Block 8719A, lot 008
300 Toni Stone Xing
- City’s use
- Government
- Built
- 2024
- Stories
- 13
- Building
- 319,119 sq ft
- Lot
- 33,057 sq ft
- Zoning
- NA
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
14 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 25, 2024 | In progress filed Apr 2024, not yet issued | 300 Toni Stone Cg | bulletin-6. addendum-3 rev5. rev to arch & mep (add# 3) for loading dock egress analysis. revised work includes relocation of exit sign above exit door (01-121a) at north service corridor. door hardware revised for free egress. ref port pa# b-2020-0163 & pa# 201910073785-s3.Details
bulletin-6. addendum-3 rev5. rev to arch & mep (add# 3) for loading dock egress analysis. revised work includes relocation of exit sign above exit door (01-121a) at north service corridor. door hardware revised for free egress. ref port pa# b-2020-0163 & pa# 201910073785-s3. | ||
| Mar 18, 2024 | In progress filed Mar 2024, not yet issued | 300 Toni Stone Cg | proj-24-0569; mou-port;rev to ti drawings for phone booth anchorage throughout building. no change in use or occupancy of any spaces. reference following permit applications: b-2022-0186, b2022-0208, b-2022-0213, b2023-0102. dbi pa# 202210275305, pa# 202211216982, pa# 202212128138, pa# 202306160296.Details
proj-24-0569; mou-port;rev to ti drawings for phone booth anchorage throughout building. no change in use or occupancy of any spaces. reference following permit applications: b-2022-0186, b2022-0208, b-2022-0213, b2023-0102. dbi pa# 202210275305, pa# 202211216982, pa# 202212128138, pa# 202306160296. | ||
| Mar 7, 2024 | In progress filed Mar 2024, not yet issued | 300 Toni Stone Cg | proj-24-0568; mou-port: revision to ti drawing for room indentification numbering throughout building. no change in use or occupancy of any spaces. reference following permit applications: port application# b-2022-0186, b-2022-0204, b-2022-0213, b-2023-0102. dbi pa# 202210275305, pa# 202211216982,Details
proj-24-0568; mou-port: revision to ti drawing for room indentification numbering throughout building. no change in use or occupancy of any spaces. reference following permit applications: port application# b-2022-0186, b-2022-0204, b-2022-0213, b-2023-0102. dbi pa# 202210275305, pa# 202211216982, | ||
| Mar 7, 2024 | In progress filed Mar 2024, not yet issued | 300 Toni Stone Cg | proj-24-0567; mou-port: revision for revised acoustical panel details & to clarify allowable combustible materials for furring strips. reference previously approved permit: b-2022-0186, b2022-0204, b-2022-0213. dbi pa# 202210275305 (phase 1), pa# 202211216982 (phrase 2), ph3 - pa# 202212128138.Details
proj-24-0567; mou-port: revision for revised acoustical panel details & to clarify allowable combustible materials for furring strips. reference previously approved permit: b-2022-0186, b2022-0204, b-2022-0213. dbi pa# 202210275305 (phase 1), pa# 202211216982 (phrase 2), ph3 - pa# 202212128138. | ||
| Jan 19, 2024 | In progress filed Jan 2024, not yet issued | 300 Toni Stone Cg | proj-24-0564: visa phase 3 - deferred free standing demountable partitions aka dirtt (shop drawings). work on level 12. reference pa #202212128138 port application #b-2022-0213.Details
proj-24-0564: visa phase 3 - deferred free standing demountable partitions aka dirtt (shop drawings). work on level 12. reference pa #202212128138 port application #b-2022-0213. | $168,000 | |
| Nov 20, 2023 | In progress filed Nov 2023, not yet issued | 300 Toni Stone Cg | proj-23-0544: revision to include exterior lighting on terraces for phase 1 and phase 3 visa t.i. permits. reference the following permits:ph1-pa# 202210275305 (b-2022-0186), ph1 rev pa# 202306160296 (b-2023-0102), ph3-pa# 202212128138 (b-2022-0213), terrace build-outs b-2021-0066 and b-2022-0223.Details
proj-23-0544: revision to include exterior lighting on terraces for phase 1 and phase 3 visa t.i. permits. reference the following permits:ph1-pa# 202210275305 (b-2022-0186), ph1 rev pa# 202306160296 (b-2023-0102), ph3-pa# 202212128138 (b-2022-0213), terrace build-outs b-2021-0066 and b-2022-0223. | $10,000 | |
| Oct 12, 2023 | In progress filed Oct 2023, not yet issued | 300 Toni Stone Cg | proj-23-0540: deferred free standing demountable partitions, aka dirtt (shop drawings). wokr on levels 6 through 11. reference pa # 202211216982 port application #b-2022-0204.Details
proj-23-0540: deferred free standing demountable partitions, aka dirtt (shop drawings). wokr on levels 6 through 11. reference pa # 202211216982 port application #b-2022-0204. | $1,100,000 | |
| Sep 13, 2023 | Never finaled filed Sep 2023, never issued | 300 Toni Stone Cg | proj-23-0539: visa ti phase 1 - deferred stair elements to furnish & install railings, guard rails & hangars. reference pa #202210275305 & port app # b-2022-0186 for stair slab opening, framing, stair stringer, tread & riser steel.Details
proj-23-0539: visa ti phase 1 - deferred stair elements to furnish & install railings, guard rails & hangars. reference pa #202210275305 & port app # b-2022-0186 for stair slab opening, framing, stair stringer, tread & riser steel. | $40,000 | |
| Aug 29, 2023 | Never finaled filed Aug 2023, never issued | 300 Toni Stone Cg | proj-23-0537 - port mou: deferred free standing demountable partitions, aka dirtt (shop drawings). work on level 2,3,4. reference pa # 202210275305 & #202306160296, port application # b-2022-0186 & # b-2023-0102.Details
proj-23-0537 - port mou: deferred free standing demountable partitions, aka dirtt (shop drawings). work on level 2,3,4. reference pa # 202210275305 & #202306160296, port application # b-2022-0186 & # b-2023-0102. | $210,000 | |
| Jun 16, 2023 | Never finaled filed Jun 2023, never issued | 300 Toni Stone Cg | proj-23-0531: tenant improvement revision to add a horizontal exit on level 5, revised demoition scope of existing building, reference pa # 202210275305 & b-2022-0186.Details
proj-23-0531: tenant improvement revision to add a horizontal exit on level 5, revised demoition scope of existing building, reference pa # 202210275305 & b-2022-0186. | $10,000 | |
| Dec 12, 2022 | Never finaled filed Dec 2022, never issued | 300 Toni Stone Cg | proj-22-0518 mayor ed-17-02 mission rock bldg g: t.i. of 2 full floors (12,13) & rooftop elevator lobby in (e) 13 story bldg. new interior construction of open work space, enclosed offices, meeting rooms, employee pantries, & all gender toilet rooms. no ext. work. no ooc. changeDetails
proj-22-0518 mayor ed-17-02 mission rock bldg g: t.i. of 2 full floors (12,13) & rooftop elevator lobby in (e) 13 story bldg. new interior construction of open work space, enclosed offices, meeting rooms, employee pantries, & all gender toilet rooms. no ext. work. no ooc. change | $25,000,000 | |
| Nov 21, 2022 | Never finaled filed Nov 2022, never issued | 300 Toni Stone Cg | proj-22-0514 mayor ed 17-02: mission rock bldg g - ti of 6 full flrs (6-11) in an (e) 13 story bldg. scope includes new interior construction of open work space, enclosed offices, meeting rooms, employee pantries, and all geder toilet rooms. no exterior work, no ooc change.Details
proj-22-0514 mayor ed 17-02: mission rock bldg g - ti of 6 full flrs (6-11) in an (e) 13 story bldg. scope includes new interior construction of open work space, enclosed offices, meeting rooms, employee pantries, and all geder toilet rooms. no exterior work, no ooc change. | $31,000,000 | |
| Oct 27, 2022 | Never finaled filed Oct 2022, never issued | 300 Toni Stone Cg | proj-22-0511, mayor ed-17-02: ti of 1 partial and 4 full floors in an exiting 13-story bldg. selective demo of structural slab for new interconnecting stair & new interior construction to include work open space, enclosed offices, meeting rooms, employee pantries,Details
proj-22-0511, mayor ed-17-02: ti of 1 partial and 4 full floors in an exiting 13-story bldg. selective demo of structural slab for new interconnecting stair & new interior construction to include work open space, enclosed offices, meeting rooms, employee pantries, | $22,000,000 | |
| Oct 7, 2019 | Never finaled filed Oct 2019, never issued | 300 Toni Stone Cg | for proj-19-0277; mayor dir# 17-02. mou proj port of sf. priority processing. (building g.) erect 13-stories, no basement, type i-a, commercial building with vacant office, retail, restaurant & assembly. (b, m, a-2, a-3)Details
for proj-19-0277; mayor dir# 17-02. mou proj port of sf. priority processing. (building g.) erect 13-stories, no basement, type i-a, commercial building with vacant office, retail, restaurant & assembly. (b, m, a-2, a-3) | $79,835,080 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Architects
- Lauren Jordan (3), Breck Polley (2), George Metzger
- Engineers
- Mark Koenigs
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.