Lang Huey
- Listed as
- engineer
- Firm
- Sfmta-Engineering
- Based in
- San Francisco
- On San Francisco permits
- Apr 2012 to Jul 2021
11 permits since 2000 (engineer on 11 permits): 8 completed, 2 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 12, 2021 | Completed final sign-off Nov 2023 | 1849 Harrison St | remove six (e) vehicle lifts, replace w/(5) new in kind automotive lift institute, (ali) certified vehicle lift and associated equipment at scott facility, additional work to be performed, (1) demo (e) lifts and removal attached equipment install new grs conduit wiring and branch circuit breakersDetails
remove six (e) vehicle lifts, replace w/(5) new in kind automotive lift institute, (ali) certified vehicle lift and associated equipment at scott facility, additional work to be performed, (1) demo (e) lifts and removal attached equipment install new grs conduit wiring and branch circuit breakers | $564,000 | |
| Mar 31, 2021 | Never finaled issued Apr 2022, no final | 1095 Indiana St | demolition and replacement of the existing bus wash equipment and its reclamation system, including the trench drains and the concrete floor in the bus wash building.Details
demolition and replacement of the existing bus wash equipment and its reclamation system, including the trench drains and the concrete floor in the bus wash building. | $3,800,000 | |
| Nov 17, 2020 | Completed final sign-off Nov 2023 | 1849 Harrison St | Yerba Buena Engineering & Construction | ada upgrades to facility which include restroom renovation, hand rails, signage, removal of drinking fountains and door replacement.Details
ada upgrades to facility which include restroom renovation, hand rails, signage, removal of drinking fountains and door replacement. | $330,000 |
| Feb 13, 2017 | Completed final sign-off May 2019 | 1940 Harrison St | Pilot Construction Management Inc | remove 2 waste tank system located in an underground concrete vault wall, replace with two new double walled above ground tank system and new tank monitoring system. ul142 n/a ordinance #155-13Details
remove 2 waste tank system located in an underground concrete vault wall, replace with two new double walled above ground tank system and new tank monitoring system. ul142 n/a ordinance #155-13 | $958,524 |
| Feb 13, 2017 | Completed final sign-off May 2019 | 151 Beach St | Pilot Construction Management Inc | remove 2 (e) 20,000 gal single wall ust and (e) fuel dispensers #4-#6. instlal 2 (n) 20,000 gal double wall ust (diesel fuel supply) with new dispensers #7-#9, and new tank monitoring system/leak detection. ** maher: disturbance of at least 50 cu.yd. of soil; route to dph **Details
remove 2 (e) 20,000 gal single wall ust and (e) fuel dispensers #4-#6. instlal 2 (n) 20,000 gal double wall ust (diesel fuel supply) with new dispensers #7-#9, and new tank monitoring system/leak detection. ** maher: disturbance of at least 50 cu.yd. of soil; route to dph ** | $2,681,498 |
| Feb 13, 2017 | Completed final sign-off May 2021 | 1849 Harrison St | Mitchell Engineering, Pilot Construction Management Inc | remove 2 waste tank system located on underground concrete valut, remove fuel 1,000 gallon above ground tanks in mechanical room, 5 (n) aboveground tanks ul 142, new hose reels, pumps, equipment & piping installed in mechanical room. n/a ordinance #155-13Details
remove 2 waste tank system located on underground concrete valut, remove fuel 1,000 gallon above ground tanks in mechanical room, 5 (n) aboveground tanks ul 142, new hose reels, pumps, equipment & piping installed in mechanical room. n/a ordinance #155-13 | $1,742,974 |
| Oct 29, 2014 | Expired or cancelled withdrawn Dec 2014 | 220 Geary St | revision to appl #201205100184 - partial demolitoin of sprinkler & standpipe piping at powell street station for new central subway union square/market street station entrance. n/a maher ordinance.Details
revision to appl #201205100184 - partial demolitoin of sprinkler & standpipe piping at powell street station for new central subway union square/market street station entrance. n/a maher ordinance. | $50,000 | |
| Oct 4, 2012 | Completed final sign-off Oct 2025 | 933 Stockton St | Tutor Perini Corporation | demolition of one commercial building for central sub-way.Details
demolition of one commercial building for central sub-way. | $238,091 |
| Sep 19, 2012 | Completed final sign-off Jun 2025 | 266 04th St | Tutor Perini Corporation | erect central transit subway station.Details
erect central transit subway station. | $38,314,494 |
| May 10, 2012 | Completed final sign-off Jul 2025 | 220 Geary St | Tutor Perini Corporation | partial demolition of union square plaza and garage, construction of new central subway union square/market street station entrance.Details
partial demolition of union square plaza and garage, construction of new central subway union square/market street station entrance. | $16,126,562 |
| Apr 3, 2012 | Never finaled issued Jul 2013, no final | 933 Stockton St | Tutor Perini Corporation | erect central t subway chinatown station. address: 933, 935, 937, 939, 941, 943, 945, 947, 949 stockton streetDetails
erect central t subway chinatown station. address: 933, 935, 937, 939, 941, 943, 945, 947, 949 stockton street | $69,970,683 |