Block 0163, lot 022
485 Broadway
- City’s use
- Commercial Retail
- Built
- 1907
- Stories
- 2
- Units
- 3
- Rooms
- 6 bathrooms
- Building
- 5,834 sq ft
- Lot
- 3,162 sq ft
- Zoning
- BDWY
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
32 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 29, 2025 | Completed final sign-off Sep 2025 | 493 Broadway | Modl Construction | revision to pa # 2025-0423-5082: installing 3" vent into 4" vent into 6" exit (ducts)Details
revision to pa # 2025-0423-5082: installing 3" vent into 4" vent into 6" exit (ducts) | |
| Apr 23, 2025 | Completed final sign-off Sep 2025 | 493 Broadway | Modl Construction | add mechanical vents to kiln system,locate 1st floor in the back left kiln room. 4 inch vent in lightwell, not visible from street. 3ft away from property lineDetails
add mechanical vents to kiln system,locate 1st floor in the back left kiln room. 4 inch vent in lightwell, not visible from street. 3ft away from property line | $2,000 |
| Apr 10, 2024 | Completed final sign-off Apr 2024 | 493 Broadway | to obtain final inspection for work approved under pa 201306068874 and 201306038442. all work is complete.Details
to obtain final inspection for work approved under pa 201306068874 and 201306038442. all work is complete. | ||
| Oct 15, 2019 | Never finaled issued Oct 2019, no final | 493 Broadway | Diego Brothers Inc. | commencement of work not started under previously approved permit #201301107687--(interior t.i to (e) space, renovations include new kitchen & bar @ 1/f)Details
commencement of work not started under previously approved permit #201301107687--(interior t.i to (e) space, renovations include new kitchen & bar @ 1/f) | $100,000 |
| Jun 10, 2016 | Completed final sign-off Dec 2017 | 493 Broadway | First Alarm | revision to pa #201508113907 - add 3 additional horn strobes due to tenant improvement.Details
revision to pa #201508113907 - add 3 additional horn strobes due to tenant improvement. | $500 |
| May 6, 2016 | Never finaled issued May 2016, no final | 493 Broadway | street space | ||
| Apr 19, 2016 | Completed final sign-off Jul 2016 | 493 Broadway | Kaufman Construction | minor revision to pa #201212176374: addition of two walls & door on 2nd floor to enclose conference room. m.e.p. & fire sprinklers/alarms under separate permit.Details
minor revision to pa #201212176374: addition of two walls & door on 2nd floor to enclose conference room. m.e.p. & fire sprinklers/alarms under separate permit. | $8,600 |
| Mar 14, 2016 | Never finaled issued Mar 2016, no final | 493 Broadway | street space | ||
| Nov 13, 2015 | Completed final sign-off Dec 2017 | 493 Broadway | Kaufman Construction | revise da checklist to use power door operatro in lieu of level landing for permit 2012-1217-6374Details
revise da checklist to use power door operatro in lieu of level landing for permit 2012-1217-6374 | |
| Sep 29, 2015 | Never finaled issued Sep 2015, no final | 493 Broadway | street space permit | ||
| Aug 11, 2015 | Completed final sign-off Jul 2016 | 493 Broadway | First Alarm | revision to 201307151858. sprinkler monitored system consisting of fire control panel, annunciator. 1 manual pull station, 1 horn strob, 1 smoke detector, 25 duct detectors, 1 honeywell ismg4 radio for primary and secondary phone line connectDetails
revision to 201307151858. sprinkler monitored system consisting of fire control panel, annunciator. 1 manual pull station, 1 horn strob, 1 smoke detector, 25 duct detectors, 1 honeywell ismg4 radio for primary and secondary phone line connect | $6,900 |
| Jun 26, 2015 | Never finaled issued Jun 2015, no final | 493 Broadway | Thorpe Design Inc | renewal of pa 201304164706. (thorpe design to install underground fire service & overhead fire sprinkler system)Details
renewal of pa 201304164706. (thorpe design to install underground fire service & overhead fire sprinkler system) | $22,000 |
| May 14, 2015 | Never finaled issued May 2015, no final | 493 Broadway | street space & mta permit | ||
| Mar 13, 2015 | Never finaled issued Mar 2015, no final | 493 Broadway | street space & mta parking meter | ||
| Sep 3, 2014 | Never finaled issued Sep 2014, no final | 493 Broadway | street space | ||
| Sep 13, 2013 | Never finaled issued Sep 2013, no final | 493 Broadway | street space, sidewalk and mta permits (pa #201304164706)Details
street space, sidewalk and mta permits (pa #201304164706) | ||
| Aug 27, 2013 | Never finaled issued Aug 2013, no final | 493 Broadway | street space | ||
| Jul 19, 2013 | Never finaled issued Jul 2013, no final | 493 Broadway | street space permit | ||
| Jul 15, 2013 | Never finaled issued Jul 2013, no final | 493 Broadway | First Alarm | installation of a sprinkler fire alarm monitoring system. space vacant this is for shell/core bldg.Details
installation of a sprinkler fire alarm monitoring system. space vacant this is for shell/core bldg. | $6,882 |
| Jun 6, 2013 | Expired or cancelled expired Apr 2024 | 493 Broadway | Kaufman Construction | revision to pa# 201212176389 and pa #201305146869. structural moment frame installation.Details
revision to pa# 201212176389 and pa #201305146869. structural moment frame installation. | $55,000 |
| Jun 3, 2013 | Expired or cancelled expired Apr 2024 | 493 Broadway | Tuck Aire Htg &Air Cond. Corpdba Atlas H | (2) roof packaged units and roof top ductwork, t.i pa# 201301107687Details
(2) roof packaged units and roof top ductwork, t.i pa# 201301107687 | $70,000 |
| May 14, 2013 | Completed final sign-off Dec 2017 | 493 Broadway | Kaufman Construction | revision to pa 201212176389, core and shell permit work to include reframing of floor assembly on the basement, 1st and 2nd level.Details
revision to pa 201212176389, core and shell permit work to include reframing of floor assembly on the basement, 1st and 2nd level. | $65,000 |
| Apr 16, 2013 | Completed final sign-off Dec 2017 | 493 Broadway | Thorpe Design Inc | install underground fire service & overhead fire sprinkler system (101) sprinklers. sprinkler monitoring separte permitDetails
install underground fire service & overhead fire sprinkler system (101) sprinklers. sprinkler monitoring separte permit | $22,000 |
| Mar 6, 2013 | Never finaled issued Mar 2013, no final | 493 Broadway | street space permit | ||
| Jan 10, 2013 | Expired or cancelled cancelled Apr 2024 | 493 Broadway | Kaufman Construction | interior tenant improvement to 9e) space, renovation includes new kitchen & bar at 1st floor & new cooking equipment at the basement (kitchen). m.e.p & life safety under seperate permitDetails
interior tenant improvement to 9e) space, renovation includes new kitchen & bar at 1st floor & new cooking equipment at the basement (kitchen). m.e.p & life safety under seperate permit | $280,000 |
| Dec 17, 2012 | Completed final sign-off Jul 2016 | 493 Broadway | Kaufman Construction | core and shell renovation of extg 2 story building with basement.includes seismic upgrade and restrooms. mep and sprinkler under seperate permit.Details
core and shell renovation of extg 2 story building with basement.includes seismic upgrade and restrooms. mep and sprinkler under seperate permit. | $136,060 |
| Dec 17, 2012 | Completed final sign-off Jul 2016 | 493 Broadway | Kaufman Construction | facade renovation of an (e) 2-story bldg. renovation includes replacing all (e) exterior windows in (e) opening at 2nd fl, (n) window & door on 1st fl, & general facade. no change of use proposed.Details
facade renovation of an (e) 2-story bldg. renovation includes replacing all (e) exterior windows in (e) opening at 2nd fl, (n) window & door on 1st fl, & general facade. no change of use proposed. | $87,231 |
| Nov 30, 2009 | Completed final sign-off Dec 2009 | 483 Broadway | T M Loyola Company | to obtain final inspection for work approved under app #200307280563. all work is completeDetails
to obtain final inspection for work approved under app #200307280563. all work is complete | |
| Oct 23, 2009 | Expired or cancelled withdrawn Mar 2010 | 483 Broadway | Associated Trucking Inc | replace existing name. (projecting single faced).Details
replace existing name. (projecting single faced). | $250 |
| Oct 23, 2009 | Expired or cancelled withdrawn Mar 2010 | 483 Broadway | Associated Trucking Inc | relocate existing name. (projecting double faced).Details
relocate existing name. (projecting double faced). | $500 |
| Oct 11, 2006 | Never finaled issued Oct 2006, no final | 493 Broadway | street space permit | ||
| Jul 28, 2003 | Expired or cancelled expired Dec 2009 | 483 Broadway | umb seismic upgrade bolts-plus, assist open on main level retail door, install ramp to (e) bathroomDetails
umb seismic upgrade bolts-plus, assist open on main level retail door, install ramp to (e) bathroom | $62,400 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Kaufman Construction (7), First Alarm (3), Associated Trucking Inc (2), Modl Construction (2), Thorpe Design Inc (2), Diego Brothers Inc., T M Loyola Company, Tuck Aire Htg &Air Cond. Corpdba Atlas H
- Architects
- Frederic Starkweather (2), William Bondy
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.