Beyond Basics Construction
- Based in
- Danville
- On San Francisco permits
- Jun 2019 to Nov 2020
- Last 24 months
- 0 permits filed
2 permits since 2000: 1 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 12, 2020 | Completed final sign-off Jul 2022 | 1800 Pacific Av | install new 2 hr. fire rated walls to enlarge existing electrical room, 90 minute double doors at fire rated wall, new install new switchgear and residential meters. install temporary meters to facilitate replacement.Details
install new 2 hr. fire rated walls to enlarge existing electrical room, 90 minute double doors at fire rated wall, new install new switchgear and residential meters. install temporary meters to facilitate replacement. | $5,000 |
| Jun 14, 2019 | Expired or cancelled expired Oct 2019 | 150 Parker Av | barrier removal only for an existing bathroom that does consist of child water closet and adult water closet per 2016 iib202,4 exception 4Details
barrier removal only for an existing bathroom that does consist of child water closet and adult water closet per 2016 iib202,4 exception 4 | $40,000 |