Gci, Inc
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Sep 2026
- Last 24 months
- 213 permits filed
3,137 permits since 2000: 2,319 completed, 142 in progress, 402 never finaled, 274 expired or cancelled.
Of the 402 never-finaled permits, 27 are 3 to 5 years old, 98 are 5 to 10 years old, 277 are over 10 years old. 3 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
17 deck permits: 10 completed, 1 in progress, 4 never finaled, 2 expired or cancelled. Typically 55 days from filing to permit and 164 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 31, 2025 | In progress issued Jun 2026 | 221 Main St | demolition of structural deck between level 5 and 6. construct new stair.Details
demolition of structural deck between level 5 and 6. construct new stair. | $700,000 |
| Jul 25, 2025 | Completed final sign-off Sep 2025 | 150 Parker Av | (e) art room to (n) classrooom conversion. add pocket door, reconstruct (e) stair, new exterior awning, new low to ground plane deck & ramp, add 1 sink.Details
(e) art room to (n) classrooom conversion. add pocket door, reconstruct (e) stair, new exterior awning, new low to ground plane deck & ramp, add 1 sink. | $25,000 |
| Dec 18, 2023 | Completed final sign-off Nov 2024 | 450 Mission St | repair to (e) concrete slabs & beams below sidewalka along mission & 1st st in accomondate w/ ch 4 od sfbc, new metal decking, steele legger angles, steel beams, metal & wood shoring posts & concrete. comply w/ nov 202310119Details
repair to (e) concrete slabs & beams below sidewalka along mission & 1st st in accomondate w/ ch 4 od sfbc, new metal decking, steele legger angles, steel beams, metal & wood shoring posts & concrete. comply w/ nov 202310119 | $300,000 |
| Oct 28, 2021 | Completed final sign-off Sep 2022 | 201 03rd St | installn of (n) sculpture at extg exter grnd level plaza demo including removal of extg raised deck wood slat panels & any sub-deck items.(pedinstall concrete slab on grade and/or grade fill)for new work. install include nw metal sculpture, nw concrete base with n lghtg & n steel, as requiredDetails
installn of (n) sculpture at extg exter grnd level plaza demo including removal of extg raised deck wood slat panels & any sub-deck items.(pedinstall concrete slab on grade and/or grade fill)for new work. install include nw metal sculpture, nw concrete base with n lghtg & n steel, as required | $40,000 |
| Sep 19, 2020 | Completed final sign-off Aug 2021 | 444 Battery St | replacement of cast gypsum roof with concrete filled met deck & other diaphragm strengthening. alterations to the mechanical/mezzanine and repairs to interior concrete block walls.Details
replacement of cast gypsum roof with concrete filled met deck & other diaphragm strengthening. alterations to the mechanical/mezzanine and repairs to interior concrete block walls. | $1,500,000 |
| Nov 29, 2018 | Completed final sign-off Aug 2019 | 3154 Fillmore St | addition of deck on mezzanine level. no change to building occupancy is proposed. deck is only to be used by occupants of 2nd floor & mezzanine. ground floor restaurant is separate use with no access to deck.Details
addition of deck on mezzanine level. no change to building occupancy is proposed. deck is only to be used by occupants of 2nd floor & mezzanine. ground floor restaurant is separate use with no access to deck. | $12,000 |
| Aug 30, 2016 | Completed final sign-off May 2019 | 795 Folsom St | alteration work to the roof level to provide a terrace as an amenity/assembly to the (e) bldg occupants. work includes addition of elevator lobby at roof, raised decking & planting, enclosed exit stair to connect to (e) exit stairs. walls, doors, finishes per plan. *maher: n/a*Details
alteration work to the roof level to provide a terrace as an amenity/assembly to the (e) bldg occupants. work includes addition of elevator lobby at roof, raised decking & planting, enclosed exit stair to connect to (e) exit stairs. walls, doors, finishes per plan. *maher: n/a* | $1,800,000 |
| Mar 25, 2016 | Completed final sign-off Aug 2016 | 425 Market St | 26th floor structural design - new walls, still anchorage & head connection for dirtt walls which will be anchored to the concrete deck below. ref t.i. #201512013836.Details
26th floor structural design - new walls, still anchorage & head connection for dirtt walls which will be anchored to the concrete deck below. ref t.i. #201512013836. | $35,000 |
| Dec 7, 2015 | Completed final sign-off Apr 2016 | 50 Fremont St | 2nd floor: infilling deck at old hvac shaft. n/a for maherDetails
2nd floor: infilling deck at old hvac shaft. n/a for maher | $1,000 |
| Nov 7, 2013 | Never finaled issued Feb 2014, no final | 405 Howard St | new deck on the extg 6/f roof; less than 50 occupants; replace extg cast paver with new tiles, planter boxes and seats. verify exiting and panic hardware; accessory use to office; fire alarm separate permit.Details
new deck on the extg 6/f roof; less than 50 occupants; replace extg cast paver with new tiles, planter boxes and seats. verify exiting and panic hardware; accessory use to office; fire alarm separate permit. | $8,500 |
| May 30, 2013 | Completed final sign-off Mar 2014 | 135 Mississippi St | exterior improvements including new deck and new mechanical equipment lift on 6' columns. replace 3 windows with new roll up window/doors. ugrade 2 exit doors.no interior workDetails
exterior improvements including new deck and new mechanical equipment lift on 6' columns. replace 3 windows with new roll up window/doors. ugrade 2 exit doors.no interior work | $486,000 |
| Feb 26, 2013 | Never finaled issued Apr 2013, no final | 3 Embarcadero Center | ground floor:demolish extg water feature and concrete bench. replace with new concrete bench.wood decking,planters & accent lighting. structural,mech, elect, plmg, and life safety engineering to be performed as required, on a design/bld basic and shall be submitted as part of a separate permit.Details
ground floor:demolish extg water feature and concrete bench. replace with new concrete bench.wood decking,planters & accent lighting. structural,mech, elect, plmg, and life safety engineering to be performed as required, on a design/bld basic and shall be submitted as part of a separate permit. | $150,000 |
| Feb 26, 2013 | Never finaled issued Apr 2013, no final | 2 Embarcadero Center | ground floor:demolish extg water feature and concrete bench.replace with new concrete benches, wood decking,planters, & accent lighting. structural,mech, elect, plmg, and life safety engineering to be performed as required, on a design/bld basic and shall be submitted as part of a separate permit.Details
ground floor:demolish extg water feature and concrete bench.replace with new concrete benches, wood decking,planters, & accent lighting. structural,mech, elect, plmg, and life safety engineering to be performed as required, on a design/bld basic and shall be submitted as part of a separate permit. | $150,000 |
| Mar 2, 2012 | Expired or cancelled expired Mar 2014 | 405 Howard St | installation of a dry cooler unit on an extg deck adjacent to extg tenant space on 6th floor.Details
installation of a dry cooler unit on an extg deck adjacent to extg tenant space on 6th floor. | $100,000 |
| Jun 5, 2009 | Completed final sign-off Oct 2009 | 575 Market St | between levels 39th & 40th floor - demolish an existing inter-floor stair, infill 40th floor opeings with new structural deck. floors are currently un-occupied with all interior construction previously removed. remain unoccupaied until future tenant improvements are permitted.Details
between levels 39th & 40th floor - demolish an existing inter-floor stair, infill 40th floor opeings with new structural deck. floors are currently un-occupied with all interior construction previously removed. remain unoccupaied until future tenant improvements are permitted. | $75,000 |
| Jul 27, 2005 | Never finaled issued Sep 2005, no final | 4 Embarcadero Center | demolition of non-emergency egress stair & installation of steel beams, decking & concrete forDetails
demolition of non-emergency egress stair & installation of steel beams, decking & concrete for | $80,000 |
| Jul 21, 2005 | Expired or cancelled expired Feb 2009 | 1 Lombard St | addition of deck to existing roof access to include demolition of double door and replace with storeDetails
addition of deck to existing roof access to include demolition of double door and replace with store | $30,000 |