Brian Milman
- License
- C29018
- Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
- About the two boards
- Look the license up with the state (Architects Board)
- Look up C29018 at the Board for Professional Engineers
- Listed as
- architect, engineer
- Firm
- Wrns Studio
- Based in
- San Francisco
- On San Francisco permits
- Mar 2009 to Nov 2017
3 permits since 2000 (architect on 2 permits, engineer on 1 permit): 2 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Clw Builders Inc, Partee Construction Co, Plant Construction Co, Lp, Roebbelen Contracting Inc
- Engineers
- Eunice Yoon, Jason Lau
Where they worked
- Single-family 1
- Multi-family (2-family, apartments) 0
- Commercial 1
- Other or unknown 1
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 8, 2017 | Completed final sign-off Nov 2018 | 355 Mcallister St | Roebbelen Contracting Inc, Plant Construction Co, Lp | propose project consists of a vertical addition (type v-b) accessory structure of a commercial food service kiosk cafe with a gross area of approxmately 640 sf. this will built on top of (e) below grade structure brooks hall. addition consists of commercial kitchen, staff & patron restroom.Details
propose project consists of a vertical addition (type v-b) accessory structure of a commercial food service kiosk cafe with a gross area of approxmately 640 sf. this will built on top of (e) below grade structure brooks hall. addition consists of commercial kitchen, staff & patron restroom. | $850,000 |
| May 16, 2011 | Completed final sign-off Dec 2014 | 246 Eddy St | Clw Builders Inc | to demolish 1 story commercial building used as rec center.Details
to demolish 1 story commercial building used as rec center. | $25,000 |
| Mar 13, 2009 | Never finaled issued Mar 2009, no final | 1451 12th Av | Partee Construction Co | revision to pa #200710256402s1, change porch retaining wall in rear yard, change entry from garage on 1st level.Details
revision to pa #200710256402s1, change porch retaining wall in rear yard, change entry from garage on 1st level. |