Irene U. Aquino

License
C33125
Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
About the two boards
Look the license up with the state (Architects Board)
Look up C33125 at the Board for Professional Engineers
Listed as
architect, engineer
Firm
City & County Of Sf - Boa
Based in
San Francisco
On San Francisco permits
Jun 2019 to Aug 2026

6 permits since 2000 (architect on 5 permits, engineer on 1 permit): 3 completed, 1 in progress, 2 never finaled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Ccsf Dpw-Bbr Steamfitters/Plumbers
Engineers
C Hi Keong Iao, Jenny Chan, Kent K Minh, Ramid Arbabaraghi, Shahla Saiidnia

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Aug 26, 2026In progress
filed Aug 2026, not yet issued
1650 Mission Strenovation of suite 312. to commodate conference room, bigger breakroom area, new reception desk, new flooring, relocate electric as required, new plumbing for breakroom sink minor code compliance upgrades to the restrooms to suire 312.
Details
Permit
202608267252

renovation of suite 312. to commodate conference room, bigger breakroom area, new reception desk, new flooring, relocate electric as required, new plumbing for breakroom sink minor code compliance upgrades to the restrooms to suire 312.

Open the permit page

$850,000
Nov 3, 2022Completed
final sign-off Mar 2025
25 Van Ness Av7/f: selective demolition of interior partitions, construction of new partitions, new lighting, new finishes, new plumbing in breakroom, ada upgrades in restrooms, new power and data receptacles.
Details
Permit
202211035811
Permit issued
Oct 4, 2023
Final sign-off
Mar 26, 2025

7/f: selective demolition of interior partitions, construction of new partitions, new lighting, new finishes, new plumbing in breakroom, ada upgrades in restrooms, new power and data receptacles.

Open the permit page

$1,275,000
Jun 14, 2022Completed
final sign-off Sep 2023
1650 Mission Stste 300 3rd flr: add mechanical cooling to data server room equipment, and separate server space from adjoining breakroom. selective demo. new non-structural partition & new door. replace finishes as needed. electrical, hvac & fire sprinkler under separate permits.
Details
Permit
202206146274
Permit issued
Jul 11, 2022
Final sign-off
Sep 27, 2023

ste 300 3rd flr: add mechanical cooling to data server room equipment, and separate server space from adjoining breakroom. selective demo. new non-structural partition & new door. replace finishes as needed. electrical, hvac & fire sprinkler under separate permits.

Open the permit page

$150,000
Nov 15, 2021Completed
final sign-off Dec 2024
100 Larkin StCcsf Dpw-Bbr Steamfitters/Plumbersnon structural interior alterations, including selective demo and new partitions, doors, ceilings, finishes and mep including lighting and hvac
Details
Permit
202111152364
Permit issued
Jan 21, 2022
Final sign-off
Dec 30, 2024

non structural interior alterations, including selective demo and new partitions, doors, ceilings, finishes and mep including lighting and hvac

Open the permit page

$679,125
Dec 12, 2019Never finaled
issued Jan 2020, no final
1 South Van Ness Avref pa# 201906193819; install heat pump to cool data room
Details
Permit
201912129305
Permit issued
Jan 16, 2020

ref pa# 201906193819; install heat pump to cool data room

Open the permit page

$150,000
Jun 19, 2019Never finaled
issued Oct 2019, no final
1 South Van Ness Av8/f: selective demo of partitions, doors, finishes. relocation of light fixtures. installation of new partitons, glazed opening, and diffusers. ada upgrades in restrooms.
Details
Permit
201906193819
Permit issued
Oct 10, 2019

8/f: selective demo of partitions, doors, finishes. relocation of light fixtures. installation of new partitons, glazed opening, and diffusers. ada upgrades in restrooms.

Open the permit page

$150,000