First Alarm
- Based in
- Aptos
- On San Francisco permits
- Sep 2004 to Feb 2026
- Last 24 months
- 2 permits filed
17 permits since 2000: 11 completed, 1 in progress, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 12, 2026 | In progress issued Mar 2026 | 151 10th St | change the communication path of the fire alarm from telephone lines to a 5g communicatorDetails
change the communication path of the fire alarm from telephone lines to a 5g communicator | $6,500 |
| Jul 7, 2025 | Completed final sign-off Jul 2025 | 2 Cervantes Bl | fire alarm sound pressure level testDetails
fire alarm sound pressure level test | |
| Mar 30, 2022 | Completed final sign-off Apr 2023 | 3437 Clay St | first alarm will install complete fire alarm system, the system will communicate using a cellular communicator to the monitoring system facu, pull station, heat and smoke detectors, strobes & horn strobesDetails
first alarm will install complete fire alarm system, the system will communicate using a cellular communicator to the monitoring system facu, pull station, heat and smoke detectors, strobes & horn strobes | $11,000 |
| Dec 9, 2020 | Completed final sign-off Mar 2021 | 2670 Chestnut St | fire alarm system to monitor fully sprinkler home connect to 1 water flow valve switch and tamper valve switch install 1-fire control panel, 1 smoke detector, 1 manual pull station, 1 cellular communicator, 1 indoor horn strobe, 1 outdoor horn strobe, and 2 monitor modules.Details
fire alarm system to monitor fully sprinkler home connect to 1 water flow valve switch and tamper valve switch install 1-fire control panel, 1 smoke detector, 1 manual pull station, 1 cellular communicator, 1 indoor horn strobe, 1 outdoor horn strobe, and 2 monitor modules. | $4,000 |
| Jan 14, 2019 | Completed final sign-off Feb 2019 | 1369 Filbert St | adding 14 low frequency sounder per retrofit. ref app#201813123411Details
adding 14 low frequency sounder per retrofit. ref app#201813123411 | $5,800 |
| Oct 5, 2017 | Never finaled issued Oct 2017, no final | 2007 Franklin St | as builts to pa#201704275040 add 1 manual pull station and verbage in note line 34. n/a ordinance #155-13 ref 201012217130.Details
as builts to pa#201704275040 add 1 manual pull station and verbage in note line 34. n/a ordinance #155-13 ref 201012217130. | |
| Apr 27, 2017 | Never finaled issued Apr 2017, no final | 2007 Franklin St | fire alarm t.i. to original pa#9201816, to add (1) 10 zone expander, (1) power supply, (12) smoke detectors, (7) strobes, (10) horn strobes & (1) water flow switch. n/a ordinance #155-13Details
fire alarm t.i. to original pa#9201816, to add (1) 10 zone expander, (1) power supply, (12) smoke detectors, (7) strobes, (10) horn strobes & (1) water flow switch. n/a ordinance #155-13 | $9,000 |
| Nov 14, 2016 | Completed final sign-off Apr 2017 | 135 Mendosa Av | installing sprinkler monitored system for 3 story home consisting of 1 facp, 1 cellular communicator 1 mps 1 out door horn strobe,1 smoke,connect to 1 waterflow switch & 2 tamper valve switches.Details
installing sprinkler monitored system for 3 story home consisting of 1 facp, 1 cellular communicator 1 mps 1 out door horn strobe,1 smoke,connect to 1 waterflow switch & 2 tamper valve switches. | $3,100 |
| Jun 10, 2016 | Completed final sign-off Dec 2017 | 493 Broadway | revision to pa #201508113907 - add 3 additional horn strobes due to tenant improvement.Details
revision to pa #201508113907 - add 3 additional horn strobes due to tenant improvement. | $500 |
| Aug 11, 2015 | Completed final sign-off Jul 2016 | 493 Broadway | revision to 201307151858. sprinkler monitored system consisting of fire control panel, annunciator. 1 manual pull station, 1 horn strob, 1 smoke detector, 25 duct detectors, 1 honeywell ismg4 radio for primary and secondary phone line connectDetails
revision to 201307151858. sprinkler monitored system consisting of fire control panel, annunciator. 1 manual pull station, 1 horn strob, 1 smoke detector, 25 duct detectors, 1 honeywell ismg4 radio for primary and secondary phone line connect | $6,900 |
| Jan 9, 2014 | Never finaled issued Sep 2014, no final | 1151 Mission St | current building has no fire/life safety system. this system will cover the entire building, this building has 2 physical addresses, but it is the same building. compliance w/ ordinance no. 155-13 not required. excavation<50 cu.yd.Details
current building has no fire/life safety system. this system will cover the entire building, this building has 2 physical addresses, but it is the same building. compliance w/ ordinance no. 155-13 not required. excavation<50 cu.yd. | $23,000 |
| Sep 25, 2013 | Completed final sign-off Jan 2014 | 150 Parker Av | install a automatic fire alarm system within a day care center.Details
install a automatic fire alarm system within a day care center. | $4,000 |
| Jul 15, 2013 | Never finaled issued Jul 2013, no final | 493 Broadway | installation of a sprinkler fire alarm monitoring system. space vacant this is for shell/core bldg.Details
installation of a sprinkler fire alarm monitoring system. space vacant this is for shell/core bldg. | $6,882 |
| Aug 17, 2012 | Completed final sign-off May 2013 | 1401 16th St | replace sprinkler monitoring fire control panel monitor modules. wiring, smoke detector, pull station, horn strobe, add, an annunicator at the front entry.Details
replace sprinkler monitoring fire control panel monitor modules. wiring, smoke detector, pull station, horn strobe, add, an annunicator at the front entry. | $3,800 |
| May 24, 2011 | Expired or cancelled withdrawn Dec 2011 | 2801 Leavenworth St | fire alarm upgrade in all occupancy areas. sprinkler monitoring and fire alarm throughout.Details
fire alarm upgrade in all occupancy areas. sprinkler monitoring and fire alarm throughout. | $234,000 |
| Sep 28, 2009 | Completed final sign-off Nov 2009 | 2801 Leavenworth St | 1st floor-fire alarm addition to (e) tenant space-dirty martini (bar/lounge)-install 1 remote power supply, 1 ceiling horn/strobe, 2 manual fire alarm pull stations, slc module, 2 ceiling horn/strobes, 1 ceiling strobe, 3 wall horn/strobes & 8 heat detectors and 1 smoke detectorDetails
1st floor-fire alarm addition to (e) tenant space-dirty martini (bar/lounge)-install 1 remote power supply, 1 ceiling horn/strobe, 2 manual fire alarm pull stations, slc module, 2 ceiling horn/strobes, 1 ceiling strobe, 3 wall horn/strobes & 8 heat detectors and 1 smoke detector | $5,900 |
| Sep 7, 2004 | Completed final sign-off Oct 2004 | 711 Market St | installation of u l fire alarm system.Details
installation of u l fire alarm system. | $5,560 |