Nicholas Decoster
- License
- E22614
- Electrical engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up E22614 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Henderson Engineers
- Based in
- Lenexa
- On San Francisco permits
- Sep 2019 to Jun 2024
3 permits since 2000 (engineer on 3 permits): 3 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Jorgensen-Reeve Builders (2), Build Group Inc.
- Architects
- David D. Montalba (2), Brian Milford
- Engineers
- Eric C Taylor (2), Craig Chamberlain, Scott Bikson
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 1
- Other or unknown 2
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 17, 2024 | Completed final sign-off Oct 2024 | 3225 Fillmore St | Build Group Inc. | new non-bearing partitions, doors, finishes, ceilings, lighting, mep and floor infill. replacement of (e) storefront double entry door w/ (n) storefront double door entry and side lites.Details
new non-bearing partitions, doors, finishes, ceilings, lighting, mep and floor infill. replacement of (e) storefront double entry door w/ (n) storefront double door entry and side lites. | $200,000 |
| Dec 19, 2019 | Completed final sign-off Dec 2021 | 1500 Mission St | Jorgensen-Reeve Builders | rev to pa201905039670 - interior non-structural partiion configuration & assocated mep.Details
rev to pa201905039670 - interior non-structural partiion configuration & assocated mep. | |
| Sep 9, 2019 | Completed final sign-off Jan 2020 | 1543 Mission St | Jorgensen-Reeve Builders | temporary ti within an existing building to be used as pre-sales showroomDetails
temporary ti within an existing building to be used as pre-sales showroom | $330,000 |