Back to bathroom remodel contractors
Gci, Inc
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Sep 2026
- Last 24 months
- 213 permits filed
3,137 permits since 2000: 2,319 completed, 142 in progress, 402 never finaled, 274 expired or cancelled.
Of the 402 never-finaled permits, 27 are 3 to 5 years old, 98 are 5 to 10 years old, 277 are over 10 years old. 3 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
15 bathroom remodel permits: 12 completed, 1 in progress, 2 never finaled. Typically 11 days from filing to permit and 212 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 13, 2021 | Completed final sign-off Feb 2022 | 201 03rd St | 10/f: install (1) inline exhaust fan in the all gender bathroom in level 10, redistrution ductwork lighting & power. "landlord" ref t.i. 202107234982.Details
10/f: install (1) inline exhaust fan in the all gender bathroom in level 10, redistrution ductwork lighting & power. "landlord" ref t.i. 202107234982. | $100,000 |
| Mar 24, 2021 | In progress issued Sep 2025 | 900 Sansome St | change of use and occupancy from s-2 (parking garage) to b (office) use, including: a new elevator, egress and ada bathroom upgradesDetails
change of use and occupancy from s-2 (parking garage) to b (office) use, including: a new elevator, egress and ada bathroom upgrades | $260,000 |
| Sep 12, 2019 | Completed final sign-off Sep 2019 | 1685 Haight St | revision to 201902082526: reconfiguration of bathroom to accomodate e unforseen conditionsDetails
revision to 201902082526: reconfiguration of bathroom to accomodate e unforseen conditions | |
| Aug 30, 2018 | Completed final sign-off Jun 2019 | 360 Post St | accessibility of upgrade for floors 4,6,9,10,11. work includes upgrading existing bathrooms and elevator lobby and adding drinking fountains off path of travel corridorsDetails
accessibility of upgrade for floors 4,6,9,10,11. work includes upgrading existing bathrooms and elevator lobby and adding drinking fountains off path of travel corridors | $353,995 |
| Jul 30, 2018 | Completed final sign-off Sep 2019 | 1 Maritime Pz | demolition of existing non-structural partions, finishes, plumbing fixtures, ceiling & lights. construction of non-structural walls, bathroom, finishes & plumbing fixtures, ceiling & lights. mep life safety & sprinklers under separtae permite. seismic upgrades under separate permitDetails
demolition of existing non-structural partions, finishes, plumbing fixtures, ceiling & lights. construction of non-structural walls, bathroom, finishes & plumbing fixtures, ceiling & lights. mep life safety & sprinklers under separtae permite. seismic upgrades under separate permit | $205,300 |
| May 16, 2018 | Completed final sign-off Mar 2019 | 160 Spear St | ti work to add retail sales area for model unit, including model kitchen and bath, add restroom, kitchen not to be plumbed, mep deferredDetails
ti work to add retail sales area for model unit, including model kitchen and bath, add restroom, kitchen not to be plumbed, mep deferred | $760,000 |
| Aug 15, 2016 | Completed final sign-off Feb 2017 | 180 Sutter St | ground flr: ti- new tenant. work includes new partitions, fixtures, finishes, new bathrooms, pantry, mep. no exterior work, fire protection under sep permit.Details
ground flr: ti- new tenant. work includes new partitions, fixtures, finishes, new bathrooms, pantry, mep. no exterior work, fire protection under sep permit. | $480,000 |
| Jul 6, 2016 | Completed final sign-off Dec 2020 | 1400 Mission St | suite #140: interior walls for new bathroom and provide lay-in acoustical ceiling with light fixtures. all other work for future tenant will be by others under separate permit.Details
suite #140: interior walls for new bathroom and provide lay-in acoustical ceiling with light fixtures. all other work for future tenant will be by others under separate permit. | $190,000 |
| Apr 28, 2016 | Completed final sign-off May 2017 | 333 Brannan St | restaurant build out of an exisitng shell. indoor & outdoor dining areas, bar, kitchen, food/beverage storage & bathrooms. including but not limited to built-in furniture & interior walls & finishes.new hood & duct & air /maid bleed of system n/a for maher ordinance no. 155-13Details
restaurant build out of an exisitng shell. indoor & outdoor dining areas, bar, kitchen, food/beverage storage & bathrooms. including but not limited to built-in furniture & interior walls & finishes.new hood & duct & air /maid bleed of system n/a for maher ordinance no. 155-13 | $430,000 |
| Dec 11, 2015 | Never finaled issued Dec 2015, no final | 221 Main St | 14/f: bathroom upgrades - relocation of partitions to accomodate required handicap accessible door clearance in the men's restroom. all work to consist of barrier removal. maher naDetails
14/f: bathroom upgrades - relocation of partitions to accomodate required handicap accessible door clearance in the men's restroom. all work to consist of barrier removal. maher na | $405,000 |
| Jun 18, 2015 | Completed final sign-off Aug 2015 | 550 03rd St | 1st floor:install bathroom exhaust. ref. to t.i. pa#201505085783. n/a ordinance #155-13Details
1st floor:install bathroom exhaust. ref. to t.i. pa#201505085783. n/a ordinance #155-13 | $3,000 |
| Nov 3, 2014 | Completed final sign-off Aug 2015 | 2601 Mariposa St | this is a revision for 36" clearance min. inside bathroom & minor dimension correction per as built condition, permit appn. 201408274903; maher n/aDetails
this is a revision for 36" clearance min. inside bathroom & minor dimension correction per as built condition, permit appn. 201408274903; maher n/a | |
| Jul 2, 2014 | Never finaled issued Aug 2014, no final | 120 08th St | interior tenant improvement, 1/f, mezzanine, 2/f - including ada bathroom upgrades, replacement of front egress interior stair and partial 2/f strengthening. n/a ordinance #155-13Details
interior tenant improvement, 1/f, mezzanine, 2/f - including ada bathroom upgrades, replacement of front egress interior stair and partial 2/f strengthening. n/a ordinance #155-13 | $321,000 |
| May 24, 2012 | Completed final sign-off Jan 2013 | 595 Market St | 23rd floor - t.i. including demolition, new partition, framing, electric & ceiling construciton update bathrooms to ada compliance will include new plumbing, lighting, & related finishes. no structural work to be performed.Details
23rd floor - t.i. including demolition, new partition, framing, electric & ceiling construciton update bathrooms to ada compliance will include new plumbing, lighting, & related finishes. no structural work to be performed. | $200,000 |
| Jan 22, 2008 | Completed final sign-off Mar 2008 | 575 Market St | fire sprinklers on 38th floor. for corridor and bathroom area. add 13 new heads. no deleting or relocating. no calcs.Details
fire sprinklers on 38th floor. for corridor and bathroom area. add 13 new heads. no deleting or relocating. no calcs. | $3,000 |