Modl Construction
- Based in
- Emeryville
- On San Francisco permits
- Feb 2025 to Oct 2026
- Last 24 months
- 5 permits filed
5 permits since 2000: 3 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 1, 2026 | In progress issued Oct 2026 | 55 Balceta Av | remove bathtub & plumbing connections, remove bathroom finishes, fixtures accessaries & trims. demo wall, install new shower compartment, shower pan, shower plumbing, valve, shower head & drain. replace water closet, vanity. new electrical-receptacles, lights,switches, and exhaust fan. switchesDetails
remove bathtub & plumbing connections, remove bathroom finishes, fixtures accessaries & trims. demo wall, install new shower compartment, shower pan, shower plumbing, valve, shower head & drain. replace water closet, vanity. new electrical-receptacles, lights,switches, and exhaust fan. switches | $20,000 |
| Jan 30, 2026 | In progress issued Apr 2026 | 135 04th St | #3000 int'r modifications to an existing auditorium, amc screen x projection technology, including installation of side-wall projection equipment; modifications to the existing screen and new interior finishes. entry upgrades include updated finishes and a new entry way illuminated sign. life safetyDetails
#3000 int'r modifications to an existing auditorium, amc screen x projection technology, including installation of side-wall projection equipment; modifications to the existing screen and new interior finishes. entry upgrades include updated finishes and a new entry way illuminated sign. life safety | $330,000 |
| Aug 29, 2025 | Completed final sign-off Sep 2025 | 493 Broadway | revision to pa # 2025-0423-5082: installing 3" vent into 4" vent into 6" exit (ducts)Details
revision to pa # 2025-0423-5082: installing 3" vent into 4" vent into 6" exit (ducts) | |
| Apr 23, 2025 | Completed final sign-off Sep 2025 | 493 Broadway | add mechanical vents to kiln system,locate 1st floor in the back left kiln room. 4 inch vent in lightwell, not visible from street. 3ft away from property lineDetails
add mechanical vents to kiln system,locate 1st floor in the back left kiln room. 4 inch vent in lightwell, not visible from street. 3ft away from property line | $2,000 |
| Feb 11, 2025 | Completed final sign-off Sep 2025 | 1934 Jefferson St | (n) 1 hour rated fire protection wall at roof to a 3 story two unit building to comply with nov 202304057 and planning code 2023011348enf and legalize roof deck and stair layout. remove flueDetails
(n) 1 hour rated fire protection wall at roof to a 3 story two unit building to comply with nov 202304057 and planning code 2023011348enf and legalize roof deck and stair layout. remove flue | $10,000 |