Block 3722, lot 005
156 02nd St
- City’s use
- Commercial Office
- Built
- 1908
- Stories
- 6
- Rooms
- 12 bathrooms
- Building
- 33,787 sq ft
- Lot
- 4,599 sq ft
- Zoning
- C3O
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
30 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 17, 2026 | In progress issued Apr 2026 | 156 02nd St | Rise Rigging Llc | exterior facade repair/maintenance: selective mortar re-pointing throughoutDetails
exterior facade repair/maintenance: selective mortar re-pointing throughout | $38,500 |
| Aug 5, 2024 | In progress issued Aug 2024 | 108 Natoma St | per pa #201201273059, add new address 100 natoma st to apn 3722/005 for ti permit.Details
per pa #201201273059, add new address 100 natoma st to apn 3722/005 for ti permit. | ||
| Apr 25, 2024 | In progress issued Jul 2024 | 156 02nd St | Walls Construction And Contracting Inc | new observation deck at extg roof level.Details
new observation deck at extg roof level. | $63,000 |
| Dec 4, 2023 | In progress filed Dec 2023, not yet issued | 156 02nd St | assembly space @ ground floor & basement. no scope of workDetails
assembly space @ ground floor & basement. no scope of work | ||
| Mar 22, 2019 | Expired or cancelled cancelled Jan 2026 | 156 02nd St | mep submittal deferred. ref pa 2019-0222-3626Details
mep submittal deferred. ref pa 2019-0222-3626 | ||
| Feb 22, 2019 | Expired or cancelled cancelled Jan 2026 | 156 02nd St | Dpr Construction Inc | 1st-6th fl. 1st fl - demo & construction of nonstructural partitions, light fixtures, doors and millwork. new restrooms & ada upgrades, new lighting fixtures, new drinking fountains; 2nd - 6th fl - new lighting fixtures, updating finishes & new millwork. new drinking fountains. ada restrooms upgradeDetails
1st-6th fl. 1st fl - demo & construction of nonstructural partitions, light fixtures, doors and millwork. new restrooms & ada upgrades, new lighting fixtures, new drinking fountains; 2nd - 6th fl - new lighting fixtures, updating finishes & new millwork. new drinking fountains. ada restrooms upgrade | $1,437,541 |
| Jun 22, 2017 | Never finaled issued Jun 2017, no final | 156 02nd St | street space w/mtaDetails
street space w/mta | ||
| Feb 12, 2014 | Completed final sign-off Feb 2014 | 156 02nd St | H C I Systems Inc | 1st floor: add 2 horn strobes and 1 strobe to an extg fire alarm system in a new t.i. space. ref app#201312194616. there are no new mechanicals. n/a for the interim controls #428-13Details
1st floor: add 2 horn strobes and 1 strobe to an extg fire alarm system in a new t.i. space. ref app#201312194616. there are no new mechanicals. n/a for the interim controls #428-13 | $5,200 |
| Dec 19, 2013 | Completed final sign-off Feb 2014 | 156 02nd St | P 3 Construction & Remodeling Inc | 1st fl. t.i. renovation of (e) office. new non-structural partitions, door, cabinets. plumbing & electrical under separate permit.Details
1st fl. t.i. renovation of (e) office. new non-structural partitions, door, cabinets. plumbing & electrical under separate permit. | $90,000 |
| Oct 1, 2013 | Never finaled issued Oct 2013, no final | 156 02nd St | Maguire Inc Dba Lahue And Associates | basement thru 6th floor-evacuation maps (signs)-18 totalDetails
basement thru 6th floor-evacuation maps (signs)-18 total | $5,400 |
| May 18, 2012 | Completed final sign-off Jan 2013 | 156 02nd St | San Francisco Fire Protection | fire alarm "as builts" to show additional equipment-7 relays, 1 strobe, 2 point modules & 1 smokeDetails
fire alarm "as builts" to show additional equipment-7 relays, 1 strobe, 2 point modules & 1 smoke | $4,000 |
| Apr 2, 2012 | Completed final sign-off Jan 2013 | 156 02nd St | San Francisco Fire Protection | t.i. improvement on 1st floor and basement. re use and relocate extg fire alarm devices to locations as indicated.Details
t.i. improvement on 1st floor and basement. re use and relocate extg fire alarm devices to locations as indicated. | $3,500 |
| Feb 29, 2012 | Completed final sign-off Jan 2013 | 156 02nd St | San Francisco Fire Protection | relocate extg devices due to t.i. and add 6 speaker/strobes and 2 strobes.Details
relocate extg devices due to t.i. and add 6 speaker/strobes and 2 strobes. | $3,000 |
| Feb 22, 2012 | Completed final sign-off May 2012 | 156 02nd St | Madden Plumbing, Llc | install 10 heads on 1st floor & relocate 6 heads & add 2 heads on mezzanine floorDetails
install 10 heads on 1st floor & relocate 6 heads & add 2 heads on mezzanine floor | $5,000 |
| Jan 27, 2012 | Completed final sign-off Jun 2012 | 156 02nd St | 3 D Design & Construction Inc | interior non structural remodel on basement and ground floor areasDetails
interior non structural remodel on basement and ground floor areas | $65,000 |
| Dec 19, 2011 | Expired or cancelled cancelled Dec 2012 | 156 02nd St | Eagle Bay Enterprises, Inc (Dba Garnett | to erect non electrical 2 banners applied to side of bldg.Details
to erect non electrical 2 banners applied to side of bldg. | $5,000 |
| Dec 15, 2011 | Completed final sign-off Jan 2013 | 156 02nd St | 3 D Design & Construction Inc | demolition of partitions, doors, ceilings. non structural demo only at 1st fl and basement. tenant improvement under sep permitDetails
demolition of partitions, doors, ceilings. non structural demo only at 1st fl and basement. tenant improvement under sep permit | $32,000 |
| Dec 13, 2011 | Completed final sign-off Jan 2013 | 156 02nd St | San Francisco Fire Protection | 2nd floor-tenant improvement work-relocation of fire alarm devicesDetails
2nd floor-tenant improvement work-relocation of fire alarm devices | $2,500 |
| Nov 14, 2011 | Completed final sign-off Dec 2011 | 156 02nd St | San Francisco Fire Protection | 3rd floor:relocate extg devices due to tenant improvement and add 5 strobes.4th floor:relocate extg devices due to tennant improvements add 5 strobes.Details
3rd floor:relocate extg devices due to tenant improvement and add 5 strobes.4th floor:relocate extg devices due to tennant improvements add 5 strobes. | $3,000 |
| Nov 1, 2011 | Never finaled issued Nov 2011, no final | 156 02nd St | P 3 Construction & Remodeling Inc | provide accessible restroom at unoccupied retail space. provide (n) gypboard throughout and storageDetails
provide accessible restroom at unoccupied retail space. provide (n) gypboard throughout and storage | $7,000 |
| Sep 23, 2011 | Completed final sign-off Jan 2012 | 156 02nd St | San Francisco Fire Protection | 5th & 6th floors-tenant improvement-replace 5 speaker/strobes with strobe & re-configure (e) devices to remodelDetails
5th & 6th floors-tenant improvement-replace 5 speaker/strobes with strobe & re-configure (e) devices to remodel | $5,000 |
| Sep 22, 2011 | Completed final sign-off May 2012 | 156 02nd St | mechanical & electrical work associated with pa# 2011-0823-3070, includes title 24 complianceDetails
mechanical & electrical work associated with pa# 2011-0823-3070, includes title 24 compliance | $65,000 | |
| Sep 14, 2011 | Completed final sign-off Oct 2011 | 156 02nd St | Madden Plumbing, Llc | 2nd-6th floor:remove 2 extg sprinkler heads and relocate 2 extg heads type on floors 2-6. relocate extg 3" standpipe/hose cabinets with in new stair enclusure.Details
2nd-6th floor:remove 2 extg sprinkler heads and relocate 2 extg heads type on floors 2-6. relocate extg 3" standpipe/hose cabinets with in new stair enclusure. | $17,500 |
| Aug 23, 2011 | Completed final sign-off Jun 2012 | 156 02nd St | 3 D Design & Construction Inc | interior non structural remodel of floors 2-6 new partitions, finishes and lighting. fire alarm and mechanical work under seperate permit.Details
interior non structural remodel of floors 2-6 new partitions, finishes and lighting. fire alarm and mechanical work under seperate permit. | $200,000 |
| Jun 17, 2011 | Never finaled issued Jul 2011, no final | 156 02nd St | Pmk Construction | interior non structural demo for floors 1-6. all work to comply with ab-17Details
interior non structural demo for floors 1-6. all work to comply with ab-17 | $60,000 |
| May 24, 2011 | Never finaled issued Nov 2011, no final | 156 02nd St | remodel (e) office lobby. remove (e) exterior awnings, light fixtures & exposed conduit. new storefront & entry to ground floor retail space.Details
remodel (e) office lobby. remove (e) exterior awnings, light fixtures & exposed conduit. new storefront & entry to ground floor retail space. | $112,000 | |
| Dec 4, 2006 | Expired or cancelled expired Jun 2008 | 156 02nd St | Tyco Integrated Security | there is no elevator shutdown there for one heat detector to be removed from elevator equipment room for final test. revision to pa# 200606224740, per field inspector, as builts.Details
there is no elevator shutdown there for one heat detector to be removed from elevator equipment room for final test. revision to pa# 200606224740, per field inspector, as builts. | |
| Jun 22, 2006 | Never finaled issued Jul 2006, no final | 156 02nd St | Tyco Integrated Security | install fire panel & voice e-vac system in a basement and fire protection devices thruout the floors. monitoring per nfpa 72 remote sytem monitoring.Details
install fire panel & voice e-vac system in a basement and fire protection devices thruout the floors. monitoring per nfpa 72 remote sytem monitoring. | $34,925 |
| Jan 10, 2005 | Completed final sign-off Dec 2005 | 156 02nd St | prepare for instalation of new emergency generator, reinforce (e) steel beam support and install newDetails
prepare for instalation of new emergency generator, reinforce (e) steel beam support and install new | $42,000 | |
| Apr 4, 2001 | Expired or cancelled expired Apr 2002 | 156 02nd St | street space useDetails
street space use |
Find contractors for work like this