Block 0211, lot 001
943 Stockton St
- City’s use
- Miscellaneous/Mixed-Use
- Built
- 1906
- Stories
- 2
- Units
- 24
- Rooms
- 3 bathrooms
- Lot
- 10,053 sq ft
- Zoning
- CRNC
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
25 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 23, 2024 | Completed final sign-off Nov 2025 | 943 Stockton St | Mik Construction Inc | demo e) banner, scraped & cleand for art installation. furnished install all req steel backing assembly. furnish/ install air barrier/waterproofing. glazing installation (glass artwork). furnish scaffold for entire project. (scaffolding under separate permit)Details
demo e) banner, scraped & cleand for art installation. furnished install all req steel backing assembly. furnish/ install air barrier/waterproofing. glazing installation (glass artwork). furnish scaffold for entire project. (scaffolding under separate permit) | $478,009 |
| Aug 1, 2023 | Completed final sign-off Sep 2023 | 943 Stockton St | Cosco Fire Protection Inc. | add 3 pendent sprinklers under new soffit in sfpd down rmDetails
add 3 pendent sprinklers under new soffit in sfpd down rm | $14,000 |
| Jan 19, 2023 | Completed final sign-off Sep 2023 | 933 Stockton St | Sabah International Incorporated | revision to pa# 201810233853. provide a modification of the existing fire alarm system. add (3) new led ceiling speaker/strobes.Details
revision to pa# 201810233853. provide a modification of the existing fire alarm system. add (3) new led ceiling speaker/strobes. | $11,138 |
| Oct 14, 2022 | Never finaled issued Mar 2023, no final | 933 Stockton St | Sabah International Incorporated | fire as built for pa# 201701177247. revused sequence of operations matrix for addition of the traction power emergency power off (epo) control. add 2 addressable input modules for epo status monitoring, 1 addressable output module for epo trigger.Details
fire as built for pa# 201701177247. revused sequence of operations matrix for addition of the traction power emergency power off (epo) control. add 2 addressable input modules for epo status monitoring, 1 addressable output module for epo trigger. | |
| May 25, 2022 | Completed final sign-off Jan 2024 | 943 Stockton St | Mik Construction Inc | selective demo and new construction of selective demo and new construction remodel of (e) tenant space with new doors, windows, equipment finishes and storage casework, new lighting fixtures and power outlets, new sink & hvac registersDetails
selective demo and new construction of selective demo and new construction remodel of (e) tenant space with new doors, windows, equipment finishes and storage casework, new lighting fixtures and power outlets, new sink & hvac registers | $140,000 |
| Dec 7, 2020 | Never finaled issued Jan 2021, no final | 933 Stockton St | Tutor Perini Corporation | 6" di cement lined underground fire line (9.3 feet), muni china town stationDetails
6" di cement lined underground fire line (9.3 feet), muni china town station | $2,000 |
| Aug 25, 2020 | Completed final sign-off Jun 2023 | 933 Stockton St | Cosco Fire Protection Inc. | revision to pa #201712136329: due to arch. plan pcc50 changed glass canopy on the surface level. fire sprinkler layout needs to be revised on both surface level and plaza level.Details
revision to pa #201712136329: due to arch. plan pcc50 changed glass canopy on the surface level. fire sprinkler layout needs to be revised on both surface level and plaza level. | |
| Oct 23, 2018 | Completed final sign-off May 2023 | 933 Stockton St | Sabah International Incorporated | provide a (n) fire alarm system @ the new chinatown light rail station. permit number: 2012-0403-7405.Details
provide a (n) fire alarm system @ the new chinatown light rail station. permit number: 2012-0403-7405. | $90,047 |
| Dec 13, 2017 | Completed final sign-off May 2023 | 933 Stockton St | Cosco Fire Protection Inc. | pre-action system, deluge system, wet systems standpipes.Details
pre-action system, deluge system, wet systems standpipes. | $1,900,000 |
| Jun 13, 2017 | Expired or cancelled cancelled Aug 2023 | 933 Stockton St | Sabah International Incorporated | ref #2012-0430-7405 (general contractor permit #) provide (2) customer built deluge panels.Details
ref #2012-0430-7405 (general contractor permit #) provide (2) customer built deluge panels. | $72,000 |
| Jan 17, 2017 | Completed final sign-off Mar 2023 | 933 Stockton St | Sabah International Incorporated | install new fm-200 clean agent fire suppression system. ref. #201204037405Details
install new fm-200 clean agent fire suppression system. ref. #201204037405 | $508,127 |
| May 25, 2016 | Never finaled issued Jan 2017, no final | 933 Stockton St | Tutor Perini Corporation | revision to pa #201204037405, addition of plaza level on top of existing (currently under construction) transit station. ref pa 201204037405Details
revision to pa #201204037405, addition of plaza level on top of existing (currently under construction) transit station. ref pa 201204037405 | $3,500,000 |
| Jul 7, 2015 | Expired or cancelled cancelled Sep 2015 | 945 Stockton St | Everest Waterproofing & Restoration Inc. | b/f - zypex interior walls - waterproofing; epoxy inject interior wall; replace dirty tile on ceiling with new ones.Details
b/f - zypex interior walls - waterproofing; epoxy inject interior wall; replace dirty tile on ceiling with new ones. | $20,000 |
| Jun 10, 2015 | Never finaled issued Jun 2015, no final | 945 Stockton St | street space permit /renewal of permit #1357024Details
street space permit /renewal of permit #1357024 | ||
| May 8, 2015 | Never finaled issued May 2015, no final | 945 Stockton St | street spaceDetails
street space | ||
| Oct 4, 2012 | Completed final sign-off Oct 2025 | 933 Stockton St | Tutor Perini Corporation | demolition of one commercial building for central sub-way.Details
demolition of one commercial building for central sub-way. | $238,091 |
| Apr 3, 2012 | Never finaled issued Jul 2013, no final | 933 Stockton St | Tutor Perini Corporation | erect central t subway chinatown station. address: 933, 935, 937, 939, 941, 943, 945, 947, 949 stockton streetDetails
erect central t subway chinatown station. address: 933, 935, 937, 939, 941, 943, 945, 947, 949 stockton street | $69,970,683 |
| Feb 15, 2012 | Completed final sign-off Oct 2025 | 933 Stockton St | Construction Systems Bld & Design | remove signs from vacant building (to be demolished for new chinatown subway system building).Details
remove signs from vacant building (to be demolished for new chinatown subway system building). | $200 |
| Mar 3, 2008 | Never finaled issued Mar 2008, no final | 935 Stockton St | street space permit only.Details
street space permit only. | ||
| Jan 28, 2008 | Never finaled issued Jan 2008, no final | 935 Stockton St | street space permitDetails
street space permit | ||
| Dec 17, 2007 | Completed final sign-off Apr 2008 | 935 Stockton St | proposed a new beauty salon at existing ground floor (change existing retail into new beauty salon).Details
proposed a new beauty salon at existing ground floor (change existing retail into new beauty salon). | $40,000 | |
| Jan 12, 2006 | Never finaled issued Jan 2006, no final | 935 Stockton St | Wong Construction Inc | repair cornice @ front of building.Details
repair cornice @ front of building. | $5,500 |
| Apr 21, 2004 | Completed final sign-off Nov 2005 | 933 Stockton St | umb seismic retrofit by bolt plus procedure including installing steel lateral ressisting frames toDetails
umb seismic retrofit by bolt plus procedure including installing steel lateral ressisting frames to | $60,000 | |
| Mar 20, 2002 | Expired or cancelled expired Sep 2002 | 945 Stockton St | street spaceDetails
street space | ||
| Mar 19, 2002 | Completed final sign-off Jul 2002 | 945 Stockton St | tenant improve in barber shop, replace store door in kindDetails
tenant improve in barber shop, replace store door in kind | $12,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Sabah International Incorporated (5), Tutor Perini Corporation (4), Cosco Fire Protection Inc. (3), Mik Construction Inc (2), Construction Systems Bld & Design, Everest Waterproofing & Restoration Inc., Wong Construction Inc
- Architects
- Mona Tamari (3)
- Engineers
- Christopher Hawkins (2), Fadi Walieddine (2), Lang A. Huey (2), Wuthea Send (2), Carlos Chang, Denis A. Henmi, Dolle Yung -Electrical Pe, Douglas Yung, Joyce Cheng, Kenneth Johnson -Geotechnical, Marco Sgknu, Paul O'neill, Paul O'neill, Timothy Chung Tai Lee
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.