Block 3723, lot 113
783 Mission St
- City’s use
- Commercial Retail
- Zoning
- C3S
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
37 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 22, 2026 | In progress issued Nov 2026 | 135 04th St | My Build Core Llc | revision 202601304911 to modifiy equipment locations, interior entry signage, added dimmer switches for lighting.Details
revision 202601304911 to modifiy equipment locations, interior entry signage, added dimmer switches for lighting. | |
| Jan 30, 2026 | In progress issued Apr 2026 | 135 04th St | Modl Construction | #3000 int'r modifications to an existing auditorium, amc screen x projection technology, including installation of side-wall projection equipment; modifications to the existing screen and new interior finishes. entry upgrades include updated finishes and a new entry way illuminated sign. life safetyDetails
#3000 int'r modifications to an existing auditorium, amc screen x projection technology, including installation of side-wall projection equipment; modifications to the existing screen and new interior finishes. entry upgrades include updated finishes and a new entry way illuminated sign. life safety | $330,000 |
| Nov 19, 2025 | Completed final sign-off Feb 2026 | 135 04th St | Metropolitan Electrical Construction | verizon: removing - 2 (e) antennas, 2 (e) radio 4449 units, 2 (e) radio 8863 units, 2 (e) filters, all (e) rrus-32 units, all (e) rrus-11 units. retaining - 4 (e) antennas, 1 (e) radio 8863, 1 (e) filter, all (e) jma wireless combiners, 6 (e) rack mounted raycab 2260Details
verizon: removing - 2 (e) antennas, 2 (e) radio 4449 units, 2 (e) radio 8863 units, 2 (e) filters, all (e) rrus-32 units, all (e) rrus-11 units. retaining - 4 (e) antennas, 1 (e) radio 8863, 1 (e) filter, all (e) jma wireless combiners, 6 (e) rack mounted raycab 2260 | $84,500 |
| Aug 12, 2025 | In progress issued Aug 2025 | 135 04th St | Ares Holdings Llc | remove and replace 2 like for like condensing unitsDetails
remove and replace 2 like for like condensing units | $90,000 |
| Jul 24, 2024 | In progress issued Jul 2024 | 155 04th St | Modelo Design Build Co. | ste#165: soft interior demolition. ab-017Details
ste#165: soft interior demolition. ab-017 | $3,000 |
| Oct 27, 2023 | Completed final sign-off Sep 2024 | 135 04th St | Johnson Controls Fire | for 4th flr. provide and install (3) monitor modules for the monitoring of statue for the exisitn pre-action system.Details
for 4th flr. provide and install (3) monitor modules for the monitoring of statue for the exisitn pre-action system. | $2,000 |
| Oct 24, 2023 | Completed final sign-off Mar 2024 | 155 04th St | install new kitchen equipment in existing kitchen. exist hvac/type 1 exhause system to remainDetails
install new kitchen equipment in existing kitchen. exist hvac/type 1 exhause system to remain | $2,000 | |
| Dec 13, 2022 | Expired or cancelled cancelled Jan 2026 | 135 04th St | Insign Electric | install (1) illuminated single faced wall sign: (sign b) "dolby" 4'-6" x 13'Details
install (1) illuminated single faced wall sign: (sign b) "dolby" 4'-6" x 13' | $9,000 |
| Dec 13, 2022 | Expired or cancelled cancelled Jan 2026 | 135 04th St | Insign Electric | install (1) illuminated single faced wall sign: (sign d) "amc 'dolby cinema' imax" 2'-4" x 5'-11"Details
install (1) illuminated single faced wall sign: (sign d) "amc 'dolby cinema' imax" 2'-4" x 5'-11" | $5,000 |
| Dec 13, 2022 | Expired or cancelled cancelled Jan 2026 | 135 04th St | Insign Electric | install (2) illuminated single faced wall signs: (sign c1 and c2 ) "dolby" 2'-9" x 7'-11"Details
install (2) illuminated single faced wall signs: (sign c1 and c2 ) "dolby" 2'-9" x 7'-11" | $10,000 |
| Jan 30, 2019 | Completed final sign-off Jun 2019 | 135 04th St | J S Modern Construction Inc | #4534: t.i. demolish (e) cashier counter and install (n) cashier counter, install modify electrical (power) lines (no lighting) install (n) kitchen equipmentDetails
#4534: t.i. demolish (e) cashier counter and install (n) cashier counter, install modify electrical (power) lines (no lighting) install (n) kitchen equipment | $15,000 |
| Aug 3, 2018 | Never finaled issued Sep 2018, no final | 763 Mission St | Security Vault Works Inc. | replace arm & door (bofa) (existing)Details
replace arm & door (bofa) (existing) | $10,000 |
| Mar 20, 2018 | Never finaled issued Mar 2018, no final | 763 Mission St | temporary installation of display wall in extg gallery. wall in place for 90 days and then will be removed.Details
temporary installation of display wall in extg gallery. wall in place for 90 days and then will be removed. | $5,000 | |
| Jan 18, 2017 | Completed final sign-off Nov 2017 | 763 Mission St | temporary installation of 4 walls in (e) gallery space. walls will be removed in 90 days. all work is insideDetails
temporary installation of 4 walls in (e) gallery space. walls will be removed in 90 days. all work is inside | $12,000 | |
| Oct 16, 2014 | Never finaled issued Jan 2015, no final | 763 Mission St | no remodel work for new licensee business. no change of use. kiosk space no. fc01 in metreon mall. no changes or location of kiosk.Details
no remodel work for new licensee business. no change of use. kiosk space no. fc01 in metreon mall. no changes or location of kiosk. | ||
| Sep 10, 2014 | Completed final sign-off Nov 2014 | 155 04th St | Steve Julius Construction, Inc. | space #1050 - adding a additional power feed from electrical boon ic to the restaurant space. removing transformer load from existing 200a service.Details
space #1050 - adding a additional power feed from electrical boon ic to the restaurant space. removing transformer load from existing 200a service. | $4,000 |
| Jun 25, 2014 | Completed final sign-off Aug 2014 | 155 04th St | Certified Fire & Safety Co | space #1050: install ul 300 ansul fire system to protect kitchen hood and cooking equipment, ref 201304194994Details
space #1050: install ul 300 ansul fire system to protect kitchen hood and cooking equipment, ref 201304194994 | $6,000 |
| Mar 5, 2014 | Completed final sign-off Sep 2014 | 155 04th St | Steve Julius Construction, Inc. | revision to 201304194994. change to plumbing waste linesDetails
revision to 201304194994. change to plumbing waste lines | |
| Feb 21, 2014 | Completed final sign-off Nov 2014 | 155 04th St | Steve Julius Construction, Inc. | #1050 - revision to pa # 2013.04.19.4994: additional structural steel added at low ground level.Details
#1050 - revision to pa # 2013.04.19.4994: additional structural steel added at low ground level. | $45,000 |
| Feb 12, 2014 | Completed final sign-off Aug 2014 | 155 04th St | Rcm Fire Protection Inc. | #1050: add and relocate sprinklers to fit new configuration. ref app#201304094994. n/a for the interim controls #428-13Details
#1050: add and relocate sprinklers to fit new configuration. ref app#201304094994. n/a for the interim controls #428-13 | $6,000 |
| Jan 23, 2014 | Never finaled issued Jan 2014, no final | 155 04th St | street space | ||
| Jan 21, 2014 | Completed final sign-off Nov 2014 | 155 04th St | Steve Julius Construction, Inc. | plan revision to app#201304194994. mech and electrical sheet to be revised.Details
plan revision to app#201304194994. mech and electrical sheet to be revised. | $5,000 |
| Jun 28, 2013 | Completed final sign-off Sep 2013 | 763 Mission St | Build Group Inc. | erect a non electric single faced indirect new signDetails
erect a non electric single faced indirect new sign | $1,000 |
| Jun 28, 2013 | Completed final sign-off Sep 2013 | 763 Mission St | Build Group Inc. | exterior of mission street to be modified for an addition of an atm machine with signageDetails
exterior of mission street to be modified for an addition of an atm machine with signage | $15,000 |
| May 14, 2013 | Completed final sign-off May 2014 | 155 04th St | Arrow Sign Company | erect an electric projecting double faced direct new signDetails
erect an electric projecting double faced direct new sign | $1,500 |
| May 14, 2013 | Completed final sign-off May 2014 | 155 04th St | Arrow Sign Company | erect an electric projecting double faced direct new signDetails
erect an electric projecting double faced direct new sign | $3,000 |
| Apr 19, 2013 | Completed final sign-off Nov 2014 | 155 04th St | Steve Julius Construction, Inc. | space #1050 - t.i. for restaurant "noodles & co." walls, ceiling, finishes, lighting, new plumbing, hvac units.Details
space #1050 - t.i. for restaurant "noodles & co." walls, ceiling, finishes, lighting, new plumbing, hvac units. | $350,000 |
| Dec 18, 2012 | Never finaled issued Jul 2013, no final | 763 Mission St | Security Vault Works Inc. | metreon bldg: new bank of america atm and custom signage to be installed. (atm unit with exterior pre-finish to be installed into pre-made opening)Details
metreon bldg: new bank of america atm and custom signage to be installed. (atm unit with exterior pre-finish to be installed into pre-made opening) | $2,500 |
| Nov 29, 2012 | Completed final sign-off Dec 2012 | 135 04th St | S Visions Construction | installation of a new 278 sq ft information kiosk. the new kiosk is fabricated elsewaher and is delivered on site where it is assenbled and connected to the malls extg floor receptacles.Details
installation of a new 278 sq ft information kiosk. the new kiosk is fabricated elsewaher and is delivered on site where it is assenbled and connected to the malls extg floor receptacles. | $40,000 |
| Nov 15, 2012 | Never finaled issued Nov 2012, no final | 135 04th St | address at 135 4th st ste. #9100 | ||
| Jul 26, 2012 | Expired or cancelled cancelled Jan 2026 | 783 Mission St | painted wall sign at store front | $500 | |
| Jul 5, 2012 | Completed final sign-off Feb 2013 | 783 Mission St | Arrow Sign Company | erect an electric single faced on top of existing canopy. (scope of work - sign a: install illuminated channel letters on a raceway. attach to front of marquee/canopy 13"x9'9")Details
erect an electric single faced on top of existing canopy. (scope of work - sign a: install illuminated channel letters on a raceway. attach to front of marquee/canopy 13"x9'9") | $2,500 |
| Jul 5, 2012 | Completed final sign-off Oct 2012 | 783 Mission St | Arrow Sign Company | erect an electric double faced projecting sign. (scope of work - sign b: install illuminated sign under marquee/canopy 2'x3.5')Details
erect an electric double faced projecting sign. (scope of work - sign b: install illuminated sign under marquee/canopy 2'x3.5') | $2,500 |
| Jul 3, 2012 | Never finaled issued Jul 2012, no final | 783 Mission St | to create address at metreon "super duper burger" as 783 mission st. block 3723, lot 113.Details
to create address at metreon "super duper burger" as 783 mission st. block 3723, lot 113. | ||
| Jun 29, 2012 | Completed final sign-off Jul 2012 | 763 Mission St | Certified Fire & Safety Co | install ansul fire system in kitchen hood ( refer appl #2012.02.06.3595)Details
install ansul fire system in kitchen hood ( refer appl #2012.02.06.3595) | $4,000 |
| Feb 6, 2012 | Completed final sign-off Dec 2012 | 763 Mission St | Terra Nova Industries | tenant improvement to new restaurant super duper burger. work include ti of extg shell to self service restaurant. include main dining space with mezzanine.fire alarm and sprinkler under seperate permit.Details
tenant improvement to new restaurant super duper burger. work include ti of extg shell to self service restaurant. include main dining space with mezzanine.fire alarm and sprinkler under seperate permit. | $444,000 |
| May 5, 2006 | Never finaled issued May 2006, no final | 763 Mission St | sidewalk |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Steve Julius Construction, Inc. (5), Arrow Sign Company (4), Insign Electric (3), Build Group Inc. (2), Certified Fire & Safety Co (2), Security Vault Works Inc. (2), Ares Holdings Llc, J S Modern Construction Inc, Johnson Controls Fire, Metropolitan Electrical Construction, Modelo Design Build Co., Modl Construction, My Build Core Llc, Rcm Fire Protection Inc., S Visions Construction, Terra Nova Industries
- Architects
- Jay Sherlock (2), Rex Mclean (2), James Zack, Kevin Wineinger, Samuel Kwong
- Engineers
- Bernard Adebayoige, Casey J Steiner, Chad Andrew Konger, James R. Spore, John Hoerner, Man Chiu Yu, Rick Sabatello
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.