Back to kitchen remodel contractors
Gci, Inc
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Sep 2026
- Last 24 months
- 213 permits filed
3,137 permits since 2000: 2,319 completed, 142 in progress, 402 never finaled, 274 expired or cancelled.
Of the 402 never-finaled permits, 27 are 3 to 5 years old, 98 are 5 to 10 years old, 277 are over 10 years old. 3 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
15 kitchen remodel permits: 12 completed, 2 in progress, 1 never finaled. Typically 30 days from filing to permit and 267 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 9, 2025 | In progress issued Dec 2025 | 535 Mission St | 9th fl - commercial ti demo & construction of non-structural partitions, ceilings, finishes & furniture/equipment expansion of existing pantry/break area (not mirco-kitchen)Details
9th fl - commercial ti demo & construction of non-structural partitions, ceilings, finishes & furniture/equipment expansion of existing pantry/break area (not mirco-kitchen) | $186,000 |
| Aug 19, 2025 | In progress issued Apr 2026 | 88 Spear St | construction of new non-structural partitions and wall finishes; installation of new flooring, ceiling, lighting, millwork, kitchen equipment; plumbing, electrical and lighting support proposed use; hvac modifications for new layoutDetails
construction of new non-structural partitions and wall finishes; installation of new flooring, ceiling, lighting, millwork, kitchen equipment; plumbing, electrical and lighting support proposed use; hvac modifications for new layout | $637,000 |
| Nov 17, 2022 | Completed final sign-off Nov 2023 | 1905 Union St | tenant improvement on 2nd floor, buildout of two restrooms. janitors closet bar, dining and kitchen. change of use from office to restaurant.Details
tenant improvement on 2nd floor, buildout of two restrooms. janitors closet bar, dining and kitchen. change of use from office to restaurant. | $182,505 |
| Sep 21, 2022 | Completed final sign-off Jul 2023 | 100 Hooper St | g/f: buildout of ancillary bmd & break room. scope to demo non-structural interior wall, update kitchenette, door replacement, finishes, lighting, and mep.Details
g/f: buildout of ancillary bmd & break room. scope to demo non-structural interior wall, update kitchenette, door replacement, finishes, lighting, and mep. | $100,000 |
| Apr 10, 2019 | Completed final sign-off Feb 2021 | 50 Fremont St | 27th fl - new partitions, ceiling, furniture, finishes, light fixtures & mechanical plumbing and electrical infill for floor opening. employee self serve kitchen. new horizontal exit. new two-way comms under separate permit.Details
27th fl - new partitions, ceiling, furniture, finishes, light fixtures & mechanical plumbing and electrical infill for floor opening. employee self serve kitchen. new horizontal exit. new two-way comms under separate permit. | $4,700,000 |
| Mar 22, 2019 | Completed final sign-off Apr 2021 | 100 Hooper St | mep reference 201901291477; mechanical new fan coils kitchen exhaust fan, exhaust fans, new fire smoke dampers, lighting power and signal plumbingDetails
mep reference 201901291477; mechanical new fan coils kitchen exhaust fan, exhaust fans, new fire smoke dampers, lighting power and signal plumbing | $900,000 |
| May 16, 2018 | Completed final sign-off Mar 2019 | 160 Spear St | ti work to add retail sales area for model unit, including model kitchen and bath, add restroom, kitchen not to be plumbed, mep deferredDetails
ti work to add retail sales area for model unit, including model kitchen and bath, add restroom, kitchen not to be plumbed, mep deferred | $760,000 |
| Apr 28, 2016 | Completed final sign-off May 2017 | 333 Brannan St | restaurant build out of an exisitng shell. indoor & outdoor dining areas, bar, kitchen, food/beverage storage & bathrooms. including but not limited to built-in furniture & interior walls & finishes.new hood & duct & air /maid bleed of system n/a for maher ordinance no. 155-13Details
restaurant build out of an exisitng shell. indoor & outdoor dining areas, bar, kitchen, food/beverage storage & bathrooms. including but not limited to built-in furniture & interior walls & finishes.new hood & duct & air /maid bleed of system n/a for maher ordinance no. 155-13 | $430,000 |
| Jun 4, 2015 | Completed final sign-off Apr 2016 | 1100 Sacramento St | unit 1004, 10th fl remodel of bahrs, kitchen, demo and construction of non structural interior partitions. replace all windows at 1004 in kindDetails
unit 1004, 10th fl remodel of bahrs, kitchen, demo and construction of non structural interior partitions. replace all windows at 1004 in kind | $250,000 |
| May 8, 2015 | Completed final sign-off Aug 2015 | 550 03rd St | voluntary barrier removal, construct 2 new accessible restrooms, make kitchen millwork accessibleDetails
voluntary barrier removal, construct 2 new accessible restrooms, make kitchen millwork accessible | $35,000 |
| Oct 17, 2012 | Completed final sign-off Feb 2013 | 601 California St | suite 607:interior tenant improvement of an (e) 6th floor office suite. demo of (e) walls at kitchen/workroom & conference room to replace w/ sliding partition & add curved wall to entry.Details
suite 607:interior tenant improvement of an (e) 6th floor office suite. demo of (e) walls at kitchen/workroom & conference room to replace w/ sliding partition & add curved wall to entry. | $110,300 |
| Aug 18, 2010 | Never finaled issued Sep 2010, no final | 1 Kearny St | remodel of 2 rooms on south portion of 11th floor of existing office bldg. existing condition of 2 rooms are finished shell. rooms will be conference room and warming kitchen for meetings. ref 200607136416s,s-3. tco has been issued but final pending.Details
remodel of 2 rooms on south portion of 11th floor of existing office bldg. existing condition of 2 rooms are finished shell. rooms will be conference room and warming kitchen for meetings. ref 200607136416s,s-3. tco has been issued but final pending. | $250,000 |
| Feb 9, 2009 | Completed final sign-off May 2009 | 825 Battery St | minor demolition of conference room and kitchen. construction of 2 new offices, new shower room, new break room and reception. new outlets and tel/data for new spaces. less than 50% of light fixtures. plumbing work @ break & shower room. reconfiguration of sprinklear heads as required.Details
minor demolition of conference room and kitchen. construction of 2 new offices, new shower room, new break room and reception. new outlets and tel/data for new spaces. less than 50% of light fixtures. plumbing work @ break & shower room. reconfiguration of sprinklear heads as required. | $75,000 |
| Aug 29, 2008 | Completed final sign-off Apr 2009 | 101 02nd St | office tenant improvement to 11th floor of 25 story, full sprinklered office building. approx 14000 sf ti includes new carpet, new non load bearing partitions, new millwork, new kitchen area, new workstations, and new doors. mep separate permitDetails
office tenant improvement to 11th floor of 25 story, full sprinklered office building. approx 14000 sf ti includes new carpet, new non load bearing partitions, new millwork, new kitchen area, new workstations, and new doors. mep separate permit | $700,000 |
| Mar 23, 2004 | Completed final sign-off Jan 2005 | 1 Sansome St | 8/f-conference room & kitchen life safetyDetails
8/f-conference room & kitchen life safety | $7,500 |