Pilot Construction Management Inc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2017 to Apr 2022
- Last 24 months
- 0 permits filed
10 permits since 2000: 8 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 11, 2022 | Completed final sign-off May 2023 | 1348 Douglass St | replace 1 existing tub to shower pan.Details
replace 1 existing tub to shower pan. | $3,000 |
| Sep 23, 2020 | Completed final sign-off May 2023 | 1348 Douglass St | remodel kitchen, relocate bathroom, add 1/2 bathroom.replace stairs & skylights, remove walls, rearrange rooms. add deck on 2/f. add 3 bedrooms, 2 full bathrs, family, relocate garage door on 1/f. replace windows with alum-clad wood. replace stucco & room. replace wather heater, furnace. upgrade e&pDetails
remodel kitchen, relocate bathroom, add 1/2 bathroom.replace stairs & skylights, remove walls, rearrange rooms. add deck on 2/f. add 3 bedrooms, 2 full bathrs, family, relocate garage door on 1/f. replace windows with alum-clad wood. replace stucco & room. replace wather heater, furnace. upgrade e&p | $150,000 |
| Sep 11, 2018 | Completed final sign-off May 2019 | 151 Beach St | installation of electrical system for veeder root, communication and fueling dispensers. reference p.a. # 2017 0213 9309Details
installation of electrical system for veeder root, communication and fueling dispensers. reference p.a. # 2017 0213 9309 | $25,000 |
| Apr 17, 2018 | Completed final sign-off May 2019 | 151 Beach St | revision to 201702139309. install dual piping fueling system instead of single piping fueling system. maher naDetails
revision to 201702139309. install dual piping fueling system instead of single piping fueling system. maher na | $400,000 |
| Jan 23, 2018 | Expired or cancelled cancelled Mar 2019 | 1849 Harrison St | concrete demo , new concrete foundation maher naDetails
concrete demo , new concrete foundation maher na | $35,000 |
| Jan 23, 2018 | Expired or cancelled cancelled Mar 2019 | 1940 Harrison St | concrete demo , new concrete foundation maher naDetails
concrete demo , new concrete foundation maher na | $35,000 |
| May 18, 2017 | Completed final sign-off May 2019 | 151 Beach St | temporary shoring and excavation. ref 2017-0213-9309, construction 24" concrete hydrocap. maher applicable > 50 yrdsDetails
temporary shoring and excavation. ref 2017-0213-9309, construction 24" concrete hydrocap. maher applicable > 50 yrds | $300,000 |
| Feb 13, 2017 | Completed final sign-off May 2019 | 151 Beach St | remove 2 (e) 20,000 gal single wall ust and (e) fuel dispensers #4-#6. instlal 2 (n) 20,000 gal double wall ust (diesel fuel supply) with new dispensers #7-#9, and new tank monitoring system/leak detection. ** maher: disturbance of at least 50 cu.yd. of soil; route to dph **Details
remove 2 (e) 20,000 gal single wall ust and (e) fuel dispensers #4-#6. instlal 2 (n) 20,000 gal double wall ust (diesel fuel supply) with new dispensers #7-#9, and new tank monitoring system/leak detection. ** maher: disturbance of at least 50 cu.yd. of soil; route to dph ** | $2,681,498 |
| Feb 13, 2017 | Completed final sign-off May 2021 | 1849 Harrison St | remove 2 waste tank system located on underground concrete valut, remove fuel 1,000 gallon above ground tanks in mechanical room, 5 (n) aboveground tanks ul 142, new hose reels, pumps, equipment & piping installed in mechanical room. n/a ordinance #155-13Details
remove 2 waste tank system located on underground concrete valut, remove fuel 1,000 gallon above ground tanks in mechanical room, 5 (n) aboveground tanks ul 142, new hose reels, pumps, equipment & piping installed in mechanical room. n/a ordinance #155-13 | $1,742,974 |
| Feb 13, 2017 | Completed final sign-off May 2019 | 1940 Harrison St | remove 2 waste tank system located in an underground concrete vault wall, replace with two new double walled above ground tank system and new tank monitoring system. ul142 n/a ordinance #155-13Details
remove 2 waste tank system located in an underground concrete vault wall, replace with two new double walled above ground tank system and new tank monitoring system. ul142 n/a ordinance #155-13 | $958,524 |