Nicole Crone
- Listed as
- engineer
- Firm
- Alfatech
- Based in
- San Francisco
- On San Francisco permits
- Jan 2022 to Jan 2023
6 permits since 2000 (engineer on 6 permits): 4 completed, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 18, 2023 | Never finaled issued Jan 2023, no final | 1 Market St | Gci, Inc | 40th fl - revision to pa 2022-0126-6664 install new fire smoke damper at new shaft penetration. connect all new fsds to a new dedicated emergency circuit to existing panelDetails
40th fl - revision to pa 2022-0126-6664 install new fire smoke damper at new shaft penetration. connect all new fsds to a new dedicated emergency circuit to existing panel | |
| Oct 18, 2022 | Never finaled issued Dec 2022, no final | 1 Market St | Gci, Inc | 36th fl: vrf & erv system shall operate in smoke control mode along w/ building supply & return air system. ref pa #202201316997Details
36th fl: vrf & erv system shall operate in smoke control mode along w/ building supply & return air system. ref pa #202201316997 | $20,000 |
| Apr 28, 2022 | Completed final sign-off Mar 2023 | 405 Howard St | Skyline Construction | 2/f: mechanical, electrical, and plumbing system for 2/f tenant improvement. ref ti permit 202201186188.Details
2/f: mechanical, electrical, and plumbing system for 2/f tenant improvement. ref ti permit 202201186188. | |
| Jan 31, 2022 | Completed final sign-off Feb 2024 | 1 Market St | Gci, Inc | 36th floor: t.i. to include demo of non-structural partitions, lighting, power and data. construction of new non-load bearing partitions. new mep and structural work incl 6 new fsds. fire alarm and sprinkler under separate permits.Details
36th floor: t.i. to include demo of non-structural partitions, lighting, power and data. construction of new non-load bearing partitions. new mep and structural work incl 6 new fsds. fire alarm and sprinkler under separate permits. | $2,615,022 |
| Jan 27, 2022 | Completed final sign-off Sep 2023 | 1 Market St | Gci, Inc | 42/f: tenant improvement to include demo of non structural partitions, lighting, power and data. new ceilings and lighting. new mep. new all gender restrooms and structural work.Details
42/f: tenant improvement to include demo of non structural partitions, lighting, power and data. new ceilings and lighting. new mep. new all gender restrooms and structural work. | $2,615,022 |
| Jan 26, 2022 | Completed final sign-off Jan 2024 | 1 Market St | Gci, Inc | 40th fl - interior ti, demo non-structural partition & lighting. new non-structural load bearing partitions, suspended ceilings & lighting, new mech throughout, new plumbing & break rooms; mother's room, new data cabling and avDetails
40th fl - interior ti, demo non-structural partition & lighting. new non-structural load bearing partitions, suspended ceilings & lighting, new mech throughout, new plumbing & break rooms; mother's room, new data cabling and av | $2,615,022 |