C Hi Keong Iao
- License
- E19134
- Electrical engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up E19134 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Bbr Dpw
- Based in
- San Francisco
- On San Francisco permits
- Jul 2021 to Nov 2021
4 permits since 2000 (engineer on 4 permits): 3 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Ccsf Dpw-Bbr Steamfitters/Plumbers (3)
- Architects
- Irene Aguino
- Engineers
- Kent K Minh
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 2
- Other or unknown 2
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 15, 2021 | Completed final sign-off Dec 2024 | 100 Larkin St | Ccsf Dpw-Bbr Steamfitters/Plumbers | non structural interior alterations, including selective demo and new partitions, doors, ceilings, finishes and mep including lighting and hvacDetails
non structural interior alterations, including selective demo and new partitions, doors, ceilings, finishes and mep including lighting and hvac | $679,125 |
| Oct 8, 2021 | Completed final sign-off Apr 2023 | 2101 Washington St | install new light poles and replace several existing light poles at ccsf public parkDetails
install new light poles and replace several existing light poles at ccsf public park | $150,000 | |
| Aug 26, 2021 | Never finaled issued Oct 2021, no final | 1 South Van Ness Av | Ccsf Dpw-Bbr Steamfitters/Plumbers | 2/f: new generator. provide emergency power to office spaces. install new 100a, 42 circuit, 208/120v panel, install new emergency circuits, convert some extg normal power circuits to emergency use.Details
2/f: new generator. provide emergency power to office spaces. install new 100a, 42 circuit, 208/120v panel, install new emergency circuits, convert some extg normal power circuits to emergency use. | $65,000 |
| Jul 14, 2021 | Completed final sign-off Jan 2022 | 1650 Mission St | Ccsf Dpw-Bbr Steamfitters/Plumbers | ste 101a: replace oringinal specified light fixtures with different light fixtures. ref 201712146467Details
ste 101a: replace oringinal specified light fixtures with different light fixtures. ref 201712146467 | $2,000 |