Block 0332, lot 006
246 Eddy St
- City’s use
- Commercial Misc
- Built
- 1922
- Stories
- 1
- Units
- 3
- Rooms
- 3 bathrooms
- Building
- 2,425 sq ft
- Lot
- 3,436 sq ft
- Zoning
- P
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 30, 2014 | Completed final sign-off Dec 2014 | 246 Eddy St | San Francisco Fire Protection | revision to pa 32013.0604.8629 - install new fire system w/ifp-50 control panel. install notification thruout. tie-in existing waterflow & tamper switch to new panel.n/a maher ordinance 155-13Details
revision to pa 32013.0604.8629 - install new fire system w/ifp-50 control panel. install notification thruout. tie-in existing waterflow & tamper switch to new panel.n/a maher ordinance 155-13 | |
| Mar 10, 2014 | Completed final sign-off Nov 2014 | 246 Eddy St | Golden State Plumbing | provide new fire sprinkler system for new clubhouse, 49 heads total. work includes the 4" d.i. underground to connect to 8" cwm on eddy. ref. arch. app# 2010-1223-7366Details
provide new fire sprinkler system for new clubhouse, 49 heads total. work includes the 4" d.i. underground to connect to 8" cwm on eddy. ref. arch. app# 2010-1223-7366 | $25,000 |
| Nov 4, 2013 | Completed final sign-off Dec 2014 | 246 Eddy St | Clw Builders Inc | revision to pa#201012237366 - revsion to works only outside building - storm drain system and relocation of sand trap.Details
revision to pa#201012237366 - revsion to works only outside building - storm drain system and relocation of sand trap. | $10,000 |
| Jun 4, 2013 | Completed final sign-off Dec 2014 | 246 Eddy St | San Francisco Fire Protection | install new fire alarm system w/ifp-50 control unit in garage. install notification devices thru-out the recreation & office area. install 5 pull stations @the exits. tie-in water flow & tamper switch (installed by others) to new panel. ti pa# 2010-1223-7366Details
install new fire alarm system w/ifp-50 control unit in garage. install notification devices thru-out the recreation & office area. install 5 pull stations @the exits. tie-in water flow & tamper switch (installed by others) to new panel. ti pa# 2010-1223-7366 | $7,500 |
| May 16, 2011 | Completed final sign-off Dec 2014 | 246 Eddy St | Clw Builders Inc | to demolish 1 story commercial building used as rec center.Details
to demolish 1 story commercial building used as rec center. | $25,000 |
| Dec 23, 2010 | Completed final sign-off Apr 2015 | 246 Eddy St | erect 1 story, type 5, park & club house.Details
erect 1 story, type 5, park & club house. | $4,500,000 | |
| Jan 8, 2002 | Expired or cancelled expired Jul 2002 | 246 Eddy St | build permanent walls to provide a computer lab as 8'6x22'0 w/2 doors and 3 windows a screen door toDetails
build permanent walls to provide a computer lab as 8'6x22'0 w/2 doors and 3 windows a screen door to | $8,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Clw Builders Inc (2), San Francisco Fire Protection (2), Golden State Plumbing
- Architects
- Kyle Elliott
- Engineers
- Brian Milman
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.