures. additional scope include removal of fire sprinklers & installation of (n) rooftop.Details
city hall: to modernize (8) (e) elevators, including replacement / refurbishment of (e) equipment, car control panels & lobby fixtures. additional scope include removal of fire sprinklers & installation of (n) rooftop. | $4,000,000 |
| May 6, 2019 | Completed final sign-off Apr 2023 | 2403 Keith St | erect (n) 2-story primary care clinicDetails
erect (n) 2-story primary care clinic | $19,000,000 |
| May 15, 2018 | Completed final sign-off Jul 2019 | 125 Bay Shore Bl | change extg warehouse into homeless shelter with laundry room. addition of modular trailers for toilet & bathing. new deck. minor site work for security & accessebility. minor renovation to first floor of extg office bldg. n/a for maherDetails
change extg warehouse into homeless shelter with laundry room. addition of modular trailers for toilet & bathing. new deck. minor site work for security & accessebility. minor renovation to first floor of extg office bldg. n/a for maher | $2,000,000 |
| May 30, 2017 | Completed final sign-off Jul 2020 | 3030 24th Av | remodeling and alteration extg bldg. relocated interior stairs. rebuild lath and plaster to all walls and ceilings and stucco exterior walls. replace all windows, new electrical & plmg. add 1 bedroom, 1 bath room at 1st floor. add 1 bath at 2nd fl and 3rd floor.Details
remodeling and alteration extg bldg. relocated interior stairs. rebuild lath and plaster to all walls and ceilings and stucco exterior walls. replace all windows, new electrical & plmg. add 1 bedroom, 1 bath room at 1st floor. add 1 bath at 2nd fl and 3rd floor. | $250,000 |
| Feb 14, 2017 | Completed final sign-off Jun 2017 | 250 Clay St | revision to app#201410068218 requested by inspector for an electrical single line update. n/a for maher.Details
revision to app#201410068218 requested by inspector for an electrical single line update. n/a for maher. | |
| Mar 28, 2016 | Never finaled issued Mar 2016, no final | 850 Columbus Av | to obtain final inspection for work approved under pa# 201302260995, 201211164370 and 201210111843. all work is complete.Details
to obtain final inspection for work approved under pa# 201302260995, 201211164370 and 201210111843. all work is complete. | |
| Oct 8, 2014 | Completed final sign-off Oct 2017 | 444 Stockton St | replace (e) supply and exhaust fans, and upgrade (e) co maniting system.Details
replace (e) supply and exhaust fans, and upgrade (e) co maniting system. | $350,000 |
| Oct 6, 2014 | Completed final sign-off Jun 2017 | 250 Clay St | replace (e) exhaust fans and supply fans for the garage and install carbon monoxide sensors.Details
replace (e) exhaust fans and supply fans for the garage and install carbon monoxide sensors. | $1,500,000 |
| Nov 4, 2013 | Completed final sign-off Dec 2014 | 246 Eddy St | revision to pa#201012237366 - revsion to works only outside building - storm drain system and relocation of sand trap.Details
revision to pa#201012237366 - revsion to works only outside building - storm drain system and relocation of sand trap. | $10,000 |
| Mar 9, 2012 | Completed final sign-off Sep 2012 | 1616 20th St | revision to 2007-09-07-2116 for property line wall setback. proposed to construct in-plane within (e) construction and not setback from 1st floor construction.Details
revision to 2007-09-07-2116 for property line wall setback. proposed to construct in-plane within (e) construction and not setback from 1st floor construction. | |
| Mar 9, 2012 | Completed final sign-off Sep 2012 | 1616 20th St | to obtain final inspection for work approved under pa 200709072116; all work is completeDetails
to obtain final inspection for work approved under pa 200709072116; all work is complete | |
| Mar 9, 2012 | Completed final sign-off Sep 2012 | 1616 20th St | to obtain final inspection for work approved under pa 200908074389; all work is completeDetails
to obtain final inspection for work approved under pa 200908074389; all work is complete | |
| Mar 9, 2012 | Completed final sign-off Sep 2012 | 1616 20th St | to obtain final inspection for work approved under pa 200904166455; all work is completeDetails
to obtain final inspection for work approved under pa 200904166455; all work is complete | |
| Nov 21, 2011 | Completed final sign-off Oct 2013 | 2225 Lawton St | install temporary shoring to support (e) framing for replacement of 8 dry rotted posts discovered during proposed renovation of (e) gymnasium per approved pa# 2010-0701-5804Details
install temporary shoring to support (e) framing for replacement of 8 dry rotted posts discovered during proposed renovation of (e) gymnasium per approved pa# 2010-0701-5804 | $3,900 |
| May 16, 2011 | Completed final sign-off Dec 2014 | 246 Eddy St | to demolish 1 story commercial building used as rec center.Details
to demolish 1 story commercial building used as rec center. | $25,000 |
| Jul 23, 2010 | Completed final sign-off Aug 2010 | 1431 Ocean Av | revision to pa#2010.03.18.8453 per correction notice of 6/7/10. provide the elec. power door at entrance. change the bathrm door to sliding doorDetails
revision to pa#2010.03.18.8453 per correction notice of 6/7/10. provide the elec. power door at entrance. change the bathrm door to sliding door | $2,000 |
| May 27, 2010 | Completed final sign-off May 2011 | 155 Winston Dr | revise plywood shear wall at line "a". revision to application #200904136157.Details
revise plywood shear wall at line "a". revision to application #200904136157. | $500 |
| Mar 18, 2010 | Completed final sign-off Aug 2010 | 1433 Ocean Av | 1433 ocean ave-alteration to (e) 2 units at 2nd floor, enclosed (e) interior stairs, relocated kitchen, bedroom. add utility rooms & new skylights to (e) light court.Details
1433 ocean ave-alteration to (e) 2 units at 2nd floor, enclosed (e) interior stairs, relocated kitchen, bedroom. add utility rooms & new skylights to (e) light court. | $30,000 |
| Mar 18, 2010 | Completed final sign-off Aug 2010 | 1431 Ocean Av | 1431 ocean ave-proposed a office space at ground floorDetails
1431 ocean ave-proposed a office space at ground floor | $30,000 |
| Mar 16, 2010 | Completed final sign-off May 2011 | 155 Winston Dr | revision to current open permit #200904136157 to add simpson strongwall shearwall system in lieu of original plywd. on wd. stud shear wall at line "c" between column lines 4.1 & 5.Details
revision to current open permit #200904136157 to add simpson strongwall shearwall system in lieu of original plywd. on wd. stud shear wall at line "c" between column lines 4.1 & 5. | $10,000 |
| Jun 9, 2009 | Completed final sign-off Sep 2012 | 1616 20th St | revision to pa# 2007.09.07.2116 for revised local equivalency form ab-009 for fire sprinklers at north window. fire sprinkler under separate permit. ( note: use 2001 cbc for type of occupancy under this permit)Details
revision to pa# 2007.09.07.2116 for revised local equivalency form ab-009 for fire sprinklers at north window. fire sprinkler under separate permit. ( note: use 2001 cbc for type of occupancy under this permit) | |
| Jun 5, 2009 | Never finaled issued Jan 2010, no final | 689 Hayes St | demolition of 1 story, type 5, clubhouse.Details
demolition of 1 story, type 5, clubhouse. | $25,000 |
| Jun 5, 2009 | Completed final sign-off Sep 2011 | 689 Hayes St | to erect a one story playground club house.Details
to erect a one story playground club house. | $2,000,000 |