Block 1065, lot 035
150 Parker Ave
- City’s use
- Commercial Misc
- Built
- 1900
- Stories
- 2
- Units
- 2
- Rooms
- 1 bathroom
- Building
- 2,736 sq ft
- Lot
- 5,296 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
15 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 25, 2025 | Completed final sign-off Sep 2025 | 150 Parker Av | Gci, Inc | (e) art room to (n) classrooom conversion. add pocket door, reconstruct (e) stair, new exterior awning, new low to ground plane deck & ramp, add 1 sink.Details
(e) art room to (n) classrooom conversion. add pocket door, reconstruct (e) stair, new exterior awning, new low to ground plane deck & ramp, add 1 sink. | $25,000 |
| Jan 19, 2023 | Expired or cancelled withdrawn Jul 2025 | 150 Parker Av | Gci, Inc | accessible building entry path of travel and access upgrade to comply with accessible business entrance program ord 51-16. reconstructing concrete at entrance path. ref abe 201906065853Details
accessible building entry path of travel and access upgrade to comply with accessible business entrance program ord 51-16. reconstructing concrete at entrance path. ref abe 201906065853 | $10,000 |
| Jun 14, 2019 | Expired or cancelled expired Oct 2019 | 150 Parker Av | Beyond Basics Construction | barrier removal only for an existing bathroom that does consist of child water closet and adult water closet per 2016 iib202,4 exception 4Details
barrier removal only for an existing bathroom that does consist of child water closet and adult water closet per 2016 iib202,4 exception 4 | $40,000 |
| Jul 25, 2016 | Completed final sign-off Aug 2016 | 150 Parker Av | Zion Engineering | widen doorway and install pocket door - interiorDetails
widen doorway and install pocket door - interior | $28,000 |
| Jul 29, 2015 | Completed final sign-off Oct 2015 | 150 Parker Av | Golden State Windows Inc | replace 5 existing double hung simulated divided light windows with aluminium wood clad double hung windows with simulated divided lights. replace rear slider with vinyl double pane slider window in kind. all windows to be installed as retrofit.Details
replace 5 existing double hung simulated divided light windows with aluminium wood clad double hung windows with simulated divided lights. replace rear slider with vinyl double pane slider window in kind. all windows to be installed as retrofit. | $10,603 |
| Jun 27, 2014 | Completed final sign-off Sep 2014 | 150 Parker Av | Boaz Mor Design & Construction | replace side property/main gate, per plans.Details
replace side property/main gate, per plans. | $3,000 |
| Sep 25, 2013 | Completed final sign-off Jan 2014 | 150 Parker Av | First Alarm | install a automatic fire alarm system within a day care center.Details
install a automatic fire alarm system within a day care center. | $4,000 |
| Jul 27, 2010 | Completed final sign-off Sep 2010 | 150 Parker Av | Cepheus Builders Inc | replace 30 ft of brick footings at north east corner of rear building and repair dryrotted framing and paint 3 sides of buildingDetails
replace 30 ft of brick footings at north east corner of rear building and repair dryrotted framing and paint 3 sides of building | $34,000 |
| Jul 13, 2004 | Completed final sign-off Sep 2004 | 150 Parker Av | remove glue up acoustil ceiling tiles thru-out rear bldg, replace sheet rock base acoustil ceiling tDetails
remove glue up acoustil ceiling tiles thru-out rear bldg, replace sheet rock base acoustil ceiling t | $5,000 | |
| Apr 28, 2004 | Completed final sign-off Apr 2004 | 150 Parker Av | renew pa#200306207347 & 200308202569 for final insp.Details
renew pa#200306207347 & 200308202569 for final insp. | ||
| Apr 13, 2004 | Completed final sign-off May 2004 | 150 Parker Av | Excellent Technical Roofing Co, Inc. | reroofingDetails
reroofing | $6,900 |
| Aug 20, 2003 | Expired or cancelled expired Apr 2004 | 150 Parker Av | revision to pa 200305235380-rev to not provide level entry & ramps at bldng entry, but to upgrade exDetails
revision to pa 200305235380-rev to not provide level entry & ramps at bldng entry, but to upgrade ex | ||
| Jun 20, 2003 | Never finaled issued Jun 2003, no final | 150 Parker Av | rev appl#200305235380 for bigger conc. foundation, no change to occupancy nor unit count. all interiDetails
rev appl#200305235380 for bigger conc. foundation, no change to occupancy nor unit count. all interi | ||
| May 23, 2003 | Completed final sign-off Apr 2004 | 150 Parker Av | remodel kitchen at street level &staff room at bottom level.install bay windows,conc slab&foundationDetails
remodel kitchen at street level &staff room at bottom level.install bay windows,conc slab&foundation | $35,000 | |
| Feb 27, 2002 | Completed final sign-off May 2002 | 150 Parker Av | Excelsior Roofing Company | reroofingDetails
reroofing | $9,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.