Gci, Inc
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Sep 2026
- Last 24 months
- 213 permits filed
3,137 permits since 2000: 2,319 completed, 142 in progress, 402 never finaled, 274 expired or cancelled.
Of the 402 never-finaled permits, 27 are 3 to 5 years old, 98 are 5 to 10 years old, 277 are over 10 years old. 3 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
106 stairs permits: 75 completed, 9 in progress, 16 never finaled, 6 expired or cancelled. Typically 15 days from filing to permit and 278 days from permit to final inspection.
Showing the 100 most recent of 106.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 28, 2026 | In progress filed Sep 2026, not yet issued | 4 Embarcadero Center | level 16 - 18: finish and guardrail work to (e) stair.Details
level 16 - 18: finish and guardrail work to (e) stair. | $29,000 |
| Sep 14, 2026 | In progress filed Sep 2026, not yet issued | 1 Front St | interior renovation at 2nd floor, (n) bar, (n) gym and (n) coworking office, (n) ceiling, lighting, millwork and finishes. (n) connecting stair from 1/f to 2/f.Details
interior renovation at 2nd floor, (n) bar, (n) gym and (n) coworking office, (n) ceiling, lighting, millwork and finishes. (n) connecting stair from 1/f to 2/f. | $16,000,000 |
| Jul 20, 2026 | In progress issued Jul 2026 | 101 Mission St | new interconnected stair betweem 19 flr & 20 flr.Details
new interconnected stair betweem 19 flr & 20 flr. | $450,000 |
| Jul 14, 2026 | In progress issued Aug 2026 | 1 Maritime Pz | removal of interconnecting non egress stair and structural slab infill between floors 4 and 5. north suite (suite 400) scopes include demo of non structural partitions, ceilings, finishes, mep. new paint and general lighting throughout to prepare suite for marketing. no occupancy at the end of theDetails
removal of interconnecting non egress stair and structural slab infill between floors 4 and 5. north suite (suite 400) scopes include demo of non structural partitions, ceilings, finishes, mep. new paint and general lighting throughout to prepare suite for marketing. no occupancy at the end of the | $165,418 |
| Jun 8, 2026 | In progress issued Aug 2026 | 444 De Haro St | ground floor- install (n) 2 hour rated stair access from floor 2 to street level at (e)} loading dock. (n) structrual pad for (e) compactor. (n) lighting and finishes. upgrade (e) floor 2 restroom for accessibilityu compliance. mep under seperate permitDetails
ground floor- install (n) 2 hour rated stair access from floor 2 to street level at (e)} loading dock. (n) structrual pad for (e) compactor. (n) lighting and finishes. upgrade (e) floor 2 restroom for accessibilityu compliance. mep under seperate permit | $460,000 |
| Dec 31, 2025 | In progress issued Jun 2026 | 221 Main St | demolition of structural deck between level 5 and 6. construct new stair.Details
demolition of structural deck between level 5 and 6. construct new stair. | $700,000 |
| Dec 18, 2025 | Completed final sign-off Jun 2026 | 303 02nd St | strengthening of communicating stair between 8th and 7th floor to reduce vibration and stair tread cracking.Details
strengthening of communicating stair between 8th and 7th floor to reduce vibration and stair tread cracking. | $60,000 |
| Nov 17, 2025 | Completed final sign-off Dec 2025 | 50 Fremont St | 19th/flr and 20th/flr: new interior partition at existing 20th floor. communication stair, construction of new swinging gate at 19th floor landing of the same stair.Details
19th/flr and 20th/flr: new interior partition at existing 20th floor. communication stair, construction of new swinging gate at 19th floor landing of the same stair. | $80,000 |
| Jul 25, 2025 | Completed final sign-off Sep 2025 | 150 Parker Av | (e) art room to (n) classrooom conversion. add pocket door, reconstruct (e) stair, new exterior awning, new low to ground plane deck & ramp, add 1 sink.Details
(e) art room to (n) classrooom conversion. add pocket door, reconstruct (e) stair, new exterior awning, new low to ground plane deck & ramp, add 1 sink. | $25,000 |
| Jul 8, 2025 | In progress issued Aug 2025 | 1 Maritime Pz | 24th/f & 23rd/f: interconnection stairs connecting 23rd & 24th fl & restroom upgradesDetails
24th/f & 23rd/f: interconnection stairs connecting 23rd & 24th fl & restroom upgrades | $100,125 |
| Apr 15, 2025 | Completed final sign-off Jan 2026 | 221 Main St | priority processing per ab-004.t.i of suites 104 & 250 on 1st fl & 2nd fl to create space for non-profit,private school for for grade 6-12,interior demolition of interior,including portion of 2nd fl structural slab for(n) stair opening,construction of(n)paritions doors,ceilings,finishes,fixtures.Details
priority processing per ab-004.t.i of suites 104 & 250 on 1st fl & 2nd fl to create space for non-profit,private school for for grade 6-12,interior demolition of interior,including portion of 2nd fl structural slab for(n) stair opening,construction of(n)paritions doors,ceilings,finishes,fixtures. | $10,000,000 |
| Sep 4, 2024 | In progress issued Jun 2025 | 88 Spear St | retail and office renovation to (e) bldg. levels b, 1, 2 core, shell and interior amenities renovation. separation of north and south side of lvl 1 w/1-hr rated construction. construction of inter story feature stairs in basement to lvl 1, and lvl 1 to lvl 2. demo (e) restrooms and construct (n)....Details
retail and office renovation to (e) bldg. levels b, 1, 2 core, shell and interior amenities renovation. separation of north and south side of lvl 1 w/1-hr rated construction. construction of inter story feature stairs in basement to lvl 1, and lvl 1 to lvl 2. demo (e) restrooms and construct (n).... | $5,500,000 |
| Jul 30, 2024 | Completed final sign-off Sep 2024 | 50 Fremont St | construction of new non rated interior partitions for security purposes at existing 21st fl communicating stair, new swinging security gate at 20th fl landing of same stairDetails
construction of new non rated interior partitions for security purposes at existing 21st fl communicating stair, new swinging security gate at 20th fl landing of same stair | $400,000 |
| Dec 13, 2023 | Completed final sign-off Dec 2024 | 4 Embarcadero Center | removal of interconnecting staircase and infill slab between floors 31 and 32. no change of occupancy or use.Details
removal of interconnecting staircase and infill slab between floors 31 and 32. no change of occupancy or use. | $65,481 |
| Nov 30, 2023 | Completed final sign-off Jan 2024 | 1035 Market St | floors 2-4: tenant improvement. demolish non-exit communicating stair, infill floor opening to match surrounding construction. mep deferred.Details
floors 2-4: tenant improvement. demolish non-exit communicating stair, infill floor opening to match surrounding construction. mep deferred. | $88,000 |
| Jul 18, 2023 | Completed final sign-off Jan 2024 | 350 Beach St | remove/replace (e) southeast steel stair & concrete, landings, handrails, and guardrails, replace w/new disbaled access compliant steel stair, landings, handrails, and guardrails.Details
remove/replace (e) southeast steel stair & concrete, landings, handrails, and guardrails, replace w/new disbaled access compliant steel stair, landings, handrails, and guardrails. | $194,000 |
| May 22, 2023 | In progress issued Jan 2024 | 345 California St | rev pa202103086103: rev to design/details of stairs and removal of fire door at 31/32 flrs; interior improvements on the 30/31/32 flrs. 30/31/32 demo of (e) stairs from floors 31-32. new communicating stairs through floors 30-32. maher n/a.Details
rev pa202103086103: rev to design/details of stairs and removal of fire door at 31/32 flrs; interior improvements on the 30/31/32 flrs. 30/31/32 demo of (e) stairs from floors 31-32. new communicating stairs through floors 30-32. maher n/a. | |
| Apr 21, 2023 | Completed final sign-off Apr 2024 | 1201 Bryant St | demolish and rebuild cast in place concrete gr fl exit stair to align bottom landing w grade @ exterior. replace railings, guardrails, and doorDetails
demolish and rebuild cast in place concrete gr fl exit stair to align bottom landing w grade @ exterior. replace railings, guardrails, and door | $50,000 |
| Mar 15, 2022 | Never finaled issued Mar 2022, no final | 555 Market St | floors 8 and 10: demo of non structural partitions, light fixutres and ceiling tile. new security hallways with non structural partitions, doors, frames and lighting from elevator to exit stair, new gender neutral restrooms.Details
floors 8 and 10: demo of non structural partitions, light fixutres and ceiling tile. new security hallways with non structural partitions, doors, frames and lighting from elevator to exit stair, new gender neutral restrooms. | $800,000 |
| Aug 6, 2021 | Completed final sign-off Feb 2023 | 1 Embarcadero Center | ti w/removal (e) walls & replaced with new. new interior finishes. removal of (e) interconnecting stair between 34th & 35th floor. close opening w/2-hr fire rated floor construction. fire alarm/sprinkler deferred permits.Details
ti w/removal (e) walls & replaced with new. new interior finishes. removal of (e) interconnecting stair between 34th & 35th floor. close opening w/2-hr fire rated floor construction. fire alarm/sprinkler deferred permits. | $1,200,000 |
| Jul 16, 2021 | Completed final sign-off Oct 2021 | 50 Fremont St | 35/f & 36/f: addition of security partition wall on floor 35 @ (e) interconnecting convenience stair, add an exit prevention gate @ 36/f add an exit sign to landing between the 35th and 36th floor to direct people out of the stairwell.Details
35/f & 36/f: addition of security partition wall on floor 35 @ (e) interconnecting convenience stair, add an exit prevention gate @ 36/f add an exit sign to landing between the 35th and 36th floor to direct people out of the stairwell. | $28,000 |
| Mar 8, 2021 | Never finaled issued May 2021, no final | 345 California St | revision to pa# 202009234825. to increase scope to add communicating stair. 31st to 32nd floor structural support.Details
revision to pa# 202009234825. to increase scope to add communicating stair. 31st to 32nd floor structural support. | $50,000 |
| Nov 13, 2020 | Completed final sign-off Mar 2022 | 100 Hooper St | unit 8: spec suite build out including construction of rated and non-rated walls, conference & meeting rooms, electrical room, break room, & lighting. (e) mezz, lift & stairs approved under pa 201906113160.Details
unit 8: spec suite build out including construction of rated and non-rated walls, conference & meeting rooms, electrical room, break room, & lighting. (e) mezz, lift & stairs approved under pa 201906113160. | $1,000,000 |
| Oct 30, 2020 | Completed final sign-off Feb 2021 | 50 Fremont St | 3/f, 4/f: revision to pa # 201906052553 to extend the bottom guardrail 11" (3/f) at the interconnection stair to terminate closer to the (e) handrail.Details
3/f, 4/f: revision to pa # 201906052553 to extend the bottom guardrail 11" (3/f) at the interconnection stair to terminate closer to the (e) handrail. | |
| Sep 30, 2020 | Completed final sign-off Mar 2022 | 100 Hooper St | suite #3: construction of mezzanine, accessible lift, stairs in existing core and shell building.Details
suite #3: construction of mezzanine, accessible lift, stairs in existing core and shell building. | $150,000 |
| Sep 24, 2020 | Completed final sign-off Nov 2021 | 444 De Haro St | suite #100: new communicating stair. deferred submittal. ref. pa#2020-0915-4218 and #2020-1022-7121.Details
suite #100: new communicating stair. deferred submittal. ref. pa#2020-0915-4218 and #2020-1022-7121. | $190,000 |
| Sep 23, 2020 | Never finaled issued Dec 2020, no final | 345 California St | 30-31/f: new communicating stair on 30-31st floor: new non-structurual partitions m, new doors & hardware. new structural support.Details
30-31/f: new communicating stair on 30-31st floor: new non-structurual partitions m, new doors & hardware. new structural support. | $350,000 |
| Mar 5, 2020 | Completed final sign-off Jul 2020 | 345 California St | ti on 25th & 26th fl: new interior non-structural partition to enclose (e) communicating stair, new non-structural partial height wall at reception.Details
ti on 25th & 26th fl: new interior non-structural partition to enclose (e) communicating stair, new non-structural partial height wall at reception. | $12,000 |
| Aug 22, 2019 | Completed final sign-off Apr 2022 | 100 Hooper St | revision to app#201906042400. revised lift layout and relocated stairs. n/a for maherDetails
revision to app#201906042400. revised lift layout and relocated stairs. n/a for maher | $1,000 |
| Aug 6, 2019 | Completed final sign-off Apr 2021 | 415 Mission St | 51st - 54th floor - egress stair upgrade to stair #1 & stair #2 only buff existing concrete floor, refresh paint; replace light fixtures, new drop ceiling, relocate sprinkler head in new drop ceilingDetails
51st - 54th floor - egress stair upgrade to stair #1 & stair #2 only buff existing concrete floor, refresh paint; replace light fixtures, new drop ceiling, relocate sprinkler head in new drop ceiling | $10,000 |
| Aug 2, 2019 | Completed final sign-off Nov 2020 | 100 01st St | exterior gate & fence 5'7" high at top of stair from mission st.Details
exterior gate & fence 5'7" high at top of stair from mission st. | $50,000 |
| Jul 8, 2019 | Completed final sign-off Jul 2020 | 101 Mission St | 22/f:interior ti consists of new connecting stair. unoccupied 21st and 22nd floors. no change use, occupancy, floor area or building height. this suite will remain unoccupied at completion of projectDetails
22/f:interior ti consists of new connecting stair. unoccupied 21st and 22nd floors. no change use, occupancy, floor area or building height. this suite will remain unoccupied at completion of project | $150,000 |
| Jun 11, 2019 | Completed final sign-off Mar 2022 | 100 Hooper St | unit 8: construction of new mezzanine level, accessible lift, stairs in (e) core and shell building. maher n/a.Details
unit 8: construction of new mezzanine level, accessible lift, stairs in (e) core and shell building. maher n/a. | $150,000 |
| Jun 5, 2019 | Completed final sign-off Feb 2021 | 50 Fremont St | revision to pa 201902203351 to revise support for the interconnecting stair between 3rd & 4th flr to be suspended from the 4th floor opening.Details
revision to pa 201902203351 to revise support for the interconnecting stair between 3rd & 4th flr to be suspended from the 4th floor opening. | |
| Jun 4, 2019 | Completed final sign-off Apr 2022 | 100 Hooper St | unit 6 - construction of mazzanine, accessible lift & stairs in (e) core & shell building n/a maherDetails
unit 6 - construction of mazzanine, accessible lift & stairs in (e) core & shell building n/a maher | $180,000 |
| Feb 20, 2019 | Completed final sign-off Oct 2020 | 50 Fremont St | construction of communicating stair between floors 3 & 4 to include demo. of (e) floor assembly and construction of new stair soffit and finishesDetails
construction of communicating stair between floors 3 & 4 to include demo. of (e) floor assembly and construction of new stair soffit and finishes | $200,000 |
| Feb 7, 2019 | Completed final sign-off Jul 2020 | 1 Maritime Pz | 4/f & 5/f: new communicating stair between 4th and 5th floors. ref t.i. pa#201901180717. maher n/a.Details
4/f & 5/f: new communicating stair between 4th and 5th floors. ref t.i. pa#201901180717. maher n/a. | $300,000 |
| Jan 18, 2019 | Completed final sign-off Jul 2020 | 1 Maritime Pz | 4th & 5th fl - new partitions, ceilings & finishes on existing partial 4th & 5th floor. new open stairway between 4th & 5th floorDetails
4th & 5th fl - new partitions, ceilings & finishes on existing partial 4th & 5th floor. new open stairway between 4th & 5th floor | $4,000,000 |
| Dec 26, 2018 | Expired or cancelled cancelled Oct 2019 | 1 Market St | 10/f: limited interior remodeling: providing temporary demissing wall at (e) interconnecting stairs. maher n/a.Details
10/f: limited interior remodeling: providing temporary demissing wall at (e) interconnecting stairs. maher n/a. | $4,000 |
| Dec 19, 2018 | Completed final sign-off Sep 2019 | 50 Fremont St | 32nd-34th flrs. stair refresh at (e) communicating stair between floors incl selective finish demolition at stair, removal of (e) architectural element w/ handrail and associated lighting.Details
32nd-34th flrs. stair refresh at (e) communicating stair between floors incl selective finish demolition at stair, removal of (e) architectural element w/ handrail and associated lighting. | $300,000 |
| Dec 12, 2018 | Completed final sign-off Jul 2019 | 50 Fremont St | 27-30th flrs. stair refresh at existing communicating stair between 28, 29, 30 incl selective demo at stair, removal so (e) architectural element w/ handrail & associated lightingDetails
27-30th flrs. stair refresh at existing communicating stair between 28, 29, 30 incl selective demo at stair, removal so (e) architectural element w/ handrail & associated lighting | $200,000 |
| Oct 29, 2018 | Completed final sign-off May 2021 | 100 Hooper St | suite 4. construction of steel mezzanine, accessible lift and stairs at (e) core and shell building (pa# 2014-1020-9377). storm water drain rerouted. maher n/aDetails
suite 4. construction of steel mezzanine, accessible lift and stairs at (e) core and shell building (pa# 2014-1020-9377). storm water drain rerouted. maher n/a | $161,000 |
| Oct 11, 2018 | Completed final sign-off Apr 2021 | 415 Mission St | deferred conveince stairs to connect 53rd & 54th floors. ref 201809119774 (53rd) and 201809119778 (54th) and 201809140286/slab hole cutDetails
deferred conveince stairs to connect 53rd & 54th floors. ref 201809119774 (53rd) and 201809119778 (54th) and 201809140286/slab hole cut | $100,000 |
| Sep 14, 2018 | Completed final sign-off Apr 2021 | 415 Mission St | demo hole in floor slab for future inerconnecting stair for 53rd and 54th floor. ab-017. ref app#201809119778 54th and ref app#201809119774 for 53rd floor t.i.. n/a for maherDetails
demo hole in floor slab for future inerconnecting stair for 53rd and 54th floor. ab-017. ref app#201809119778 54th and ref app#201809119774 for 53rd floor t.i.. n/a for maher | $250,000 |
| Aug 8, 2018 | Completed final sign-off May 2019 | 50 Fremont St | construction of communication stair for floors 19, 20, 21 including demolition of floor slab. maher n/a.Details
construction of communication stair for floors 19, 20, 21 including demolition of floor slab. maher n/a. | $250,000 |
| May 24, 2018 | Completed final sign-off Apr 2022 | 100 Hooper St | first floor ti for spec space.construction of mezzanine, accesible with lift & stairs in existing core & shell. n/a maherDetails
first floor ti for spec space.construction of mezzanine, accesible with lift & stairs in existing core & shell. n/a maher | $150,000 |
| May 4, 2018 | Completed final sign-off Aug 2020 | 100 Hooper St | suite 7: construction of mezzanine, accessible lift and stairs in extg core and shellDetails
suite 7: construction of mezzanine, accessible lift and stairs in extg core and shell | $500,000 |
| Apr 16, 2018 | Never finaled issued May 2018, no final | 50 Fremont St | 11th fl - revision to pa 2017-1227-7399 to remove 3 treads & risers add 3 new risers & treads . add draft stop, updated elevations- revised details for stair layout . mechanical. mech & elec revisoins included.Details
11th fl - revision to pa 2017-1227-7399 to remove 3 treads & risers add 3 new risers & treads . add draft stop, updated elevations- revised details for stair layout . mechanical. mech & elec revisoins included. | |
| Apr 13, 2018 | Expired or cancelled expired Sep 2021 | 1 Maritime Pz | 6th and 7th floor: revision to app#201802070612: addition of structural steel beam and width to stair. n/a for maherDetails
6th and 7th floor: revision to app#201802070612: addition of structural steel beam and width to stair. n/a for maher | $7,500 |
| Apr 5, 2018 | Completed final sign-off Jun 2019 | 222 Kearny St | demolition of interconnecting stair at 8th floor and new floor infill. new structural work. ada restroom upgrades. no mep work fire life/safety and sprinkler modifications under separate permitDetails
demolition of interconnecting stair at 8th floor and new floor infill. new structural work. ada restroom upgrades. no mep work fire life/safety and sprinkler modifications under separate permit | $65,000 |
| Feb 7, 2018 | Expired or cancelled expired Sep 2021 | 1 Maritime Pz | new exit access stair connecting the 6th & 7th floors. no change in use, occupancy floor area, or building height. sprinkler and life safety will be submitted under separate permitDetails
new exit access stair connecting the 6th & 7th floors. no change in use, occupancy floor area, or building height. sprinkler and life safety will be submitted under separate permit | $87,500 |
| Jan 22, 2018 | Completed final sign-off May 2019 | 1 Maritime Pz | 6th floor: interior non-structural construction of partitions, ceiling grid and tile, light fixts, millwork, finishes in unoccupied suite 650. demolition of restrooms under app#201801027651. no change in occupancy, use or area. sprinkler, fire alarm and stairs under seperate permit. n/a for maher.Details
6th floor: interior non-structural construction of partitions, ceiling grid and tile, light fixts, millwork, finishes in unoccupied suite 650. demolition of restrooms under app#201801027651. no change in occupancy, use or area. sprinkler, fire alarm and stairs under seperate permit. n/a for maher. | $960,256 |
| Dec 28, 2017 | Completed final sign-off Oct 2018 | 50 Fremont St | stair refresh at (e) communication stairs floors 25 & 26to include selective demo, removal of (e) arch element with handrail. addition of structural support at stair stringer, glass guardrail and handrail. maher naDetails
stair refresh at (e) communication stairs floors 25 & 26to include selective demo, removal of (e) arch element with handrail. addition of structural support at stair stringer, glass guardrail and handrail. maher na | $120,000 |
| Dec 28, 2017 | Completed final sign-off Apr 2019 | 50 Fremont St | stair refresh at (e) communication stairs floors 35, 36, 37 to include removal of (e) arch element. addition of support at stair, stringer, glass guardrail and habdrail, new lighting maher naDetails
stair refresh at (e) communication stairs floors 35, 36, 37 to include removal of (e) arch element. addition of support at stair, stringer, glass guardrail and habdrail, new lighting maher na | $180,000 |
| May 12, 2017 | Expired or cancelled cancelled Jan 2026 | 50 Fremont St | structural communicating stair between 24thh & 23rd floor. ref pa 2017-0510-6220. maher naDetails
structural communicating stair between 24thh & 23rd floor. ref pa 2017-0510-6220. maher na | |
| May 10, 2017 | Completed final sign-off Nov 2017 | 50 Fremont St | full floor ti: partitions communicating stairs & glass guardrails, ceiling, furniture, finishes, light fixtrues, mep & fire safety. selective improvement on 23rd floor new communicating stair. n/a for maher.Details
full floor ti: partitions communicating stairs & glass guardrails, ceiling, furniture, finishes, light fixtrues, mep & fire safety. selective improvement on 23rd floor new communicating stair. n/a for maher. | $2,600,000 |
| Jan 12, 2017 | Completed final sign-off Oct 2017 | 50 Fremont St | 8,9,10th flr: refresh stairs, including demo at stairs of (e) architectural element with hand rails and associated lighting. adding additional support at (e) stairs; adding glass hand railing guardrail and handrails new lighting. maher ord 155-13 naDetails
8,9,10th flr: refresh stairs, including demo at stairs of (e) architectural element with hand rails and associated lighting. adding additional support at (e) stairs; adding glass hand railing guardrail and handrails new lighting. maher ord 155-13 na | $20,000 |
| Jan 12, 2017 | Completed final sign-off Oct 2017 | 50 Fremont St | 5,6,7 flr: refresh stairs, including demo at stairs of (e) architectural element with hand rails and associated lighting. adding additional support at (e) stairs; adding glass hand railing guardrail and handrails new lighting. maher ord 155-13 naDetails
5,6,7 flr: refresh stairs, including demo at stairs of (e) architectural element with hand rails and associated lighting. adding additional support at (e) stairs; adding glass hand railing guardrail and handrails new lighting. maher ord 155-13 na | $20,000 |
| Dec 27, 2016 | Never finaled issued Dec 2016, no final | 555 California St | 28th floor: proposing new product for fire proofing @ new stair constructed under pa # 201603020969. use intumescent paint in lieu of sfrm- n/a maherDetails
28th floor: proposing new product for fire proofing @ new stair constructed under pa # 201603020969. use intumescent paint in lieu of sfrm- n/a maher | |
| Nov 29, 2016 | Completed final sign-off Oct 2017 | 50 Fremont St | revision to 201609289054, minor revision to structural design for convenience stair between 15th and 16th fl. maher not reqDetails
revision to 201609289054, minor revision to structural design for convenience stair between 15th and 16th fl. maher not req | $3,000 |
| Sep 28, 2016 | Completed final sign-off Oct 2017 | 50 Fremont St | flrs: 15 &16: (n)communicating stair; work includes selective demo @ floor opening,stair,glass guardrail and finishes; maher n/aDetails
flrs: 15 &16: (n)communicating stair; work includes selective demo @ floor opening,stair,glass guardrail and finishes; maher n/a | $125,000 |
| Aug 30, 2016 | Completed final sign-off May 2019 | 795 Folsom St | alteration work to the roof level to provide a terrace as an amenity/assembly to the (e) bldg occupants. work includes addition of elevator lobby at roof, raised decking & planting, enclosed exit stair to connect to (e) exit stairs. walls, doors, finishes per plan. *maher: n/a*Details
alteration work to the roof level to provide a terrace as an amenity/assembly to the (e) bldg occupants. work includes addition of elevator lobby at roof, raised decking & planting, enclosed exit stair to connect to (e) exit stairs. walls, doors, finishes per plan. *maher: n/a* | $1,800,000 |
| Aug 8, 2016 | Completed final sign-off May 2017 | 180 Sutter St | ground flr- project consists of demolition of (e) interconnecting staircase between ground & basement, demo of surrounding walls & infilling stair opening, minor demo of select partitions on ground floor. space is correctly unoccupied. plumbing,life safety,sprinkler sys modification under separate pDetails
ground flr- project consists of demolition of (e) interconnecting staircase between ground & basement, demo of surrounding walls & infilling stair opening, minor demo of select partitions on ground floor. space is correctly unoccupied. plumbing,life safety,sprinkler sys modification under separate p | $50,000 |
| Mar 2, 2016 | Completed final sign-off Sep 2017 | 555 California St | partial demo of existing 29/f slab & construction of new communicating stair connecting 28/f & 29/f with new electrical & finishes. ref pa 2015-0526-7112. n/a ordinance #155-13Details
partial demo of existing 29/f slab & construction of new communicating stair connecting 28/f & 29/f with new electrical & finishes. ref pa 2015-0526-7112. n/a ordinance #155-13 | $240,000 |
| Feb 29, 2016 | Completed final sign-off Jan 2017 | 345 California St | structural stair infill previous permit #201602230305Details
structural stair infill previous permit #201602230305 | $40,000 |
| Feb 24, 2016 | Completed final sign-off Jun 2016 | 799 Market St | 5th floor - expansion of accessible restrooms, add drinking fountain. maher na changing door at elevator lobby, in-fill wall near attached to exit stairDetails
5th floor - expansion of accessible restrooms, add drinking fountain. maher na changing door at elevator lobby, in-fill wall near attached to exit stair | $66,000 |
| Feb 23, 2016 | Completed final sign-off Jul 2016 | 345 California St | demo of stair and associated structure guardrail, handrail, draft stop & finishes. infill on separate permit, not occupied floors. deferred structural, electrical, life safety, mechanical, sprinkler and fire alarm. maher na, ab-017.Details
demo of stair and associated structure guardrail, handrail, draft stop & finishes. infill on separate permit, not occupied floors. deferred structural, electrical, life safety, mechanical, sprinkler and fire alarm. maher na, ab-017. | $30,000 |
| Jan 15, 2016 | Expired or cancelled cancelled Jan 2026 | 425 Market St | 26th floor - revision to pa #201512013836: clarify language around fire standpipe, exit stair pressurization & smoke tower. n/a maher ordinanceDetails
26th floor - revision to pa #201512013836: clarify language around fire standpipe, exit stair pressurization & smoke tower. n/a maher ordinance | |
| Oct 7, 2015 | Completed final sign-off Sep 2016 | 4 Embarcadero Center | renovate and extend existing egress access stair between the 17/f & 18/f down to 16/f, removal of two (2) existing egress access stairs, all of which are not part of the required egress system. n/a ordinance #155-13Details
renovate and extend existing egress access stair between the 17/f & 18/f down to 16/f, removal of two (2) existing egress access stairs, all of which are not part of the required egress system. n/a ordinance #155-13 | $52,200 |
| Feb 6, 2015 | Completed final sign-off Nov 2015 | 60 Broadway | interior t.i. office space renovation. removal of (e) stair to be replaced w/new stair as well as (n) ceiling, (n) floor finishes, (n) interior partitions, (n) plumbing fixtures, (n) mech equipment & (n) lighting. n/a maher ordinanceDetails
interior t.i. office space renovation. removal of (e) stair to be replaced w/new stair as well as (n) ceiling, (n) floor finishes, (n) interior partitions, (n) plumbing fixtures, (n) mech equipment & (n) lighting. n/a maher ordinance | $1,540,000 |
| Sep 25, 2014 | Completed final sign-off Jun 2015 | 1 Market St | steuart tower:15th floor: newnon-loaded bearing interior partitions, door frames, new ceiling grid, acoustical tile, recessed light, fixtures and new finishes. 16th floor: infill at former communicating stair location. demo permit # 201409035344. h/a maher ordinance # 155-13Details
steuart tower:15th floor: newnon-loaded bearing interior partitions, door frames, new ceiling grid, acoustical tile, recessed light, fixtures and new finishes. 16th floor: infill at former communicating stair location. demo permit # 201409035344. h/a maher ordinance # 155-13 | $300,000 |
| Sep 17, 2014 | Completed final sign-off Feb 2015 | 760 Market St | 7th flr: new construction of non-load bearing partitions, ceilings, floor & wall finishes, rated stair enclosures and new single & multiple accomodation restrooms; maher n/a.Details
7th flr: new construction of non-load bearing partitions, ceilings, floor & wall finishes, rated stair enclosures and new single & multiple accomodation restrooms; maher n/a. | $600,000 |
| Jul 2, 2014 | Never finaled issued Aug 2014, no final | 120 08th St | interior tenant improvement, 1/f, mezzanine, 2/f - including ada bathroom upgrades, replacement of front egress interior stair and partial 2/f strengthening. n/a ordinance #155-13Details
interior tenant improvement, 1/f, mezzanine, 2/f - including ada bathroom upgrades, replacement of front egress interior stair and partial 2/f strengthening. n/a ordinance #155-13 | $321,000 |
| Apr 15, 2014 | Never finaled issued Apr 2014, no final | 201 03rd St | revision to app#201404012148 to revise stair and stringer on the 10th floor. includes communicating stair between 10th and 11th floors. mep and f/sf = deferred submittal. demo under seperate permit.Details
revision to app#201404012148 to revise stair and stringer on the 10th floor. includes communicating stair between 10th and 11th floors. mep and f/sf = deferred submittal. demo under seperate permit. | |
| Apr 1, 2014 | Never finaled issued Apr 2014, no final | 201 03rd St | suite 1020: demolition of non stuctural partitions, doors, millwork, and opening between 10th and 11th floor for a non-egress stair between them, etc for interior t.i. on 10th floor. mep and life safty defferred submittal. n/a for the interim control #428-13Details
suite 1020: demolition of non stuctural partitions, doors, millwork, and opening between 10th and 11th floor for a non-egress stair between them, etc for interior t.i. on 10th floor. mep and life safty defferred submittal. n/a for the interim control #428-13 | $65,000 |
| Apr 1, 2014 | Never finaled issued Apr 2014, no final | 201 03rd St | suite 1020: construction of interior t.i. on 10th floor. also install opening and non-egress stair between 10th and 11th floor. mep and fire, life safty deffered submittal. demo under app# 201404012147.n/a for the interim control #428-13Details
suite 1020: construction of interior t.i. on 10th floor. also install opening and non-egress stair between 10th and 11th floor. mep and fire, life safty deffered submittal. demo under app# 201404012147.n/a for the interim control #428-13 | $622,000 |
| Dec 12, 2013 | Completed final sign-off May 2014 | 760 Market St | tenant improvement on 10/f to include new construction of non-load bearing partitions, ceiling, floors and wall finishes. rated stair enclosures and new single & multi accommodation restrooms & showers.(compliance with maher ordinance no.155-13 not required)Details
tenant improvement on 10/f to include new construction of non-load bearing partitions, ceiling, floors and wall finishes. rated stair enclosures and new single & multi accommodation restrooms & showers.(compliance with maher ordinance no.155-13 not required) | $600,000 |
| Oct 24, 2013 | Completed final sign-off Jul 2015 | 474 Castro St | renovation of existing build to demo interior finishes & non-structural partition. demolition of existing stairway & store front. full seismic upgrade. new partition, staircase, restoring store front. mep & fire protection on separate permit.Details
renovation of existing build to demo interior finishes & non-structural partition. demolition of existing stairway & store front. full seismic upgrade. new partition, staircase, restoring store front. mep & fire protection on separate permit. | $3,950,032 |
| Oct 22, 2013 | Completed final sign-off Apr 2014 | 135 Mississippi St | revision to pa#2013-0328-3290. installation of metal stairs.Details
revision to pa#2013-0328-3290. installation of metal stairs. | $50,000 |
| Oct 2, 2013 | Completed final sign-off Dec 2013 | 760 Market St | upgrade restrooms and build out stair enclosure and elevator lobby. space to remain vacant per ab017. ada under separate permitDetails
upgrade restrooms and build out stair enclosure and elevator lobby. space to remain vacant per ab017. ada under separate permit | $100,000 |
| Sep 3, 2013 | Never finaled issued Oct 2013, no final | 1 Bush St | structural work to remove slab between 9th and 10th fl. install inter connecting stairs to servie tenant space. ref 201308013346 and 201308013349 for ti workDetails
structural work to remove slab between 9th and 10th fl. install inter connecting stairs to servie tenant space. ref 201308013346 and 201308013349 for ti work | $120,000 |
| Aug 1, 2013 | Completed final sign-off Dec 2013 | 1 Bush St | 9th floor-full floor t.i-build new non structural partitions, doors, millwork with m.e.p to relocate & install equipment & fixtures. sprinklers, life safety & a structural stair will be submitted under seperate permitDetails
9th floor-full floor t.i-build new non structural partitions, doors, millwork with m.e.p to relocate & install equipment & fixtures. sprinklers, life safety & a structural stair will be submitted under seperate permit | $1,374,300 |
| Aug 1, 2013 | Completed final sign-off Dec 2013 | 1 Bush St | 10th floor-full floor t.i-build new non structural partitions, doors, millwork with m.e.p to relocate & install equipment & fixtures. sprinklers, life safety, card readers & a structural stair will be submitted under seperate permit.Details
10th floor-full floor t.i-build new non structural partitions, doors, millwork with m.e.p to relocate & install equipment & fixtures. sprinklers, life safety, card readers & a structural stair will be submitted under seperate permit. | $1,374,300 |
| Jul 12, 2013 | Completed final sign-off Jun 2014 | 345 California St | mechanical, electrical for inter-connecting staircase on 26th floor to relocate and install new equipment. please refer to app#201305207316 for referance.Details
mechanical, electrical for inter-connecting staircase on 26th floor to relocate and install new equipment. please refer to app#201305207316 for referance. | $45,000 |
| May 20, 2013 | Completed final sign-off Jun 2014 | 345 California St | 26th floor-build new interconnecting stairs between 25th & 26th floors. re-configure adjacent 26th floor ceiling, lighting as required. provide new casework. mechanical, electrical, plumbing, life safety, fire sprinklers under seperate permitDetails
26th floor-build new interconnecting stairs between 25th & 26th floors. re-configure adjacent 26th floor ceiling, lighting as required. provide new casework. mechanical, electrical, plumbing, life safety, fire sprinklers under seperate permit | $450,000 |
| May 3, 2013 | Completed final sign-off Nov 2013 | 345 California St | 25th floor-complete build-out with new non structural partitions, doors, glazing, ceiling, lighting & casework. internal stairs. life safety, fire sprinklers under seperate permitsDetails
25th floor-complete build-out with new non structural partitions, doors, glazing, ceiling, lighting & casework. internal stairs. life safety, fire sprinklers under seperate permits | $1,585,950 |
| Mar 28, 2013 | Completed final sign-off Mar 2014 | 135 Mississippi St | replace 3 exisitng non-forming stairs with 2 new required compliant egress stairs.Details
replace 3 exisitng non-forming stairs with 2 new required compliant egress stairs. | $625,000 |
| Oct 4, 2012 | Never finaled issued Oct 2012, no final | 4 Embarcadero Center | 22nd floor:structural work to secure high density shelving on 22nd floor. please to refer to ti work under app#201204309419 and calcs for stair guard railDetails
22nd floor:structural work to secure high density shelving on 22nd floor. please to refer to ti work under app#201204309419 and calcs for stair guard rail | $15,000 |
| Aug 17, 2012 | Completed final sign-off Mar 2014 | 717 Market St | remodel 1st fl & 2nd fl, restroom, office rooms. add (n) exit stair on stevenson st & replace (e) stair. (n) catwalk that connects elevator lobby to south area of 2nd fl. all (n) lighting, mechanical electric + plumbing. sprinkler & fire alarm & sprinkler on separate permit. panic hardware req'd.Details
remodel 1st fl & 2nd fl, restroom, office rooms. add (n) exit stair on stevenson st & replace (e) stair. (n) catwalk that connects elevator lobby to south area of 2nd fl. all (n) lighting, mechanical electric + plumbing. sprinkler & fire alarm & sprinkler on separate permit. panic hardware req'd. | $136,000 |
| Aug 11, 2011 | Never finaled issued Aug 2011, no final | 1 Kearny St | reconfigureation /modification of an existing stair #3 0n the 11th floor leading to the 12th fl which is a single family dwelling. add structural framing to the 11th fl. create opening in non-rated parapet on the 11th floor. remove drinking fountain in a-2 occupancy.Details
reconfigureation /modification of an existing stair #3 0n the 11th floor leading to the 12th fl which is a single family dwelling. add structural framing to the 11th fl. create opening in non-rated parapet on the 11th floor. remove drinking fountain in a-2 occupancy. | $50,000 |
| May 3, 2011 | Completed final sign-off May 2012 | 1 Montgomery St | construct conference rooms, open office environment, training room, copy rooms, break room, communication stair, new finishes throughout.Details
construct conference rooms, open office environment, training room, copy rooms, break room, communication stair, new finishes throughout. | $1,300,000 |
| Mar 31, 2011 | Expired or cancelled expired Jun 2014 | 1 Market St | demoltion of non-egress stair and enclosure in tenant space. new ceiling tile/grid infill, slab finish in area of demolition fire and life safety permits under separate permit. no title 24 mech/el work & equipment will be salvage or replaced.Details
demoltion of non-egress stair and enclosure in tenant space. new ceiling tile/grid infill, slab finish in area of demolition fire and life safety permits under separate permit. no title 24 mech/el work & equipment will be salvage or replaced. | $75,000 |
| Nov 5, 2010 | Never finaled issued Nov 2010, no final | 760 Market St | the phelan building. structural stair on 2nd and 3rd floors. interior work only. pa# 2010.08.27.9713 for referenceDetails
the phelan building. structural stair on 2nd and 3rd floors. interior work only. pa# 2010.08.27.9713 for reference | $25,000 |
| Jul 20, 2010 | Never finaled issued Jul 2010, no final | 1 Kearny St | demolition of steel stair (non-egress) and infill of opening with slab. space will remain unoccupied under ab-017.Details
demolition of steel stair (non-egress) and infill of opening with slab. space will remain unoccupied under ab-017. | $10,000 |
| May 4, 2010 | Completed final sign-off Sep 2010 | 101 California St | demo communicating non-emergency stair and fill-in with new slab to separate floors for future t.i. on 16th. flr.Details
demo communicating non-emergency stair and fill-in with new slab to separate floors for future t.i. on 16th. flr. | $30,000 |
| Jan 14, 2010 | Completed final sign-off Mar 2011 | 1 Market St | 41st & 42nd floor - demolition of non-egress stair & enclosure to replace with slab infill & ceiling tile/grid, electrical, mechanical, sprinklers & alarms under separate permit.Details
41st & 42nd floor - demolition of non-egress stair & enclosure to replace with slab infill & ceiling tile/grid, electrical, mechanical, sprinklers & alarms under separate permit. | $60,000 |
| Jun 5, 2009 | Completed final sign-off Oct 2009 | 575 Market St | between levels 39th & 40th floor - demolish an existing inter-floor stair, infill 40th floor opeings with new structural deck. floors are currently un-occupied with all interior construction previously removed. remain unoccupaied until future tenant improvements are permitted.Details
between levels 39th & 40th floor - demolish an existing inter-floor stair, infill 40th floor opeings with new structural deck. floors are currently un-occupied with all interior construction previously removed. remain unoccupaied until future tenant improvements are permitted. | $75,000 |
| Sep 3, 2008 | Completed final sign-off Sep 2009 | 345 California St | commercial tenant improvement which includes the following:non structural partition and ceiling, mechanical election, fiishes and millwork cutting 19th floor slab for insertion of communication stair to floor 18.Details
commercial tenant improvement which includes the following:non structural partition and ceiling, mechanical election, fiishes and millwork cutting 19th floor slab for insertion of communication stair to floor 18. | $162,000 |
| Aug 26, 2008 | Completed final sign-off Feb 2009 | 301 Brannan St | remove convenience stair and slab infill for existing cut out to fill open space between 3rd and 4th floors. refer to 20080808720 for all arch, path of travel, and disabled access.Details
remove convenience stair and slab infill for existing cut out to fill open space between 3rd and 4th floors. refer to 20080808720 for all arch, path of travel, and disabled access. | $12,000 |
| May 6, 2008 | Completed final sign-off Feb 2009 | 345 California St | construct new stair to connect 34th and 35th floors, construct new office on the 34th floor and related mep in work area on the 34th floor and stair well connecting 34th and 35th floor. sprinkler work will be under separate permit.Details
construct new stair to connect 34th and 35th floors, construct new office on the 34th floor and related mep in work area on the 34th floor and stair well connecting 34th and 35th floor. sprinkler work will be under separate permit. | $150,000 |