Gordon Prill Inc
- Based in
- Sunnyvale
- On San Francisco permits
- Dec 2025 to Feb 2026
- Last 24 months
- 2 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 11, 2026 | Completed final sign-off Mar 2026 | 215 Fremont St | arch, electrical, structural work in basement at (e) bike parking cage. relocate (e) fence & gate, new fence to match (e) including anchoring. install u shaped bike racks, new auto-operator at fence gate & modifications to lighting & power as required.Details
arch, electrical, structural work in basement at (e) bike parking cage. relocate (e) fence & gate, new fence to match (e) including anchoring. install u shaped bike racks, new auto-operator at fence gate & modifications to lighting & power as required. | $15,900 |
| Dec 5, 2025 | Completed final sign-off Mar 2026 | 215 Fremont St | 7th flr - mech scope incl install new water source heat pump (repl in-kind), new temp sensor reconnecting to existing utilities. 8th flr plumbing scope incl install of 3 new instahot and drain. structural scope includes anchoring of new heat pump. electrical scope includes disconnecting demolishedDetails
7th flr - mech scope incl install new water source heat pump (repl in-kind), new temp sensor reconnecting to existing utilities. 8th flr plumbing scope incl install of 3 new instahot and drain. structural scope includes anchoring of new heat pump. electrical scope includes disconnecting demolished | $98,000 |